Nasby (2017) - High Performance HMIs For More Effective Operations

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 48

Using ISA-101 &

High Performance HMIs for


More Effective Operations
(Slide Deck for Distribution)

Speaker: Graham Nasby


Standards Voting member of ISA-101 Committee
Certification
Education & Training
Publishing
Conferences & Exhibits WEAO Intelligent Wastewater Systems Seminar
Using ISA-101 & High Performance HMIs – summary slides
Sept 14, 2017 – Canada Centre for Inland Waters – Burlington, Ontario
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
About the Speaker
Graham Nasby, P.Eng., PMP, CAP

• Water SCADA & Security Specialist


• City of Guelph Water Services

• 10 years in the consulting sector, followed by 2 years at the city

• WEAO and OWWA Member, Member of OWWA Automation Committee


• Co-chair of ISA112 SCADA Systems standards committee
• Voting member of ISA101 HMI Design standards committee
• Voting member of ISA18 Alarm Management standards committee
• Named Canadian Expert on IEC/SCC-TC65 with Standards Council of Canada

• Has published over 30 papers and articles on automation topics


• Received University of Guelph “Mid Career Achievement Award” in 2014
• Named ISA’s technical division leader of the year award in 2013.

• Contact: graham.nasby@guelph.ca

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 2
First a Few Acknowledgements
• Thanks to my fellow members of the ISA-101 committee for contributing several of the graphics in this
presentation

• Also special thanks to Bill Hollifield, author of the High Performance HMI Handbook, for kindly letting me
use a few of his examples.

• Note: This PowerPoint slide deck is abbreviated version of the slides that were presented on Sept 14,
2017. The original presentation contained some propriety images which were on loan under a “present
only” arrangement with the original authors. Thank you for your understanding.

CONTINUOUS WORK PROCESSES


MOC Audit Validation

ENTRY ENTRY

New System New Display


Major Changes Display Changes
SYSTEM DESIGN IMPLEMENT OPERATE Continuous
STANDARDS Improvement
Console Design Build Displays In Service
Philosophy
HMI System Build Console Maintain
Style Guide Design
Test Decommission

Toolkits User, Task,


Functional Train
Requirements
Commission
Continuous Display Design
Verification
Improvement

Using ISA-101 & High Performance HMIs – summary slides Source: ANSI/ISA-101.01-2015, Human Machine Interfaces for Process Automation Systems
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 3
Outline

• Why Do We Care About the HMI?


• Operator Effectiveness for Normal Operations and
Abnormal Situation Management
• The History of HMIs in Industry
• Examples Common Problems with HMI Screens
• Justifying the development of High Performance HMIs
• High Performance Graphic Principles and Elements
• High Performance HMI Display Hierarchy & Navigation
• How to apply ISA-101 and High Performance HMIs
• Summary and Questions

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 4
Operator Effectiveness:
Operations Effectiveness:
• Effective controls, systems, tools, and training to enable operators
to effectively detect and successfully handle BOTH normal
operations AND abnormal situations.
• The Three Components
• Effective Alarm Management
• Control System Performance
• High Performance HMI Alarm
• Effective Operations Requires System
all three aspects
• Effective Abnormal Situation
Management also requires all three
• The Alarm System is an essential Circle
but small part of the overall HMI! Represents
• Operator vigilance involves the HMI
ENTIRE HMI – not just the alarm system! Experience
Overall
Operator
Using ISA-101 & High Performance HMIs – summary slides HMI
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
5
HMIs Past and Present
• Remember the “old days”?
• Provided the “Big Picture”
• Limited Capability
• Many Process Trends
• Status “at-a-glance”
• (but took years to learn)

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
6
SCADA Graphics Introduced…but no guidelines!

