Method of Statement For Excavation and Backfilling DS-034

You might also like

Download as pdf
Download as pdf
You are on page 1of 6
DAR AC ARICAN oe TNS Document Transmittal | & sis! ereet contractor: REET INTERNATIONAL CONTRACTING ranstal "a0 SAR-CREDS-OR ‘ate 72020 METHOD OF STATEMENT EXCAVATION x, [ransmsson of Drawings. Document, Samples te [betivery [submited for [T0: AECOM [The Engineer) Ele. — 5] Ivana Information 2 JForcontacor: Ah [ter (econ [coornation 3 [roaencancen use one fey Se Oech action [cove Rec'd tomconracer: 12020. Sane COC Ed Maeroven a utc: (2020 chet: lavenovenasnoreo |e _| nfrom dient: Jf 2020 oO ‘Out to Enars: \ResueaarT c Outtocenacor: —/ 2000 Infrom Eng: IeecreD 2 FoR nFoRMaTion E wack Fi | Remarks : B ene 4+ ph fne C lorem [J smote [7] tanutacrs ot [cores ] conranent CO Ware & Signature (required) pe eee Ee Eee = - liar Smtrs 7] — Pap Wap Rame Sere ae Ce HDL shee tne information given inthe Contract documents, JAoprovlcorestion or comments made relative to submittals during his review donot relieve the Contractor from compliance with the requvements of the drawings or spectiatons. This checks ony for review of general performance withthe design concept ofthe project ond general compliance with he Contractors responsible for conming and correlating all quantities and dimensions, electing fabrication processes and techniques of construction, coordinating his work wth that of ther trades, nd performing his workin safe, tnely, and satisfactory manner Distrito Representatives Signature cuasive Contractor Received For Ref: s-cv-001 | prosect METHOD STATEMENT | SHAMS AR RIYADH CONTRACTOR Creet international Contracting Company Excavation and Backfilling Creet international Contracting Company Project: Shams Arriyadh Development Method statement for Installation of Sanitary Drainage Network Refs MS-ME-OO1 Page: 1 of 4 Method Statement Excavation and Backfilling 1.0 Scope This method of statement defines the procedures followed for excavation and backfilling in order to achieve the project objective with safe work practices. 2.0 Purpose ‘The main purpose of this document is to ensure that the personnel carrying out the activities for the above mentioned scope, Carry out the work in a controlled and structured manner Understand the risk and hazards associated with each activities n the sequence of work Use the controls specified to reduce the risk of Injury, Ill health or damage Carry out the work safely. 3.0 References The Primary reference documents that should be used in conjunction with this document are, 1. Particular Specifications Project Drawings lll. Project Contract Documents IV. Materials / Submittals with respect to the scope that shall be available during the project duration V. Ministry of Communications ~ General Specifications for Road and Bridges Construction VL. Ministry for Water and Electricity ~ Technical Specifications for Sewer Networks 4.0 Definitions 4.1 Risk: a situation involving exposure to danger. 4.2 Hazard: a potential source of danger 4.3 A1A, A1B, A24: AASHTO Soil Classification System Granular Materials (35% or less passing, the 0.075 mm sieve) Creet International Contracting Company Project: Shams Arriyadh Development ‘Method statement for installation of Sanitary Drainage Network Ref: MS-ME-O01 ae an Wee bbe nel ; Page! 24 so yarns ia ete? be if a\vemy ined) 1 Common Hazards: —The below tist Consists of the list of common hazards that should be addressed on a regular basis with regular safety supervision, based on the below, specific risks have been identified that shall be mitigated by control measures, | + amage to ured Sens | ‘* Fall Hazards — People / Equipment falling \ + amageto extn structures \ «conned Spces Manual Handling '* Collapse of Excavation \ + standSandstrm + Uti exupment ure < sip tipand rat + crowing or Feodng © 52 Significant Hazar Hazard Persons Likelihood Severity ——=Risk atRisk Low, Med, High Low, Med, High Low, Med, High Striking Underground Electricity Cables site Med High High Personnel Collapse of unsupported excavations site High High High Personnel Falling into unfenced excavations it Med High High Personnel Materials or equipment falling into the site Med High High excavation Personnel Breaking into gas or water Site Med High High main/existing sewer Personnel Operative being struck by the excavator site Med High High Personnel 5.3 Control Measures 5.3.1 Accurate location of underground