JADWAL PENUGASAN PERSONIL INTI DAN TENAGA KERJA

### ###
### ###
### ###

JADWAL PENUGASAN PERSONIL INTI DAN TENAGA KERJA

NO. JABATAN PERSONIL NAMA PERSONIL VOLUME SATUAN BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI KET

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

A. PERSONIL INTI

#REF! Site Manager Nasruddin, ST 1 Org

#REF! Pelaksana Syahrial, ST 1 Org

#REF! Adm & Keuangan #NAME? 1 Org

4 Surveyor #NAME? 1 Org

5 Draftman #NAME? 1 Org

B. TENAGA KERJA

1 Operator Alat Berat Anton 1 Org

2 Kepala Tukang Sugiono, CS 5 Org

3 Tukang Martin, CS 15 Org

4 Mandor Lutfi, CS 5 Org

5 Pekerja Buyung, CS 40 Org

6 Penjaga Keamanan Bambang, CS 2 Org


JADWAL PENGGUNAAN PERALATAN

### ###
### ###
### ###

JADWAL PENGGUNAAN PERALATAN

NO. URAIAN NAMA ALAT VOLUME SATUAN BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI KET

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

#REF! Dump Truck 11 Unit

#REF! Excavator 1 Unit

#REF! Concrete Mixer 2 Unit

#REF! Water Pump 1 Unit


JADWAL PENGGUNAAN BAHAN / MATERIAL

### ###
### ###
### ###

JADWAL PENGGUNAAN BAHAN / MATERIAL


NO. URAIAN NAMA BAHAN / MATERIAL VOLUME SATUAN BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

### #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
### #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
- Tanah Timbun #REF! #REF!
#REF! #REF! #REF! #REF!
- Cerucuk Bambu #REF! #REF!
#REF! #REF! #REF! #REF!
- Semen Portland 4,312.50 kg
- Pasir Beton 16,743.75 kg
- Kerikil (Maks 30 mm) 19,256.25 kg
- Air 3,750.00 Liter
#REF! #REF! #REF! #REF!
- Batu Belah/ Kali 417.60 m3
- Semen Portland 56,724.00 Kg
- Pasir Pasang 180.96 m3
### #REF!
#REF! #REF! #REF! #REF!
- Semen Portland 5,141.76 kg
- Pasir Beton 9,265.88 kg
- Kerikil (Maks 30 mm) 13,912.21 kg
- Air 2,878.85 Liter
- Besi Beton Polos 14.06 Kg
- Kawat Beton 0.20 Kg
- Kayu Klas III 0.54 m3
- Paku 5 - 10 cm 5.36 kg
- Minyak Bekesting 2.68 liter
- Balok Kayu Klas II 0.20 m3
- Plywood tebal 9 mm 4.69 Lbr
- Dolken kayu ᴓ 8 - 10 cm - P. 4m 26.78 Batang
#REF! #REF! #REF! #REF!
- Semen Portland 4,608.00 kg
- Pasir Beton 8,304.00 kg
- Kerikil (Maks 30 mm) 12,468.00 kg
- Air 2,580.00 Liter
- Besi Beton Polos 12.60 Kg
- Kawat Beton 0.18 Kg
- Kayu Klas III 0.48 m3
- Paku 5 - 10 cm 4.80 kg
- Minyak Bekesting 2.40 liter
- Balok Kayu Klas II 0.22 m3
- Plywood tebal 9 mm 4.20 Lbr
- Dolken kayu ᴓ 8 - 10 cm - P. 4m 24.00 Batang
#REF! #REF! #REF! M3
- Semen Portland 7,372.80 kg
- Pasir Beton 13,286.40 kg
- Kerikil (Maks 30 mm) 19,948.80 kg
- Air 4,128.00 Liter
- Besi Beton Polos 20.16 Kg
- Kawat Beton 0.29 Kg
- Kayu Klas III 0.77 m3
- Paku 5 - 10 cm 7.68 kg
- Minyak Bekesting 3.84 liter
- Balok Kayu Klas II 0.35 m3
- Plywood tebal 9 mm 6.72 Lbr
- Dolken kayu ᴓ 8 - 10 cm - P. 4m 38.40 Batang
#REF! #REF! #REF! #REF!
- Semen Portland 28,753.92 kg
- Pasir Beton 51,816.96 kg
- Kerikil (Maks 30 mm) 77,800.32 kg
- Air 16,099.20 Liter
- Besi Beton Polos 78.62 Kg
- Kawat Beton 1.12 Kg
#REF! #REF! #REF! #REF!
### #REF!
#REF! #REF! #REF! #REF!
- Semen Portland 624.00 Kg
### #REF!
#REF! #REF! #REF! #REF!
- Semen Portland 66,930.00 kg
- Pasir Beton 259,863.00 kg
- Kerikil (Maks 30 mm) 298,857.00 kg
- Air 58,200.00 Liter
### #REF!
#REF! #REF! #REF! #REF!
- Plamur 19.20 Kg
- Cat Dasar 19.20 Kg
- Cat Penutup 49.92 Kg
### #REF!
#REF! #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
### #REF!
#REF! #REF! #REF! #REF!

