JADWAL WAKTU PELAKSANAAN PEKERJAAN ( KURVA S - BAR CHART )

###
PT. PLN (PERSERO) UNIT INDUK PEMBANGUNAN VI

JANGKA WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH ) HARI KALENDER


BOBOT BULAN KE 1 BULAN KE 2 BULAN KE 3 BULAN KE 4 BULAN KE 5 BULAN KE 6 BULAN KE 7
NO. URAIAN PEKERJAAN KET
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180

100
1 PERSIAPAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

2 STRIPING DAN URUGAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 90

3 AKSES JALAN MASUK DENGAN TIMBUNAN BATU #REF! #REF! #REF! #REF! #REF! #REF! #REF!

80
4 PEMBUATAN TEMBOK PENAHAN TANAH #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

5 R. KANTOR & ADMINISTRASI, @ 217,00 m2 / unit #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

70
6 R. KELAS / TEORI, @ 307,40 m2 / unit #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

7 R. PERPUSTAKAAN, @ 169,60 m2 / unit #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
60

8 R. MUSHOLA, @ 143,96 m2 / unit #REF! #REF! #REF! #REF! #REF! #REF! #REF!

PHO
9 R. KM / WC & RG. GANTI, @ 74,85 m2 / unit #REF! #REF! #REF! #REF! #REF! #REF! #REF! 50

10 RUMAH DINAS KEPALA SEKOLAH, @ 76,37 m2 / unit #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

40
11 R. KESENIAN & KETERAMPILAN, @ 212,80 m2 / unit #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

12 R. GUDANG, @ 43,00 m2 / unit #REF! #REF! #REF! #REF! #REF!


30
II. PEKERJAAN PENUNJANG

1 PAPAN NAMA SEKOLAH #REF! #REF!


20

2 TIANG BENDERA + DUDUKAN 2X2 #REF! #REF!

3 SALURAN AIR BERSIH #REF! #REF! 10

4 R. POMPA & MENARA AIR, @ 8 m2 / unit #REF! #REF! #REF! #REF!

JUMLAH TOTAL #REF!

RENCANA PROGRESS PER MINGGU - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 100

KUMULATIF PROGRESS RENCANA - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 100

#REF!
Penawar, Keterangan :
PT. AZA BANAR masa pemeliharaan 120 hari kalender

Ir. ASEP CHANDRA S


Direktur Utama
HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN PEKERJAAN
( Rp. )

A PEKERJAAN PERSIAPAN
1 1 M2 LOS KERJA / DIREKSI KEET #REF!
2 1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK #REF!
3 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN #REF!

B PEKERJAAN TANAH
1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M' #REF!
2 1 M3 GALIAN TANAH BIASA SEDALAM 2 M' #REF!
3 1 M3 URUGAN TANAH KEMBALI #REF!
4 1 M3 PEMADATAN TANAH #REF!
5 1 M3 URUGAN PASIR URUG #REF!
6 1 M3 URUGAN TANAH URUG #REF!
7 1 M3 STRIPPING TANAH #REF!

C PEKERJAAN PONDASI
1 1 M3 PASANG BATU KOSONG / AANSTAMPING #REF!
2 1 M3 PASANGAN BATU KALI 1 : 3 #REF!

D PEKERJAAN STRUKTUR BETON


1 1 M3 MEMBUAT BETON MUTU f'c = 14,5 Mpa (K-175), SLUMP (12 +/- 2) cm, w/c = 0,66 #REF!
2 1 M3 RABAT BETON #REF!
3 1 KG MENGERJAKAN BESI BETON TULANGAN #REF!
4 1 M2 BEKISTING UNTUK PONDASI DAN SLOOF #REF!
5 1 M2 BEKISTING UNTUK KOLOM #REF!
6 1 M2 BEKISTING UNTUK BALOK #REF!
7 1 M2 BEKISTING UNTUK LANTAI #REF!
8 1 M3 SLOOF BETON 15/20, 4 Ø 10, Ø 6 - 15, K-175 #REF!
9 1 M3 SLOOF BETON 15/15, 4 Ø 10, Ø 6 - 15, K-175 (SELASAR) #REF!
10 1 M3 KOLOM STRUKTUR 20/25, 6 Ø 12, Ø 8 - 15, K-175 #REF!
11 1 M3 KOLOM SELASAR 20/20, 4 Ø 10, Ø 6 - 15, K-175 #REF!
12 1 M3 KOLOM PRAKTIS 15/15, 4 Ø 10, Ø 6 - 15, K-175 #REF!
13 1 M3 RINGBALK 15/20, 4 Ø 10, Ø 6 - 15, K-175 #REF!
14 1 M3 KONSOL DEPAN 15/20, 4 Ø 10, Ø 6 - 15, K-175 #REF!
15 1 M3 BALOK SOPI-SOPI 15/15, 4 Ø 10, Ø 6 - 15, K-175 #REF!
16 1 M3 KONSOL BELAKANG 15/20, 4 Ø 10, Ø 6 - 15, K-175 #REF!
17 1 M3 SLOOF BETON 15/15, 4 Ø 10, Ø 6 - 15, K-175 #REF!
18 1 M3 KOLOM 20/20, 4 Ø 10, Ø 6 - 15, K-175 #REF!

