Calculation Spring Value For Horizontal Piles According To Menard
Calculation Spring Value For Horizontal Piles According To Menard
Formula: 1/k=(1,3*R0*(2,65*R/R0)a+a*R)/(3*Em)
Grondsrt kh[kN/m3]
zand qc [MPa] p0<p<0,5*pmax 0,5*pmax<p<0,8*pmax 0,8*pmax<p<pmax
los 5 12000 27000 6000 13500 3000 6750
matig 10 20000 45000 10000 22500 5000 11250
vast 15 40000 90000 20000 45000 10000 22500
klei qc [kPa]
slap 25 2000 4500 800 1800 500 1125
matig 50 4000 9000 2000 4500 800 1800
vast 200 6000 13500 4000 9000 2000 4500
veen qc [kPa]
slap 10 1000 2250 500 1125 250 560
matig 30 2000 4500 800 1180 500 1125
Doc:
Paalfundering
Pagina 1 van 2 Bestand: 518090751.xls
Horizontale beddingskonstantes
Datum 30-7-98
table
peat 1.00 3.00
clay 0.67 2.00
silt 0.50 1.00
sand 0.33 0.70
gravel 0.25 0.50
Doc:
Paalfundering
Pagina 2 van 2 Bestand: 518090751.xls
Horizontale beddingskonstantes
Datum 30-7-98