Jadwal ini mengacu pada koefisien pada Analisa harga satuan pekerjaan, jika analisa nya adalah Taksir maka bahan yang digunakan tidak dijabarkan
JADWAL PELAKSANAAN (KURVA S)

JADWAL PELAKSANAAN PEKERJAAN


BOBOT
NO. URAIAN PEKERJAAN JUMLAH HARGA PEKERJAAN (%)
BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Rp. 1,000,000.00 0.06 0.06
2 Pemasangan Bowplank Rp. 1,000,000.00 0.06 0.06
3 Direksikeet / Gudang Rp. 6,000,000.00 0.38 0.38
4 Adm, Dokumentasi, BPJS Rp. 4,000,000.00 0.25 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
5 Papan Nama Proyek Rp. 500,000.00 0.03 0.03
6 Listrik Dan Air Kerja Rp. 3,900,000.00 0.25 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
B. PEKERJAAN TANAH
1 Galian Tanah Pondasi Rp. 99,780,010.00 6.29 1.57 1.57 1.57 1.57
2 Urugan kembali bekas galian Rp. 22,604,206.02 1.42 1.42
3 Urugan pasir bawah lantai /pondasi Rp. 6,385,702.40 0.40 0.20 0.20
C. PEKERJAAN PONDASI
1 Pas batu kosong (Aanstamping) Rp. 15,769,850.34 0.99 0.4968 0.4968
2 Pondasi batu gunung/Kali 1Pc : 4Ps Rp. 437,405,501.50 27.56 6.8895 6.8895 6.8895 6.8895
3 Beton Lantai Kerja (K100) Rp. 25,218,106.05 1.59 0.7944 0.7944
D. PEKERJAAN BETON BERTULANG
1 Beton Pondasi Tapak 100 x 60 cm
- Beton K-225 Rp. 44,244,501.59 2.79 2.79
- Besi Beton Polos Rp. 26,175,631.99 1.65 0.82 0.82
- Bekesting Rp. 16,770,933.48 1.06 0.53 0.53
TIPE A
2 Beton Sloof 30 x 20 cm
- Beton K-225 Rp. 8,677,262.17 0.55 0.55
- Besi Beton Polos Rp. 15,058,602.00 0.95 0.95
- Bekesting Rp. 5,937,818.89 0.37 0.37
3 Beton Kolom 50 x 50 cm
- Beton K-225 Rp. 1,546,862.36 0.10 0.10
- Besi Beton Polos Rp. 1,016,168.30 0.06 0.06
- Bekesting Rp. 1,038,449.11 0.07 0.07
4 Beton Kolom 30 x 30 cm
- Beton K-225 Rp. 17,969,031.30 1.13 1.13
- Besi Beton Polos Rp. 27,116,101.80 1.71 0.8542 0.8542
- Bekesting Rp. 20,828,499.95 1.31 0.6561 0.6561
5 Beton Kolom 30 x 15 cm Tipe 1 (Tinggi 2m)
- Beton K-225 Rp. 4,577,017.41 0.29 0.29
- Besi Beton Polos Rp. 9,669,715.79 0.61 0.61
- Bekesting Rp. 5,138,717.23 0.32 0.32
6 Beton Kolom 30 x 15 cm Tipe 2 (Tinggi 2,14 m)
- Beton K-225 Rp. 2,447,432.92 0.15 0.15
- Besi Beton Polos Rp. 5,173,313.26 0.33 0.33