E PEKERJAAN PENUTUP ATAP


1 1 M3 KONSTRUKSI KUDA-KUDA, KAYU KELAS II #REF!
2 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II #REF!
3 1 M' PAPAN RUITER 3/20 #REF!
4 1 M3 SILANG ANGIN #REF!
5 1 M2 PASANG RANGKA ATAP GENTENG, KAYU KELAS II #REF!
6 1 M2 PASANG ATAP GENTENG PELENTONG #REF!
7 1 M' PASANG BUBUNG GENTENG PELENTONG #REF!
8 1 M' LISPLANK UKURAN 3/20, KAYU KELAS II #REF!
9 1 M' FLASHING SENG BJLS #REF!

F PEKERJAAN DINDING
1 1 M2 PASANGAN BATA MERAH 1/2 BATA, 1 PC : 3 PS #REF!
2 1 M2 PLESTERAN 1 PC : 3 PS #REF!

G PEKERJAAN KUSEN
1 1 M3 MEMASANG KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II #REF!
2 1 M2 MEMASANG DAUN PINTU PANEL, KAYU KELAS II #REF!
3 1 M2 MEMASANG PINTU DAN JENDELA KACA, KAYU KELAS II #REF!
4 1 M2 MEMASANG DAUN PINTU RANGKAP TRIPLEK LAPIS FORMIKA , KAYU KELAS II #REF!
5 1 BH PAS KUNCI PINTU #REF!
6 1 BH PAS. KUNCI PINTU KM/WC #REF!
7 1 BH PAS. ENGSEL PINTU #REF!
8 1 BH PAS. ENGSEL JENDELA #REF!
HARGA SATUAN
NO. URAIAN PEKERJAAN
( Rp. )
9 1 BH SLOT #REF!
10 1 BH KAIT ANGIN #REF!
11 1 M2 PAS. KACA POLOS 5 MM #REF!
12 1 M2 MEMASANG JALUSI KUSEN, KAYU KELAS II #REF!
HARGA SATUAN
NO. URAIAN PEKERJAAN
( Rp. )

H PEKERJAAN PLAFOND
1 1 M2 PASANG RANGKA LANGIT-LANGIT ( 60 x 60 ) cm, KAYU KELAS II #REF!
2 1 M2 PASANG LANGIT-LANGIT TRIPLEK UKURAN ( 120 X 240 ) cm, TEBAL 3 mm #REF!
3 1 M' LIST LANGIT-LANGIT KAYU PROFIL #REF!

I PEKERJAAN LANTAI DAN KERAMIK


1 1 M2 MEMASANG LANTAI KERAMIK Uk. 30 x 30 cm, POLOS #REF!
2 1 M2 MEMASANG LANTAI KERAMIK KM/WC Uk. 20 x 20 cm, POLOS #REF!
3 1 M2 MEMASANG DINDING KERAMIK Uk. 20 x 20 cm, POLOS #REF!

J PEKERJAAN PENGECATAN
1 1 M2 PENGECATAN DINDING #REF!
2 1 M2 PENGECATAN PLAFOND #REF!
3 1 M2 PENGECATAN BIDANG KAYU BARU #REF!
4 1 M2 PELEBURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER #REF!

K ELEKTRIKAL
1 1 TTK PAS. INSTALASI PENERANGAN #REF!
2 1 TTK INSTALASI TITIK STOP KONTAK #REF!
3 1 M' KABEL NYM 3 X 2,5 #REF!
4 1 BH PAS. LAMPU PIJAR 11 W #REF!
5 1 BH SAKLAR GANDA #REF!
6 1 BH SAKLAR TUNGGAL #REF!
7 1 BH STOP KONTAK #REF!

L MEKANIKAL
1 1 BH KLOSET JONGKOK #REF!
2 1 BH BAK AIR #REF!
3 1 BH FLOOR DRAIN #REF!
4 1 BH KRAN AIR #REF!
5 1 BH WASTAFEL #REF!
6 1 M' PAS. PIPA PVC DIA. 1/2' #REF!
7 1 M' PAS. PIPA PVC DIA. 3/4' #REF!
8 1 M' PAS. PIPA PVC DIA. 1 1/4' #REF!
9 1 M' PAS. PIPA PVC DIA. 3' #REF!
10 1 M' PAS. PIPA PVC DIA. 4' #REF!
11 1 M' INSTALASI AIR BERSIH #REF!
12 1 UNIT SEPTICTANK Rp 4,500,000.00

M PEKERJAAN LAIN-LAIN
1 1 M' SALURAN GREVEL U. 20 #REF!

N PEKERJAAN AKSES JALAN


1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
HARGA SATUAN BAHAN
#REF!
#REF!

HARGA SATUAN
NO. JENIS BAHAN SAT.
( Rp. )

A JENIS AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADI


1 Pasir urug m3 Rp 70,000.00
2 Tanah Urug m3 Rp 40,000.00
3 Pasir pasang m3 Rp 112,500.00
4 Pasir beton I/kasar m3 Rp 145,000.00
5 Batu belah pondasi m3 Rp 80,000.00
6 Batu pecah mesin 1/2 : 1 m3 Rp 200,000.00
7 Batu pecah mesin 1 : 2 m3 Rp 180,000.00
8 Batu pecah mesin 2 : 3 m3 Rp 170,000.00
9 Batu pecah mesin 5 : 7 m3 Rp 130,000.00
10 Semen PC 50 kg zak Rp 70,000.00
11 Semen PC 50 kg kg Rp 1,400.00
12 Semen warna kg Rp 2,500.00
13 Lem putih fox kg Rp 27,000.00

