Nasby (2017) - High Performance HMIs For More Effective Operations
Nasby (2017) - High Performance HMIs For More Effective Operations
Nasby (2017) - High Performance HMIs For More Effective Operations
• Contact: graham.nasby@guelph.ca
• Also special thanks to Bill Hollifield, author of the High Performance HMI Handbook, for kindly letting me
use a few of his examples.
• Note: This PowerPoint slide deck is abbreviated version of the slides that were presented on Sept 14,
2017. The original presentation contained some propriety images which were on loan under a “present
only” arrangement with the original authors. Thank you for your understanding.
ENTRY ENTRY
Using ISA-101 & High Performance HMIs – summary slides Source: ANSI/ISA-101.01-2015, Human Machine Interfaces for Process Automation Systems
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 3
Outline
Look at industries where the cost of human error is so high that they
have spent the time and energy to develop more effective HMIs
Cited: Poor HMI was significant contributing factor to the fatal accident
Operators could not tell from the HMI that they were continuing to feed fuel into the fire!
Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
12
Situation Awareness in Aviation
Speed Time Enroute Fuel Remaining Positions of Engine Comm & Nav
Altitude Time to next Proximity to nearby aircraft diagnostics Frequencies
Position Waypoint Ground Real-time Data on Available Instrument
Course Time to Proximity to weather & Services at Approaches
Nearby Destination Rising Terrain lightning Airports Glide Radius
Airports
Time to Complete
Abnormal Situation Tasks 18.1 min 10.6 min 41% reduction
Friendly
SCADA Guy
Credit: http://play.google.com/store/apps/details?id=com.givewaygames.colorblind_ads
Credit: http://wearecolorblind.com/wp-content/uploads/general-example-2-types2.jpg
Credit: http://www.personal.psu.edu/afr3/blogs/siowfa12/color_blind_12.jpg
Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
20
A word about Colour Schemes
In this example,
colour is only used
to show alarms
HAPPY PLANT =
no alarms, no colour
Test Results
HCT 31.7%
2 Alarm Indicator
170
38.7 Desirable
93.1 95 120 12 9 Operating
185
8 170 Range
42.7 80
Alarm Range
Interlock
Show Values Show Trends Indicator
4 3 2 1 S
480.1 psi 480.1 psi 480.1 psi 480.1 psi 480.1 psi
Best!
Diagnostic Priority 3 Priority 2 Priority 1 Suppressed
Priority Alarm
HI
0.75 mg/L
Best Practice:
Embed Trends on HMIs
• Would these 80
60
RAS feed rate
graphs 40
help start up 20
65.1
0
your plant? 20
Aeration
15 Level
10
5
21.1
0
8
Residual
6 Chlorine
4
2
6.9
0
+30 +60 +90
Adapted from image courtesy of PAS (www.pas.com)
Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 29
Keep it simple
Crude To Scrubber
Feed
TK-21
Better Vessel
and Line Not a navigation target
Depiction
SCRUBBER
RUNNING
Running A A
Pumps not monitored by SCADA (no status information) are just shown as mid-gray:
Run Plan:
Reactor 2 Actual:
Hydrog B
2 Bed Bed
Comp A Comp B Cool CPC CRM LVL Prod: CRM-114 Cycle
B1 B2
State: Mid-Run Comp B 12 HR
Agit: ON 0.5
Locks: CLEAR Suct Dsch
Balance Feed System Aux Systems
IN OUT 500
Feed A Feed B Feed C SynG CWT CWP S10 S200
68.0
F
Rate L
VIB: OK O
BRG: OK W
60.0
2 HR OIL: OK 470 Atv 1 Atv 2 Pres %IP PWR VentP VentT MGA
Locks: CLEAR 2 HR
Alarms: P1 P2 P3 P4 Toggle
ACK 0 1 2 4 Main Reactor Reactor Hydrog Hydrog
List /Summary
UNACK 0 0 1 1 Menu 1 2 A B
2 071608 08:55:07 RX2 LOW CRM –QUALITY EXC
Clr T-In T-Out Visc C57D Null-A Jup2 Grok
92.0 MPH
PRODUCT
52.3 %
10.0 Hours
-90 -60 -30 2 Pumps Pump 1 Diagnostics Pump 2
Additive 2 Needed 1 RUNNING 1-OK 2-BAD STOPPED
P 4.0 MPH 4
S 4.0
O 44.3 %
AUTO To Coils M5 Temp Temperature °C
P 45.0 °C 48.0
Additive 2 MPH S 45.0
6.0
O 54.3 %
AUTO
time! West Comp Discharge Temp °C West Comp Flow MSCFH West Comp Speed %
50.0 55.0 95.0
Run Plan:
Reactor 2 Actual:
Hydrog B
2 Bed Bed
Comp A Comp B Cool CPC CRM LVL Prod: CRM-114 Cycle
B1 B2
State: Mid-Run Comp B 12 HR
Agit: ON 0.5
Locks: CLEAR Suct Dsch
Balance Feed System Aux Systems
IN OUT 500
Feed A Feed B Feed C SynG CWT CWP S10 S200
68.0
F
Rate L
VIB: OK O
BRG: OK W
60.0
2 HR OIL: OK 470 Atv 1 Atv 2 Pres %IP PWR VentP VentT MGA
Locks: CLEAR 2 HR
Alarms: P1 P2 P3 P4 Toggle
ACK 0 1 2 4 Main Reactor Reactor Hydrog Hydrog
List /Summary
UNACK 0 0 1 1 Menu 1 2 A B
2 071608 08:55:07 RX2 LOW CRM –QUALITY EXC
Clr T-In T-Out Visc C57D Null-A Jup2 Grok
Show:
• Topology, not Geography
• Important Status Conditions and Alarms
• Significant highway, railway and river crossing
• Residential areas near pipelines
• Important boundaries (i.e. state lines)
• Moving Analog Indicators indicating performance.
• Direction and content indicators
• Key process values
• Important trends
• Other ideas???
N28
Farnam 6
Adams 3
Marcum
C16
CSX9
Tempe
ENTRY ENTRY
ENTRY ENTRY