Background of Project
Background of Project
Problem statement
Nowadays, design a gantt chart by using excel is a common thing but it's very
complicated because it required a high skill of excel. There is other option in order to create
a gantt chart by using software but most of them are overpriced and difficult to set up. As a
student, we find out it is hard to plan our project using gantt chart because it is very difficult
and expensive. Hence, we decide to produce a new concept of gantt chart by building up an
application to perform a gantt chart in the easiest method and the most important thing it is
free. Grantt chart was originally developed by Henry L. Gantt, an American mechanical
engineer, in 1917 and is alternatively called a Gantt chart.1It quickly became popular
especially in the construction industry because of its ability to graphically represent a
project’s activities in a clear, simple, and time-scaled manner. Before a bar chart can be
constructed for a project, the project must be broken into smaller, usually homogeneous
components, each of which is called an activity or a task. None of the methods is a uniquely
“correct” way to break down a project into activities, nor can we describe other ways as
incorrect. However, the scheduler should take a balanced approach and break the project
down into a reasonable number of activities that are easily measured and controlled without
being overly detailed. An activity, or a task, may be as large as laying the foundation of a
building, as small as erecting the formwork of one footing, or anywhere in between. The
duration of each activity must be estimated. Bars are then drawn to show each activity: the
duration and the starting and ending points. As mentioned previously, links between
activities are not usually shown. On a bar chart, the bar may not indicate continuous work
from the start of the activity until its end. For example, the activity Getting a Building Permit
may be represented by a 2-month-long bar. However, most of this time is a waiting period
.Likewise, a Concrete Foundation summary activity may include several days of waiting for
the concrete to cure. Non continuous (dashed) bars are sometimes used to distinguish
between real work (solid lines) and inactive periods (gaps between solid lines).Hence, Bar
charts have become a vehicle for representing many pieces of a project’s information. Many
variations of bar charts have evolved; some simply show the start and the end of each
activity, some are loaded with resource or budget numbers.
Objectives of Project
When you set up a Gantt chart, you need to think through all of the tasks involved in your
project. As part of this process, you'll work out who will be responsible for each task, how
long each task will take, and what problems your team may encounter.
This detailed thinking helps you ensure that the schedule is workable, that the right people
are assigned to each task, and that you have workarounds for potential problems before you
start.
They also help you work out practical aspects of a project, such as the minimum time it will
take to deliver, and which tasks need to be completed before others can start. Plus, you can
use them to identify the critical path – the sequence of tasks that must individually be
completed on time if the whole project is to deliver on time.
Finally, you can use them to keep your team and your sponsors informed of progress.
Simply update the chart to show schedule changes and their implications, or use it to
communicate that key tasks have been completed.
Significance of Project
2. Easy online project planning with fast drag and drop scheduling
Build your gantt chart by simply dragging and dropping tasks in your project. Our
online project planning tool makes it easy with no training required. Simply jump
in and begin adding tasks in the gantt chart application, and you’ll be up and
running in minutes.
6. Save time and monitor costs with time tracking & reporting
Track hours spent on projects and tasks with time tracking and project
management software that doesn’t disrupt your workflow.