Poor Graphics Encourage Poor Operating Practices


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
7
Common, Ineffective HMI Depictions
• Common, but
ineffective process
depictions!
• Numbers sprinkled
on a screen
• Inconsistent,
improper use of color

• No trends, no condition information


• Are these processes running well?
Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
8
But the graphics got better over time…
• “Improved” Graphic Capability doesn’t seem to make it any better
• At a glance, what can you tell from this screen?

• What is • Is the process running well? • Is anything


running? abnormal?
Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 • What if your are colour blind? 9
One of my favourites…
• So glad this is not from our industry!

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
10
How do we make better HMIs?
We need to look at what other industries are doing!

Look at industries where the cost of human error is so high that they
have spent the time and energy to develop more effective HMIs

• Oil Refining Industry


• Offshore Platforms
• Power Plants
• Chemical Industry
• Railways
• Aviation
• Mining
• Pulp and Paper

• In 2003 a group of end-users from the process industries got together


and started working on the ISA-101 HMI Design Standard…. they
published it in 2015! ….. It took them 12 years ….

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
11
2015 Texas City Oil Refinery Disaster from www.csb.gov
• Just a P&ID - no overview, trends, condition information, or material balance
• Inconsistent colors and alarms. 15 killed, 180 injured, $1.5 billion damage

Cited: Poor HMI was significant contributing factor to the fatal accident

Operators could not tell from the HMI that they were continuing to feed fuel into the fire!
Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
12
Situation Awareness in Aviation

Speed Time Enroute Fuel Remaining Positions of Engine Comm & Nav
Altitude Time to next Proximity to nearby aircraft diagnostics Frequencies
Position Waypoint Ground Real-time Data on Available Instrument
Course Time to Proximity to weather & Services at Approaches
Nearby Destination Rising Terrain lightning Airports Glide Radius
Airports

Using ISA-101 & High Performance HMIs – summary slides


Example is the Garman GTN-650 small
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 aircraft display system
13
If we designed heads up displays like old HMIs

Does the fighter jet pilot stand a chance?


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
14
The High Performance HMI

Poor HMIs are cited as contributing factors


to major accidents!
Task With “Traditional” With High Improvement
HMI Performance HMI
concepts
Detecting Abnormal
Situations Before Alarms 10% of the time 48% of the time A 5X increase
Occur
Success Rate in Handling
37% over base
Abnormal Situation 70% 96%
case

Time to Complete
Abnormal Situation Tasks 18.1 min 10.6 min 41% reduction

Study by Nova Chemicals and ASM® Consortium


Nova estimated $800,000 per year savings on 1 ethylene plant
PAS-EPRI Study: Similar Results on a Coal-fired power plant
Using ISA-101 & High Performance HMIs – summary slides Figures and Graphic courtesy of PAS
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 (www.pas.com) 15
High Performance HMI Concepts

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
16
Proper Use of Color
• Color is an attention-getter
• Using Red or Green to indicate
normal “running” or “not running”
makes problems hard to see

• Use color for the abnormal, not the


normal
• Can you quickly tell where the
problems are on these screens?

If you overuse red or green, it no longer stands out

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
17
Remember these books?

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
18
How long did it take to find Waldo?

Friendly
SCADA Guy

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
19
Common Color Blindness or Deficiency
• Very common, different types
• Color change is not detected well in peripheral vision.
• Color alone should not used to differentiate an important status!

Credit: http://play.google.com/store/apps/details?id=com.givewaygames.colorblind_ads
Credit: http://wearecolorblind.com/wp-content/uploads/general-example-2-types2.jpg
Credit: http://www.personal.psu.edu/afr3/blogs/siowfa12/color_blind_12.jpg
Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
20
A word about Colour Schemes

Better Colour Scheme

Poor Colour Scheme

Using ISA-101 & High Performance HMIs – summary slides


What parts of the
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 screens catch your eye? 21
You can show a lot of grayscale

In this example,
colour is only used
to show alarms

HAPPY PLANT =
no alarms, no colour

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
22
Data is Not Information: Is Spot Sick?

