Professional Documents
Culture Documents
Risk Assessment Ground Collapse 8
Risk Assessment Ground Collapse 8
Location: QASSIM Task Ground collapse Risk assessment type Initial Review
Risk assessment
(before controls)
Hazards
Risk factor
Likelihood
Who affected How affected
Severity
(check all that apply) Risk
level
Injuries • Pumps or other dewatering systems to remove water and prevent build-up
Death • Proper PPE
• Proper training
Water inrush • Proper supervision
2 2 4 4
2 2 4 4
(before controls)
Hazards
Risk factor
Likelihood
Who affected How affected
Severity
(check all that apply) Risk
level
Underground services. Injuries • Obtain information from the relevant authorities on the location of underground services
Death • Daily inspection
• Proper supervision
2 2 4 4
2 2 4 4
(before controls)
Hazards
Risk factor
Likelihood
Who affected How affected
Severity
(check all that apply) Risk
level
2 3 6 6
(before controls)
Hazards
Risk factor
Likelihood
Who affected How affected
Severity
(check all that apply) Risk
level
Severity
4 8 12 16 20 High 4 - Potential for major incident, or major injury or illness causing short term disability. 4 - Very Likely
5 10 15 20 25 5 - Potential for major incident, or major injury or illness causing a fatality or long term disability. 5 - Certain
(before controls)
Hazards
Risk factor
Likelihood
Who affected How affected
Severity
(check all that apply) Risk
level