services by operatives trained in the use of locating equipment, 5.3.2 _ Planned provision of and use of excavation support equipment, trench support is. to extend to 250mm from the bottom of the dig. 5.3.3 If ground conditions are that of solid state works may progress but any changes 4g. Water ingress, loose ground the works must stop and be re assessed, 5.34 535 5.3.6 537 5.3.8 CCreet international Contracting Company Project: Shams Arriyadh Development ‘Method statement for installation of Sanitary Drainage Network Ref: MS-ME-O01 Page: 3 0f 4 Excavations to be always backfilled as soon as practicable, if not warning signage, inspections & adequate fencing used. Soil and pipes, not to be placed at the edge of the excavation so as to surcharge tt Proper tied ladder access extending 1.05m above top of excavation, and placed into the supported area of the excavation. Only certified operators & lifting equipment to be used....SWL Is not to be exceeded for the Excavator being used. Excavator is banked during excavation work, and stops used on dumpers to prevent vehicles over running the excavation. 5.4 General Measures 541 542 543 54 All appropriate safety personal protective equipment shall be worn by workmen such as helmet, coverall clothing, safety shoes, goggles & gloves. If welding work is required, additional safety equipment’s shall be worn by all welders, such as welding mask & goggles, apron & welding gloves. |f work is in high level, only approved scaffolding & safety belts can be used. During execution of hot works, a fire blanket & extinguisher shall be positioned at all times, 6.0 Working Method 6.1 Materials List: Backfill material ALA, A18,A24 6.2 Equipment / Tools Excavator Manual Excavation Tools, Shovel Pay Loader Compactor Total Station Meter tape 6.3 Preparation for Excavation (site Preparation) Existing Services ~Construction team would conduct an investigation and acquire information about site services might have been placed/embedded below the ground. Services, wherever found shall be rerouted and protected to place will not affect site activities. Setting out - Creet Surveyor would conduct the site survey to mark/stake-out the lines and levels of the objective excavation for foundations as per indicated in the approved drawing. As Px Spas. Creet International Contracting Company Project: Shams Arriyadh Development Method statement for Installation of Sanitary Drainage Network Ref: MS-ME01 Page: 4 of 4 6.4 Procedure for Excavation © The area to be excavated shall be properly marked and clear before starting the works. '* The depth of excavation shall be periodically checked by a surveyor to avold over excavation. '* Excavation slopes shall be constructed In accordance with the lines and grades shown on the plans and as staked by the Consultant. ‘© All excavated material shall be kept a minimum of 1.0 meter from the edge of ‘excavation or shall be stockpiled to the area designated by the Engineer. © For all excavation activities, adequate safety barriers, sign boards, advance warning signs would be used, ‘© For foundation, as soon as the excavation reaches the required depth/elevation the surface shall be leveled and shall . = the compaction starts, it shall make sure that the excavated level is free from standing water or excessive moisture content. «inspection would be conducted during compaction for checking and approval of the consutantg— TO follows PTP ¢ The compaction test report shall be submitted to the Consultant for approval prior to proceed succeeding werk —>* _Anti-termite treatment would be conducted prior to start blinding works, 6.5 Procedure for Backfiling +> * After completion of the compaction under blinding, tie beams and ground slab. Backfilling shall commence using similar excavated material. Care shall be taken to remove bolder, vegetation and any other deleterious materials, * But prior to backfilling, the compacted surface shall be accepted by the Consultant ¢— Fellow ITP. ‘The sub-grade once approved, the excavated materials or any material source approved ne Consultant shall be placed in layers not more thani3O0imim thick ‘In-situ dry density test (compaction test) shall be performed at the rate indicated Inthe specification. * Back filling followed with compaction shall continue till final level is achieved, 6.6 Testing: Compaction Test will be performed as per the ITP submitted to the consultant.

You might also like