B BAHAN PENUTUP DINDING


1 Bata merah bakar kelas I bh Rp 650.00

C BAHAN LOGAM DAN BAHAN JADINYA


1 Besi baja beton kg Rp 8,700.00
2 Seng plat BJLS 30 lebar 90 cm (1 roll 50 m) m1 Rp 37,000.00
3 Seng plat BJLS 25 uk. 90 x 180 cm lbr Rp 42,500.00
4 Seng gelombang 3"-5" lbr Rp 45,000.00
5 Besi strip uk, 3 x 30 mm x 6 m kg Rp 10,000.00
6 Kawat beton kg Rp 20,000.00
7 Paku triplek kg Rp 18,000.00
8 Paku 1 s/d 3 cm kg Rp 20,000.00
9 Paku 4 s/d 7 cm kg Rp 17,000.00
10 Paku 8 s/d 12 cm kg Rp 14,000.00

D BAHAN PENGUNCI/PENGGANTUNG DAN KACA


1 Kunci Tanam psg Rp 180,000.00
2 Kunci KM/WC Bh Rp 75,000.00
3 Engsel pintu psg Rp 20,250.00
4 Engsel Jendela psg Rp 18,000.00
5 Grendel Jendela Biasa bh Rp 22,500.00
6 Hak Angin bh Rp 25,000.00
7 Kaca Polos 5mm m2 Rp 88,000.00

E BAHAN KAYU/KAYU LAPIS DAN PLAPOND


5 Kayu Balok Kelas II m3 Rp 1,800,000.00
6 Kayu Papan Kelas II m3 Rp 2,025,000.00
7 Kayu Kaso 5/7 m3 Rp 1,800,000.00
8 Kayu Reng 2/3 m3 Rp 1,575,000.00
9 Dolken dia. 8 s/d 10 cm btg Rp 7,000.00
10 Triplek 3 mm, uk. 1,20 x 2,40 lbr Rp 47,500.00
11 Triplek 4mm, uk. 1,20 x 2,40 lbr Rp 55,000.00
12 Multipek 9 mm, uk. 1,20 x 2,40 lbr Rp 120,000.00
13 Multiplek 12 mm, uk. 1,20 x 2,40 lbr Rp 175,000.00
14 Teakwood 3mm, uk. 1,20 x 2,40 lbr Rp 60,000.00
15 Teakwood 6mm, uk. 1,20 x 2,40 lbr Rp 77,000.00
16 Formika Putih Polos, uk. 1,20 x 2,40 lbr Rp 130,000.00
17 List kayu Profil m' Rp 4,500.00

G BAHAN PENUTUP LANTAI


1 Keramik Lantai uk. 30 x 30 cm, Polos Bh Rp 4,212.30
2 Keramik Lantai KM/WC uk. 20 x 20 cm, Polos m2 Rp 1,962.26
3 Keramik Dinding uk. 20 x 20 cm, Polos m2 Rp 1,962.26
HARGA SATUAN
NO. JENIS BAHAN SAT.
( Rp. )
HARGA SATUAN
NO. JENIS BAHAN SAT.
( Rp. )
H BAHAN PENUTUP ATAP
1 Genteng Pelentong Bh Rp 2,500.00
2 Bubung Genteng Pelentong Bh Rp 4,500.00

H BAHAN FINISHING
1 Cat Dasar Alkali ltr Rp 22,000.00
2 Cat tembok Sanlex kg Rp 22,500.00
3 Cat kayu / besi Avian kg Rp 42,500.00
4 Meni kayu / besi Bola Mas kg Rp 17,500.00
5 Dempul Tembok (plamuur) kg Rp 12,000.00
6 Dempul halus / Impra (Wood Filler) kg Rp 32,500.00
7 Terpentin ( minyak cat) ltr Rp 10,000.00
8 Minyak pelumas ltr Rp 2,000.00
9 Thinner A ltr Rp 18,000.00
10 Wood Stain kg Rp 42,000.00
11 Melamin Sending Siller MSS 123 kg Rp 125,000.00
12 Ampelas lbr Rp 5,000.00
13 Plamur Kayu kg Rp 27,000.00
14 Cat Dasar Kayu kg Rp 21,500.00
15 Residu Ltr Rp 22,000.00
16 Minyak Bekisting Ltr Rp 3,000.00
17 Roll Cat Bh Rp 17,500.00

I BAHAN PERPIPAAN
1 Pipa pralon PVC. (AW) dia. 1/2 inch, sekualitas Maspion (abu-abu) btg Rp 10,400.00
2 Pipa pralon PVC. (AW) dia. 3/4 inch, sekualitas Maspion (abu-abu) btg Rp 14,400.00
3 Pipa pralon PVC. (AW) dia. 1 inch, sekualitas Maspion (abu-abu) btg Rp 20,000.00
4 Pipa pralon PVC. (AW) dia. 1 1/4 inch, sekualitas Maspion (abu-abu) btg Rp 28,000.00
5 Pipa pralon PVC. (AW) dia. 1 1/2 inch, sekualitas Maspion (abu-abu) btg Rp 32,000.00
6 Pipa pralon PVC. (AW) dia. 2 inch, sekualitas Maspion (abu-abu) btg Rp 40,000.00
7 Pipa pralon PVC. (AW) dia. 2 1/2 inch, sekualitas Maspion (abu-abu) btg Rp 60,000.00
8 Pipa pralon PVC. (AW) dia. 3 inch, sekualitas Maspion (abu-abu) btg Rp 78,000.00
9 Pipa pralon PVC. (AW) dia. 4 inch, sekualitas Maspion (abu-abu) btg Rp 130,800.00
10 Grefel dia. 20 cm Bh Rp 30,000.00