Blood Tests for Spot

Test Results

HCT 31.7%

HGB 10.2 g/dl

MCHC 32.2 6/dl

WBC 9.2 x109 /L

GRANS 6.5 x109 /L


Unless you are vet,
L/M 2.7 x109 /L how can you know?

PLT 310 x109 /L

Example adapted from High Performance Handbook Nice Teeth, eh?


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
23
How About Now?
You can tell at a glance

Blood Tests for Spot


Test Results Range Indicator
Low - Normal - High
HCT 31.7% 24.0 – 45.0

HGB 10.2 g/dl 8.0 – 15.0

MCHC 32.2 6/dl 30.0 - 36.9

WBC 9.2 x109 /L 5.0 – 18.9

GRANS 6.5 x109 /L 2.5 – 12.5

L/M 2.7 x109 /L 1.5 – 7.8

PLT 310 x109 /L 175 - 500

Example adapted from High Performance Handbook

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 24
Analog in Industrial Examples

RECYCLE COMPRESSOR K43


Cool Suct Inter Dsch Suct Inter Dsch E. Vib N. Vib W. Vib Motor Oil Oil
gpm psig psig psig degF degF degF mil mil mil Amps psig degF

2 Alarm Indicator

290 Alarm Range

170

38.7 Desirable
93.1 95 120 12 9 Operating
185
8 170 Range

42.7 80

Alarm Range

Interlock
Show Values Show Trends Indicator

Buttons for additional functionality Image from High Performance Handbook

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
25
Alarm Indications on Graphics

Often 480.1 psi No Alarm Indication 480.1 psi Only a Colour


Seen Change!

480.1 psi 480.1 psi 480.1 psi 480.1 psi


Better Diagnostic Priority 3 Priority 2 Priority 1
Priority

480.1 psi 480.1 psi 480.1 psi 480.1 psi


Betterer Diagnostic Priority 3 Priority 2 Priority 1
Priority

4 3 2 1 S
480.1 psi 480.1 psi 480.1 psi 480.1 psi 480.1 psi
Best!
Diagnostic Priority 3 Priority 2 Priority 1 Suppressed
Priority Alarm

Show alarms in multiple ways: Colour, Shape, Text (“redundant coding”)


Using ISA-101 & High Performance HMIs – summary slides
Adapted from High Performance Handbook
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 26
Embed information into the HMI!

HI
0.75 mg/L

AIT01-HI Chlorine Treatment High Residual Alarm


Alarm: HIGH Setting: 120 deg C Priority: 3
Class: OPERATIONAL Response Time: <15 min
Alarm Consequences: Alarm Causes: Corrective Actions:
High Hypo Usage Hypo Pump Problem Check dosing rate
High Dechlor Usage Pump in Manual Adjust dosing rate. See. SOP
26
Problem with Feed Valve Visit site and inspect pump
Bad load of Hypo Go to site and do manual
hand sample
Problem with Analyzer
Alarm Information Record from the SCADA System’s Master Alarm Database
Using ISA-101 & High Performance HMIs – summary slides – see the ISA18 alarm management standard
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 27
The Importance Of Trends

Embedded “always visible”


Very Different Situations only detectable via trends
trends on process displays
are always better.

Don’t’ rely on “trending on


demand”, “trend pop-ups”
or “trend screens” –
in practice they don’t’ work
very well.

Best Practice:
Embed Trends on HMIs

Image from High Performance Handbook


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 28
More concepts with Trending
Plant 1 startup

• Would these 80
60
RAS feed rate

graphs 40

help start up 20
65.1
0
your plant? 20
Aeration
15 Level
10
5
21.1
0
8
Residual
6 Chlorine
4
2
6.9
0
+30 +60 +90
Adapted from image courtesy of PAS (www.pas.com)
Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 29
Keep it simple

Crude To Scrubber
Feed
TK-21

Poor Vessel To Product


and Line Tank
Depiction !