- Bekesting Rp. 2,749,570.57 0.17 0.17
7 Ring Balok 10x10
- Beton K-225 Rp. 717,277.96 0.05 0.05
- Besi Beton Polos Rp. 1,923,966.71 0.12 0.12
- Bekesting Rp. 2,415,910.81 0.15 0.15
8 Beton Balok 15 x 10 cm
- Beton K-225 Rp. 2,072,371.77 0.13 0.13
- Besi Beton Polos Rp. 5,676,073.72 0.36 0.36
- Bekesting Rp. 4,653,393.94 0.29 0.29
TIPE B
1 Beton Sloof 30 x 20 cm
- Beton K-225 Rp. 33,278,730.72 2.10 2.10
- Besi Beton Polos Rp. 57,752,985.38 3.64 1.8193 1.8193
- Bekesting Rp. 37,362,756.54 2.35 1.177 1.177
2 Beton Ring Balk Pagar Samping & Belakang 30 x20 cm
- Beton K-225 Rp. 33,278,730.72 2.10 2.10
- Besi Beton Polos Rp. 57,752,985.38 3.64 1.8193 1.8193
- Bekesting Rp. 37,362,756.54 2.35 1.177 1.177
3 Kolom Pagar Samping & Belakang 25 x 25 cm
- Beton K-225 Rp. 18,753,057.43 1.18 1.18
- Besi Beton Polos Rp. 38,577,494.27 2.43 1.2153 1.2153
- Bekesting Rp. 25,265,359.72 1.59 0.7959 0.7959
4 Stik Pondasi Besi Ø 10 Rp. 1,352,071.22 0.09 0.09
E. PEKERJAAN DINDING DAN PLESTERAN
1 Pasangan bata 1 PC : 4 PP tebal 1/2 Bata Pagar Rp. 6,841,597.29 0.43 0.43
2 Plesteran bata 1 PC : 4 PP (Dinding) Pagar Tipe Rp. 7,666,888.02 0.48 0.48
3 Pasangan bata 1 PC : 4 PP tebal 1/2 Bata Pagar Rp. 105,402,572.80 6.64 2.2136 2.2136 2.2136
4 Plesteran bata 1 PC : 4 PP (Dinding) Pagar Tipe Rp. 114,672,444.35 7.22 1.8062 1.8062 1.8062 1.8062
5 Plasteran Kolom 25/25 Rp. 13,877,648.40 0.87 0.87
6 Plesteran Balok 30/20 Rp. 21,473,439.11 1.35 1.35
7 Plasteran Kolom Pintu Gerbang 50/50 Rp. 397,871.50 0.03 0.03
8 Plasteran Kolom Pagar Depan 30/30 Rp. 4,347,874.08 0.27 0.27
9 Plasteran Kolom Minimalis 30/15 Tipe 1 Rp. 1,968,848.64 0.12 0.12
10 Plasteran Kolom Minimalis 30/15 Tipe 2 Rp. 1,053,470.75 0.07 0.07
11 Plasteran Ring Balk 15/13 Rp. 2,674,352.74 0.17 0.17
F. PEKERJAAN CAT
1 Cat Dinding Luar dalam Rp. 4,923,837.60 0.31 0.31
2 Tipe A
Cat Kolom Pintu Gerbang 50/50 Rp. 145,613.49 0.01 0.01
Cat Kolom Pagar Depan 30/30 Rp. 1,591,240.20 0.10 0.10
Cat Kolom Praktis Minimalis 30/15 Tipe 1 Rp. 72,056.16 0.00 0.00
Cat Kolom Praktis Minimalis 30/15 Tipe 2 Rp. 38,530.03 0.00 0.00
Cat Kolom Praktis 13/13 Rp. 85,816.89 0.01 0.01