J BAHAN / ALAT - ALAT SANITAIR


1 Kloset jongkok setara INA bh Rp 184,000.00
2 Wastafel lengkap bh Rp 1,174,320.00
3 Kran tembok Stainless bh Rp 40,000.00
4 Floor drain Stainless bh Rp 88,000.00
5 Bak Mandi Fibreglass bh Rp 200,000.00

K BAHAN ELEKTRIKAL
1 Kabel NYM 2 x 1,5 mm m1 Rp 11,000.00
2 Kabel NYM 3 x 2,5 mm m1 Rp 12,000.00
3 Saklar Tunggal setara Broco bh Rp 22,000.00
4 Saklar Ganda bh Rp 25,000.00
5 Stop kontak set. Broco bh Rp 17,000.00
6 Konduit m1 Rp 1,500.00
7 Lampu Pijar 11 W Bh Rp 30,000.00
8 Mini Circuit Breaker 6 A Bh Rp 100,000.00
DAFTAR HARGA SATUAN UPAH
#REF!
#REF!

HARGA SATUAN
NO. JENIS PEKERJA SAT.
( Rp. )

1 Pekerja Oh Rp 72,500.00
2 Tukang Batu Oh Rp 80,000.00
3 Kepala Tukang Batu Oh Rp 82,000.00
4 Tukang Kayu Oh Rp 80,000.00
5 Kepala Tukang Kayu Oh Rp 82,000.00
6 Tukang Besi profil / Tukang Las Oh Rp 80,000.00
7 Kepala Tukang Besi Profil Oh Rp 82,000.00
8 Tukang Besi Beton Oh Rp 80,000.00
9 Kepala Tukang Besi Beton Oh Rp 82,000.00
10 Tukang Cat Oh Rp 80,000.00
11 Kepala Tukang Cat Oh Rp 82,000.00
12 Tukang Gali Oh Rp 80,000.00
13 Kepala Tukang Gali Oh Rp 82,000.00
14 Tukang Pipa Oh Rp 80,000.00
15 Kepala Tukang Pipa Oh Rp 82,000.00
16 Tukang Listrik Oh Rp 80,000.00
17 Kepala Tukang Listrik Oh Rp 82,000.00
18 Mandor Oh Rp 90,000.00
Daftar Harga Upah
NO UPAH TENAGA KERJA Sat Harga Sumber
1 Pekerja oh 65,000.00 KBB 2017
2 Tukang Batu oh 75,000.00 KBB 2017
3 Tukang Kayu oh 75,000.00 KBB 2017
4 Tukang Besi profil / Tukang Las oh 75,000.00 KBB 2017
5 Tukang Besi Beton oh 75,000.00 KBB 2017
6 Tukang Cat oh 75,000.00 KBB 2017
7 Kepala Tukang oh 80,000.00 KBB 2017
8 Mandor oh 75,000.00 KBB 2017
DAFTAR HARGA BAHAN

No. Jenis Bahan Bangunan Sat Harga Satuan Keterangan

A BAHAN AGREGAT KASAR & BAHAN PEREKAT


1 Pasir Urug m3 115,000.00 KBB 2017
2 Pasir Pasang m3 201,300.00 KBB 2017
3 Pasir Beton m3 287,500.00 KBB 2017
4 Batu Belah m3 242,000.00 KBB 2017
5 Batu Pecah Mesin 2/3 m3 250,000.00 KBB 2017
6 Semen PC kg 1,500.00 KBB 2017
7 Semen Portland zak 68,200.00 KBB 2017
8 Semen Warna kg 11,000.00 KBB 2017

B BAHAN PENUTUP DINDING


1 Bata Merah buah 800.00 KBB 2017

C BAHAN LOGAM
1 Besi Beton U-24, Rata-rata Uk. Ø 8 s/d 16 mm kg 12,800.00 KBB 2017
2 Kawat Beton kg 29,700.00 KBB 2017
3 Paku Uk. 5 - 12 cm kg 14,000.00 KBB 2017
4 Paku Sekrup kg 35,700.00 KBB 2017

D BAHAN KAYU / KAYU LAPIS DAN PLAFOND


1 Kayu Kaso Albasia uk 5/7, 5/10, 6/12, 8/12, 8/15 m3 1,370,200.00 KBB 2017
2 Kayu Papan Albasia 3/30 m3 1,831,500.00 KBB 2017
3 Kayu Balok Borneo m3 3,653,800.00 KBB 2017
4 Dolken Ø 8 s.d. 10 cm btg 18,400.00 KBB 2017
5 Gypsum Board t=9mm lbr 68,600.00 KBB 2017
6 Multipleks 9 mm lbr 110,800.00 KBB 2017
7 Bambu dia. 5 - 7 Cm btg 8,900.00 KBB 2017

E BAHAN PENUTUP ATAP


1 Rangka Atap Galvalume + Reng Jarak Reng 27 m2 150,000.00 SURVEY PASAR
2 Seng Gelombang BJLS 30 lbr 69,200.00 KBB 2017
3 Genteng Palentong Natural Jatiwangi buah 3,900.00 KBB 2017
4 Bubungan Genteng Palentong Natural Jatiwangi buah 3,900.00 KBB 2017
5 Listplank GRC lbr 68,000.00 KBB 2017
6 Besi Hollow 40/40 m' 25,000.00 SURVEY PASAR
7 Besi Hollow 40/20 m' 16,000.00 SURVEY PASAR
8 Nok Metal Multiroof m' 45,000.00 SURVEY PASAR
9 Genteng Metal Multiroof m2 150,000.00 SURVEY PASAR