Better Vessel
and Line Not a navigation target
Depiction

SCRUBBER

OPEN CRUDE Navigation target


FEED
TK-21
PROD TANK

Image from High Performance Handbook


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 30
Level Depiction

Image from High Performance Handbook


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 31
Status Depiction
Red/Green for
status
vs.
Greyscale & STOPPED
redundant
Not
Running
L L
coding

RUNNING
Running A A

Pumps not monitored by SCADA (no status information) are just shown as mid-gray:

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 32
Don’t do this

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 33
Or this…

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 34
Or this..

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 35
Proper Hierarchy for Displays

• HIERARCHY for Displays:


• Level 1 – Plant or Entire System Overview
• Entire Operator Span of Control. “Single-Glance”
• Level 2 – Sub-Process Overview
• More details than a Level 1 display, smaller area
• Level 3 – Equipment or Details Screen
• Specific details about part of the process or control
• Level 4 – Specific Task or Diagnostic Screen
• Very detailed screen, only used for diagnostics

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
36
Level 1 Overview
Run Plan:
Reactor 1 Actual: Hydrog A Key Performance Indicators
Comp A Comp B Cool CPC CRM LVL Prod: Thionite Cycle Bed Bed Conversion Efficiency
State: Mid-Run Comp A
A1 A2
Agit: ON 80
Locks: CLEAR
Suct Dsch %
Balance
IN OUT
500
80.0
F
Rate L
70 12 HR
VIB: OK O
W Emissions Limit Ratio
72.0 BRG: OK
2 HR OIL: OK 470 1.0
Locks: CLEAR 2 HR

Run Plan:
Reactor 2 Actual:
Hydrog B
2 Bed Bed
Comp A Comp B Cool CPC CRM LVL Prod: CRM-114 Cycle
B1 B2
State: Mid-Run Comp B 12 HR
Agit: ON 0.5
Locks: CLEAR Suct Dsch
Balance Feed System Aux Systems
IN OUT 500
Feed A Feed B Feed C SynG CWT CWP S10 S200
68.0
F
Rate L
VIB: OK O
BRG: OK W
60.0
2 HR OIL: OK 470 Atv 1 Atv 2 Pres %IP PWR VentP VentT MGA
Locks: CLEAR 2 HR

Alarms: P1 P2 P3 P4 Toggle
ACK 0 1 2 4 Main Reactor Reactor Hydrog Hydrog
List /Summary
UNACK 0 0 1 1 Menu 1 2 A B
2 071608 08:55:07 RX2 LOW CRM –QUALITY EXC
Clr T-In T-Out Visc C57D Null-A Jup2 Grok

Trend Feed Aux Menus


Control Sys Sys L2 L3 L4

Image from High Performance Handbook


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
37
Level 2: Control of a Process Sub-Part
Feed Components: A - B - C VENT SYS Product: Thionite State: Mid-Run
Agitator
ON Material Balance
Main Feed
P 76.8 MPH
Reactor M5 M5 Pressure
P 98.0 psig
S 76.0 S 95.0 SHUT Reset
Analysis: Purity %
O 88.5 % 40.0 O 44.3 % DOWN
AUTO AUTO M5 IN OUT
Main Feed MPH +10%
80.0
+/- 5 psi, 2hr
FREEZE
32.0
-90 -60 -30 2 Hours +/- 1 %, 2hr M5

Analysis: Inhibitor Concentration %


6.0 -10%
72.0
-90 -60 -30 2 Hours
M5 Level % 19707 19301
Additive 1 P 71.0 % ISOLATE
S 70.0 Calc Diff: 2.1 %
P 11.9 MPH O 54.3 %
M5 Hours: 238.1
S 12.0
O 22.3 % AUTO Since: 06/02/07
AUTO 14:00:00
4.0
-90 -60 -30 2 Hours
Additive 1 MPH 5.0 % Run Plan:
14.0
Actual:

92.0 MPH
PRODUCT
52.3 %
10.0 Hours
-90 -60 -30 2 Pumps Pump 1 Diagnostics Pump 2
Additive 2 Needed 1 RUNNING 1-OK 2-BAD STOPPED
P 4.0 MPH 4
S 4.0
O 44.3 %
AUTO To Coils M5 Temp Temperature °C
P 45.0 °C 48.0
Additive 2 MPH S 45.0
6.0
O 54.3 %
AUTO

Coolant Purge Cat.