Cat Ring Balk 15/13 Rp. 978,762.84 0.06 0.06
3 Tipe B
Cat Dinding Luar dalam Rp. 23,981,691.14 1.51 0.7555 0.7555
Cat Kolom 25/25 Rp. 3,874,895.06 0.24 0.24
Cat Balok 30/20 Rp. 7,858,775.07 0.50 0.50
G. PEKERJAAN PINTU PAGAR DAN BESI HOLLOW
1 Acian Kolom Pintu Pagar Rp. 125,008.33 0.01 0.01
2 Cap Kolom Pintu Pagar Rp. 2,000,000.00 0.13 0.13
3 Pek. Pintu Pagar Besi Hollow Lengkap Terpasan Rp. 5,000,000.00 0.32 0.1575 0.1575
4 Pek. Pagar Besi Hollow (Di atas Tembok) Rp. 31,752,000.00 2.00 1.00 1.00
H. PEKERJAAN PAPAN NAMA
1 Pekerjaan Galian Tanah Rp. 371,690.00 0.02 0.02
2 Urugan Kembali Rp. 53,161.35 0.00 0.0033
3 Tanah Timbun (didatangkan) Rp. 270,963.00 0.02 0.02
4 Urugan Pasir Bawah Pondasi dan Sloof Pot Rp. 56,524.16 0.00 0.00
5 Aanstamping Rp. 210,867.15 0.01 0.01
6 Pondasi Batu Gunung/Kali Rp. 2,456,345.38 0.15 0.15
7 Pekerjaan Beton Tapak Pot Bunga Rp. 188,664.14 0.01 0.01
8 Pek. Sloof 13/13
- Beton K-225 Rp. 286,063.59 0.02 0.02
- Besi Beton Polos Rp. 1,037,171.35 0.07 0.07
- Bekesting Rp. 729,769.22 0.05 0.05
9 Pek. Sloof 20/20
- Beton K-225 Rp. 296,658.54 0.02 0.02
- Besi Beton Polos Rp. 535,723.58 0.03 0.03
- Bekesting Rp. 497,813.23 0.03 0.03
10 Kolom 13/13
- Beton K-225 Rp. 95,354.53 0.01 0.01
- Besi Beton Polos Rp. 365,657.23 0.02 0.02
- Bekesting Rp. 256,935.86 0.02 0.02
11 Pasangan Bata 1:2 Rp. 1,223,072.54 0.08 0.08
12 Pasangan Bata 1:4 Rp. 1,168,751.93 0.07 0.07
13 Pek. Plasteran 1:2 Rp. 662,261.75 0.04 0.04
14 Pek. Plasteran 1:4 Rp. 635,774.04 0.04 0.04
15 Pengecatan Papan Nama Rp. 458,357.24 0.03 0.20
16 Pek. Pasangan Granit Hitam 60.60 cm Rp. 3,157,000.00 0.20 0.20
17 Pek. Pasangan Huruf Stailess Steel Rp. 6,000,000.00 0.38 0.38
18 Pek. Pasangan Logo Acriliyc Rp. 3,000,000.00 0.19 0.19
19 Penanaman Bunga Rp. 2,000,000.00 0.13 0.13
I. PEKERJAAN AKHIR
1 Pembersihan Akhir Rp. 500,000.00 0.03 0.03

JUMLAH Rp. 1,587,214,743.50 100.00


BOBOT PEKERJAAN 0.56 1.60 3.15 13.92 9.98 9.91 17.48 10.32 2.41 4.26 7.10 8.18 1.91 3.12 2.08 1.18 0.02 1.40 1.52 0.06
BOBOT PEKERJAAN KOMULATIF 0.00 0.56 2.16 5.31 19.23 29.20 39.11 56.60 66.92 69.33 73.59 80.69 88.87 90.78 93.90 95.99 97.17 97.19 98.42 99.94 100.00