F BAHAN PENUTUP LANTAI


1 Keramik Lantai 30 x 30, Motif Warna m2 102,300.00 KBB 2017
2 Keramik Lantai 30 x 30, Putih Polos m2 91,000.00 KBB 2017
3 Keramik Lantai Non Slip 20x20, Warna m2 102,300.00 KBB 2017
4 Keramik Dinding 30x20, Motif Warna m2 102,300.00 KBB 2017

G BAHAN FINISHING
1 Cat Dasar Tembok kg 24,900.00 SURVEY PASAR
2 Cat Tembok Colour Interior kg 36,000.00 KBB 2017
3 Dempul (plamir) kg 14,100.00 KBB 2017
4 Kertas Amplas Kayu / Tembok lbr 2,900.00 KBB 2017
5 Roll Cat buah 24,100.00 KBB 2017
6 Minyak Bekisting liter 7,500.00 KBB 2017
7 Flint Coat liter 34,100.00 KBB 2017

H BAHAN LAIN LAIN


1 Ijuk Kg 9,900.00 KBB 2017
ANALISA HARGA SATUAN PEKERJAAN

NO. URAIAN SAT. KOEF. HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN
1 1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK
Bahan :
Kayu 5/7 Albasiah m3 0.0120 Rp 1,370,200.00 Rp 16,442.40
Paku 5 s/d 12 cm kg 0.0200 Rp 14,000.00 Rp 280.00
Kayu papan 3/20 albasiah m3 0.0070 Rp 1,831,500.00 Rp 12,820.50
Tenaga Kerja :
Pekerja Oh 0.1000 Rp 65,000.00 Rp 6,500.00
Tukang Kayu Oh 0.1000 Rp 75,000.00 Rp 7,500.00
Kepala Tukang Oh 0.0100 Rp 80,000.00 Rp 800.00
Mandor Oh 0.0050 Rp 75,000.00 Rp 375.00
Jumlah Rp 44,717.90

2 1 M3 PEMBONGKARAN PONDASI
Tenaga Kerja :
Pekerja Oh 6.4700 Rp 65,000.00 Rp 420,550.00
Mandor Oh 0.3330 Rp 75,000.00 Rp 24,975.00
Jumlah Rp 445,525.00

3 1 M3 PEMBONGKARAN DINDING TEMBOK


Tenaga Kerja :
Pekerja Oh 5.7100 Rp 65,000.00 Rp 371,150.00
Mandor Oh 0.3330 Rp 75,000.00 Rp 24,975.00
Jumlah Rp 396,125.00

4 1 M3 PEMBONGKARAN BETON
Tenaga Kerja :
Pekerja Oh 7.3000 Rp 65,000.00 Rp 474,500.00
Mandor Oh 0.3600 Rp 75,000.00 Rp 27,000.00
Jumlah Rp 501,500.00

5 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


Tenaga Kerja :
Pekerja Oh 0.1000 Rp 65,000.00 Rp 6,500.00
Mandor Oh 0.0500 Rp 75,000.00 Rp 3,750.00
Jumlah Rp 10,250.00

II PEKERJAAN TANAH
1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M'
Tenaga Kerja :
Pekerja Oh 0.4000 Rp 65,000.00 Rp 26,000.00
Mandor Oh 0.0400 Rp 75,000.00 Rp 3,000.00
Jumlah Rp 29,000.00

2 1 M3 URUGAN TANAH KEMBALI


Tenaga Kerja :
Pekerja Oh 0.1920 Rp 65,000.00 Rp 12,480.00
Mandor Oh 0.0190 Rp 75,000.00 Rp 1,425.00
Jumlah Rp 13,905.00

3 1 M2 PEMADATAN TANAH (per 20 cm)


Tenaga Kerja :
Pekerja Oh 0.5000 Rp 65,000.00 Rp 32,500.00
Mandor Oh 0.0500 Rp 75,000.00 Rp 3,750.00
Jumlah Rp 36,250.00

4 1 M3 URUGAN PASIR URUG


Bahan :
Pasir Urug m3 1.2000 Rp 115,000.00 Rp 138,000.00
Tenaga Kerja :
Pekerja Oh 0.3000 Rp 65,000.00 Rp 19,500.00
Mandor Oh 0.0100 Rp 75,000.00 Rp 750.00
Jumlah Rp 158,250.00

5 1 M2 LANTAI KERJA 1 Pc ; 5 Ps
Bahan :
Semen Portland zak 0.1500 Rp 68,200.00 Rp 10,230.00
Pasir Pasang m3 0.0220 Rp 201,300.00 Rp 4,428.60
Tenaga Kerja :
NO. URAIAN SAT. KOEF. HARGA SATUAN JUMLAH HARGA
Pekerja Oh 0.2000 Rp 65,000.00 Rp 13,000.00
Tukang Batu Oh 0.1500 Rp 75,000.00 Rp 11,250.00
Mandor Oh 0.0100 Rp 75,000.00 Rp 750.00
Jumlah Rp 39,658.60