Flow Rate Activity
40.0
Coolant Conversion Reserve COOLING SYS -90 -60 -30 2 Hours
2.0 Temp Efficiency Capacity
-90 -60 -30 2 Hours

Level 1 M5 M5 - Level 3 - - Level 3 -


Main Trend Feed Product
Reaction M4 M6 Startup Sequence M5 M5 Cooling
Menu Control System Recovery
Overview Overlay Overlay Interlocks System

Using ISA-101 & High Performance HMIs – summary slides


Image from High Performance Handbook
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
38
Level 3
Most of OH
20.1 psi
EAST COMP West Compressor

what you WEST WC Speed


P 90.8 %
IDLE PURGE
SHUT
COMP S 90.0 DOWN
already RUNNING
O
CAS
90.0 %
90.8
90.0 32.0
111.0
WEST
COMP
WEST
COMP
WEST
COMP
48.0 65.0
have is 111.0 °C

probably 48.0 psi


West Compressor Interlock W-1
Initiator Value Action Status
65.0 °C Speed 1 Stg 2 Stg CLR CLR Winding
Level 3 1st
Stage 20.0 °C
psi psi In Out Temp Overspeed
Or Winding Temp High
OK
OK
Shut Down
West Comp
AND
CW SHOW / HIDE NORMALIZE Or Vibration High OK Close Inlet &
VALUES SCALE
28.0 °C Or 1 Stg High Pres Outlet Block
44.0 °C 2nd OK
Valves
Stage 32.0 °C Flow Demand SPEED Or 2 Stg High Press OK AND
We are EAST COMP
P 76.8 MSCFH
S 76.0
O 88.5 %
CASCADE
IN EFFECT
Or Suction Pres Low OK Override East
AUTO Comp Speed
out of 90.0 psi 48.4 MSCFH
RECOVERY
Or Oil Pres Low OK
to 100%

time! West Comp Discharge Temp °C West Comp Flow MSCFH West Comp Speed %
50.0 55.0 95.0

40.0 45.0 85.0


-90 -60 -30 2 Hours -90 -60 -30 2 Hours -90 -60 -30 2 Hours

West West Comp


Main Compression East Trend OH Product - Level 4 -
Startup Sequence Cooling
Menu Level 2 Comp Control System Recovery Procedures
Overlay Overlay System

Image from High Performance Handbook


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 39
Back to Level 1 –
How many values/indicators are on this screen?
Run Plan:
Reactor 1 Actual: Hydrog A Key Performance Indicators
Comp A Comp B Cool CPC CRM LVL Prod: Thionite Cycle Bed Bed Conversion Efficiency
State: Mid-Run Comp A
A1 A2
Agit: ON 80
Locks: CLEAR
Suct Dsch %
Balance
IN OUT
500
80.0
F
Rate L
70 12 HR
VIB: OK O
W Emissions Limit Ratio
72.0 BRG: OK
2 HR OIL: OK 470 1.0
Locks: CLEAR 2 HR

Run Plan:
Reactor 2 Actual:
Hydrog B
2 Bed Bed
Comp A Comp B Cool CPC CRM LVL Prod: CRM-114 Cycle
B1 B2
State: Mid-Run Comp B 12 HR
Agit: ON 0.5
Locks: CLEAR Suct Dsch
Balance Feed System Aux Systems
IN OUT 500
Feed A Feed B Feed C SynG CWT CWP S10 S200
68.0
F
Rate L
VIB: OK O
BRG: OK W
60.0
2 HR OIL: OK 470 Atv 1 Atv 2 Pres %IP PWR VentP VentT MGA
Locks: CLEAR 2 HR

Alarms: P1 P2 P3 P4 Toggle
ACK 0 1 2 4 Main Reactor Reactor Hydrog Hydrog
List /Summary
UNACK 0 0 1 1 Menu 1 2 A B
2 071608 08:55:07 RX2 LOW CRM –QUALITY EXC
Clr T-In T-Out Visc C57D Null-A Jup2 Grok

Trend Feed Aux Menus


Control Sys Sys L2 L3 L4

Image from High Performance Handbook


Using ISA-101 & High Performance HMIs – summary slides
WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
40
How to show a piping system

Show:
• Topology, not Geography
• Important Status Conditions and Alarms
• Significant highway, railway and river crossing
• Residential areas near pipelines
• Important boundaries (i.e. state lines)
• Moving Analog Indicators indicating performance.
• Direction and content indicators
• Key process values
• Important trends
• Other ideas???

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
41
Pipeline Overview Screen

You could show it this way….


R77

N28

Farnam 6

Adams 3

Marcum

C16

CSX9

Tempe

Source: PAS Internal Adaptation

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
42
This is probably a lot easier to use

Image courtesy of PAS (www.pas.com)

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
43
High Performance HMIs

How do we design and manage our HMI in order to


use these concepts?
Introducing the ISA-101 HMI Design Standard

CONTINUOUS WORK PROCESSES


MOC Audit Validation

ENTRY ENTRY

New System New Display


Major Changes Display Changes
SYSTEM DESIGN IMPLEMENT OPERATE Continuous
STANDARDS Improvement
Console Design Build Displays In Service
Philosophy
HMI System Build Console Maintain
Style Guide Design
Test Decommission

Toolkits User, Task,


Functional Train
Requirements
Commission
Continuous Display Design
Verification
Improvement

HMI Lifecycle from ANSI/ISA-101-2015

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
44
ISA-101 – in a nutshell
Actual ISA-101 standard is only 64 pages

Overall design guidance provided in the actual standard, details


are in ISA-101 Technical Reports (soon to be available from ISA)

Has a very robust workflow for developing and managing HMI


systems, including a strong Change Management Process

Focus is on creating screens for situational awareness and


operator tasks. Users must be trained on use to use HMIs.

Facility owners must develop a clear HMI philosophy document


and HMI style guide for their HMI system, and couple this
reusable software toolkits of screen elements. Without these it
is impossible to develop an effective HMI.

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017 45
Take another look at the workflow

The ISA-101 standard is important because it is the


first international standard to state minimum
requirements for HMI displays, including their design,
documentation, and management of change.
CONTINUOUS WORK PROCESSES
MOC Audit Validation

ENTRY ENTRY

New System New Display


Major Changes Display Changes
SYSTEM DESIGN IMPLEMENT OPERATE Continuous
STANDARDS Improvement
Console Design Build Displays In Service
Philosophy
HMI System Build Console Maintain
Style Guide Design
Test Decommission

Toolkits User, Task,


Functional Train
Requirements
Commission
Continuous Display Design
Verification
Improvement

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
46
How to get started?

Understand and document what you have


Add some Level 1 and Level 2 displays to give your operators visibility
of your entire process for situational awareness
Add some task screens to help with start-up, shutdown or
maintenance tasks that are difficult for operators to run
Start developing your HMI Philosophy document and Style Guide to
define what you want your system
Start using Revision Control to track changes to your SCADA system’s
programming. Implement a Management of Change procedure, so
changes are controlled and documented.
Do a pilot project of a few new HMI screens to see how they work.
Talk to your operations team.

Using ISA-101 & High Performance HMIs – summary slides


WEAO Intelligent Wastewater Systems Seminar – Sept 14, 2017
47
Any Questions?