III PEKERJAAN PONDASI


1 1 M3 PASANGAN BATU KALI 1 : 4
Bahan :
Batu belah m3 1.1000 Rp 242,000.00 Rp 266,200.00
Semen PC 50 kg zak 3.2600 Rp 68,200.00 Rp 222,332.00
Pasir Pasang m3 0.5200 Rp 201,300.00 Rp 104,676.00
Tenaga Kerja :
Pekerja oh 1.5000 Rp 65,000.00 Rp 97,500.00
Tukang Batu oh 0.6000 Rp 75,000.00 Rp 45,000.00
Kepala Tukang oh 0.0600 Rp 80,000.00 Rp 4,800.00
Mandor oh 0.0750 Rp 75,000.00 Rp 5,625.00
Jumlah Rp 746,133.00

2 1 M3 PASANG BATU KOSONG / AANSTAMPING


Bahan :
Batu belah m3 1.2000 Rp 242,000.00 Rp 290,400.00
Pasir Urug m3 0.3000 Rp 115,000.00 Rp 34,500.00
Tenaga Kerja :
Pekerja oh 0.7800 Rp 65,000.00 Rp 50,700.00
Tukang Batu oh 0.3900 Rp 75,000.00 Rp 29,250.00
Kepala Tukang oh 0.0390 Rp 80,000.00 Rp 3,120.00
Mandor oh 0.0390 Rp 75,000.00 Rp 2,925.00
Jumlah Rp 410,895.00
NO. URAIAN SAT. KOEF. HARGA SATUAN JUMLAH HARGA

IV PEKERJAAN STRUKTUR BETON


A 1 M3 MEMBUAT BETON MUTU f'c = 14,5 Mpa (K-175), SLUMP (12 +/- 2) cm, w/c = 0,66
Bahan :
Semen PC 50 kg Kg 326.0000 Rp 1,500.00 Rp 489,000.00
Pasir Beton m3 0.3192 Rp 287,500.00 Rp 91,770.00
Batu Pecah 2/3 m3 0.4322 Rp 250,000.00 Rp 108,045.00
Tenaga Kerja :
Pekerja oh 1.6500 Rp 65,000.00 Rp 107,250.00
Tukang Batu oh 0.2750 Rp 75,000.00 Rp 20,625.00
Kepala Tukang oh 0.0280 Rp 80,000.00 Rp 2,240.00
Mandor oh 0.0830 Rp 75,000.00 Rp 6,225.00
Jumlah Rp 825,155.00

A 1 M3 MEMBUAT BETON MUTU f'c = 14,5 Mpa (K-225), SLUMP (12 +/- 2) cm, w/c = 0,66
Bahan :
Semen PC 50 kg Kg 342.0000 Rp 1,500.00 Rp 513,000.00
Pasir Beton m3 0.3192 Rp 287,500.00 Rp 91,770.00
Batu Pecah 2/3 m3 0.5912 Rp 250,000.00 Rp 147,800.00
Tenaga Kerja :
Pekerja oh 1.6500 Rp 65,000.00 Rp 107,250.00
Tukang Batu oh 0.2750 Rp 75,000.00 Rp 20,625.00
Kepala Tukang oh 0.0280 Rp 80,000.00 Rp 2,240.00
Mandor oh 0.0830 Rp 75,000.00 Rp 6,225.00
Jumlah Rp 888,910.00

B 1 KG MENGERJAKAN BESI BETON TULANGAN


Bahan :
Besi beton Kg 1.0500 Rp 12,800.00 Rp 13,440.00
Kawat beton Kg 0.0150 Rp 29,700.00 Rp 445.50
Tenaga Kerja :
Pekerja oh 0.0070 Rp 65,000.00 Rp 455.00
Tukang Besi Beton oh 0.0070 Rp 75,000.00 Rp 525.00
Kepala Tukang oh 0.0007 Rp 80,000.00 Rp 56.00
Mandor oh 0.0004 Rp 75,000.00 Rp 30.00
Jumlah Rp 14,951.50

C 1 M2 BEKISTING UNTUK SLOOF


Bahan :
Kayu Albasiah m3 0.0450 Rp 1,370,200.00 Rp 61,659.00
Paku 5 s/d 10 cm kg 0.3000 Rp 14,000.00 Rp 4,200.00
Minyak Bekisting Ltr 0.1000 Rp 7,500.00 Rp 750.00
Tenaga Kerja :
Pekerja Oh 0.5200 Rp 65,000.00 Rp 33,800.00
Tukang Kayu Oh 0.2600 Rp 75,000.00 Rp 19,500.00
Kepala Tukang Oh 0.0260 Rp 80,000.00 Rp 2,080.00
Mandor Oh 0.0260 Rp 75,000.00 Rp 1,950.00
Jumlah Rp 123,939.00
D 1 M2 BEKISTING UNTUK KOLOM
Bahan :
Kayu Albasiah m3 0.0400 Rp 1,370,200.00 Rp 54,808.00
Paku 5 s/d 12 cm kg 0.4000 Rp 14,000.00 Rp 5,600.00
Minyak Bekisting ltr 0.2000 Rp 7,500.00 Rp 1,500.00
Balok Kayu Borneo m3 0.0150 Rp 3,653,800.00 Rp 54,807.00
Multipek 9mm lbr 0.3500 Rp 110,800.00 Rp 38,780.00
Dolken dia. 8 s/d 10 cm btg 2.0000 Rp 18,400.00 Rp 36,800.00
Tenaga Kerja :
Pekerja Oh 0.6600 Rp 65,000.00 Rp 42,900.00
Tukang Kayu Oh 0.3300 Rp 75,000.00 Rp 24,750.00
Kepala Tukang Oh 0.0330 Rp 80,000.00 Rp 2,640.00
Mandor Oh 0.0330 Rp 75,000.00 Rp 2,475.00
Jumlah Rp 265,060.00
E 1 M2 BEKISTING UNTUK RINGBALK
Bahan :
Kayu Albasiah m3 0.0400 Rp 1,370,200.00 Rp 54,808.00
Paku 5 s/d 12 cm kg 0.4000 Rp 14,000.00 Rp 5,600.00
Minyak Bekisting ltr 0.2000 Rp 7,500.00 Rp 1,500.00
Balok Kayu Borneo m3 0.0150 Rp 3,653,800.00 Rp 54,807.00
Multipek 9mm lbr 0.3500 Rp 110,800.00 Rp 38,780.00
Dolken dia. 8 s/d 10 cm btg 2.0000 Rp 18,400.00 Rp 36,800.00
Tenaga Kerja :
Pekerja Oh 0.6600 Rp 65,000.00 Rp 42,900.00
Tukang Kayu Oh 0.3300 Rp 75,000.00 Rp 24,750.00
Kepala Tukang Oh 0.0330 Rp 80,000.00 Rp 2,640.00
Mandor Oh 0.0330 Rp 75,000.00 Rp 2,475.00
Jumlah Rp 265,060.00
NO. URAIAN SAT. KOEF. HARGA SATUAN JUMLAH HARGA
1 1 M3 SLOOF BETON 15/20, 4 Ø 10, Ø 8 - 15, K-225
Adukan Beton K 175 m3 1.000 Rp 888,910.00 Rp 888,910.00
Besi beton U.24 Kg 73.595 Rp 14,951.50 Rp 1,100,355.64
Bekisting multiplek m2 9.660 Rp 265,060.00 Rp 2,560,479.60
Jumlah Rp 4,549,745.24
Dibulatkan Rp 4,549,700.00
2 1 M3 KOLOM STRUKTUR 30/30, 6 Ø 12, Ø 8 - 15, K-225
Adukan Beton K 225 m3 1.000 Rp 888,910.00 Rp 888,910.00
Besi beton U.24 Kg 73.595 Rp 14,951.50 Rp 1,100,355.64
Bekisting multiplek m2 9.820 Rp 265,060.00 Rp 2,602,889.20
Jumlah Rp 4,592,154.84

3 1 M3 KOLOM PRAKTIS 15/15, 6 Ø 12, Ø 8 - 15, K-175


Adukan Beton K 175 m3 1.000 Rp 825,155.00 Rp 825,155.00
Besi beton U.24 Kg 73.595 Rp 14,951.50 Rp 1,100,355.64
Bekisting multiplek m2 9.660 Rp 265,060.00 Rp 2,560,479.60
Jumlah Rp 4,485,990.24

4 1 M3 RINGBALK 15/20, 4 Ø 10, Ø 6 - 15, K-225


Adukan Beton K 225 m3 1.000 Rp 888,910.00 Rp 888,910.00
Besi beton U.24 Kg 73.595 Rp 14,951.50 Rp 1,100,355.64
Bekisting multiplek m2 9.660 Rp 265,060.00 Rp 2,560,479.60
Jumlah Rp 4,549,745.24

5 1 M3 PONDASI PLAT STRUKTUR 25/25, 6 Ø 12, Ø 8 - 15, K-225


Adukan Beton K 225 m3 1.000 Rp 888,910.00 Rp 888,910.00
Besi beton U.24 Kg 92.360 Rp 14,951.50 Rp 1,380,920.54
Bekisting multiplek m2 9.660 Rp 265,060.00 Rp 2,560,479.60
Jumlah Rp 4,830,310.14
NO. URAIAN SAT. KOEF. HARGA SATUAN JUMLAH HARGA

V PEKERJAAN PENUTUP ATAP


1 1 M2 KONSTRUKSI RANGKA ATAP BAJA RINGAN
Bahan :
Baja Ringan galvalume +reng m2 1.0000 Rp 150,000.00 Rp 150,000.00
Pekerja Oh 0.1000 Rp 65,000.00 Rp 6,500.00
Tukang Besi Oh 0.1000 Rp 75,000.00 Rp 7,500.00
Kepala Tukang Oh 0.0200 Rp 80,000.00 Rp 1,600.00
Mandor Oh 0.0200 Rp 75,000.00 Rp 1,500.00
Jumlah Rp 167,100.00

2 1 M' NOK MULTIROOF


Bahan :
Nok Metal Multiroof m2 1.0000 Rp 45,000.00 Rp 45,000.00
Pekerja Oh 0.0500 Rp 65,000.00 Rp 3,250.00
Tukang Besi Oh 0.0500 Rp 75,000.00 Rp 3,750.00
Kepala Tukang Oh 0.0100 Rp 80,000.00 Rp 800.00
Mandor Oh 0.0100 Rp 75,000.00 Rp 750.00
Jumlah Rp 53,550.00

3 1 M2 GENTENG METAL MULTIROOF


Bahan :
Genteng Metal Multiroof m2 1.0000 Rp 150,000.00 Rp 150,000.00
Pekerja Oh 0.0750 Rp 65,000.00 Rp 4,875.00
Tukang Besi Oh 0.0750 Rp 75,000.00 Rp 5,625.00
Kepala Tukang Oh 0.0150 Rp 80,000.00 Rp 1,200.00
Mandor Oh 0.0150 Rp 75,000.00 Rp 1,125.00
Jumlah Rp 162,825.00

4 1 M' LISPLANK GRC


Bahan :
Listplank GRC lbr 0.3000 Rp 68,000.00 Rp 20,400.00
Perlengkapan (20% dari bahan termasuk paku untuk
Kg 0.2000 Rp 13,600.00 Rp 2,720.00
GRC)
Tenaga Kerja :
Tukang Kayu Oh 0.3000 Rp 75,000.00 Rp 22,500.00
Kepala Tukang Oh 0.0300 Rp 80,000.00 Rp 2,400.00
Mandor Oh 0.0100 Rp 75,000.00 Rp 750.00
Jumlah Rp 48,770.00

8 1 M' FLASHING ATAP


Bahan :
Seng plat BJLS 30 lbr 0.3000 Rp 69,200.00 Rp 20,760.00
Paku 5 s/d 12 cm kg 0.0150 Rp 14,000.00 Rp 210.00
Kayu papan albasiah m3 0.0190 Rp 1,831,500.00 Rp 34,798.50
Flint coat ltr 0.3000 Rp 34,100.00 Rp 10,230.00
Tenaga Kerja :
Tukang Kayu Oh 0.4000 Rp 75,000.00 Rp 30,000.00
Kepala Tukang Oh 0.0250 Rp 80,000.00 Rp 2,000.00
Jumlah Rp 97,998.50

VI PEKERJAAN DINDING
1 1 M2 PASANGAN BATA MERAH 1/2 BATA, 1 PC : 5 PS
Bahan :
Bata Merah Bh 70.0000 Rp 800.00 Rp 56,000.00
Semen PC 50 kg Kg 9.6800 Rp 1,500.00 Rp 14,520.00
Pasir Pasang m3 0.0450 Rp 201,300.00 Rp 9,058.50
Tenaga Kerja :
Pekerja oh 0.3000 Rp 65,000.00 Rp 19,500.00
Tukang Batu oh 0.1000 Rp 75,000.00 Rp 7,500.00
Kepala Tukang oh 0.0100 Rp 80,000.00 Rp 800.00
Mandor oh 0.0150 Rp 75,000.00 Rp 1,125.00
Jumlah Rp 108,503.50

2 1 M2 PLESTERAN 1 PC : 5 PS
Bahan :
Semen PC 50 kg Kg 5.1840 Rp 1,500.00 Rp 7,776.00
Pasir Pasang m3 0.0260 Rp 201,300.00 Rp 5,233.80
Tenaga Kerja :
Pekerja oh 0.3000 Rp 65,000.00 Rp 19,500.00
Tukang Batu oh 0.1500 Rp 75,000.00 Rp 11,250.00
Kepala Tukang oh 0.0150 Rp 80,000.00 Rp 1,200.00
Mandor oh 0.0150 Rp 75,000.00 Rp 1,125.00
Jumlah Rp 46,084.80
NO. URAIAN SAT. KOEF. HARGA SATUAN JUMLAH HARGA
3 1 M2 ACIAN
Bahan :
Semen PC 50 kg Kg 3.2500 Rp 1,500.00 Rp 4,875.00
Tenaga Kerja :
Pekerja oh 0.2000 Rp 65,000.00 Rp 13,000.00
Tukang Batu oh 0.1000 Rp 75,000.00 Rp 7,500.00
Kepala Tukang oh 0.0100 Rp 80,000.00 Rp 800.00
Mandor oh 0.0100 Rp 75,000.00 Rp 750.00
Jumlah Rp 26,925.00

VII PEKERJAAN PLAFOND


1 1 M2 PLAFOND Gypsum Board T= 9mm
Bahan :
Gypsum Board t= 9mm lbr 0.3640 Rp 68,600.00 Rp 24,970.40
Paku Sekrup Kg 0.1100 Rp 35,700.00 Rp 3,927.00
Tenaga Kerja :
Pekerja Oh 0.1000 Rp 65,000.00 Rp 6,500.00
Tukang Kayu Oh 0.0500 Rp 75,000.00 Rp 3,750.00
Kepala Tukang Oh 0.0050 Rp 80,000.00 Rp 400.00
Mandor Oh 0.0050 Rp 75,000.00 Rp 375.00
Jumlah Rp 39,922.40
2 1 M2 RANGKA PLAFOND
Bahan :
Besi hollow uk. 40/40 m' 3.5000 Rp 25,000.00 Rp 87,500.00
Besi hollow uk. 40/20 m' 3.5000 Rp 16,000.00 Rp 56,000.00
aksesoris(10% dari bahan incude pengantung) % 10.0000 Rp 4,100.00 Rp 41,000.00
Tenaga Kerja :
Pekerja Oh 0.2500 Rp 65,000.00 Rp 16,250.00
Tukang Besi Oh 0.2500 Rp 75,000.00 Rp 18,750.00
Kepala Tukang Oh 0.0250 Rp 80,000.00 Rp 2,000.00
Mandor Oh 0.0130 Rp 75,000.00 Rp 975.00
Jumlah Rp 134,975.00
VIII PEKERJAAN LANTAI DAN KERAMIK
1 1 M2 MEMASANG LANTAI KERAMIK Uk. 30 x 30 cm, POLOS
Bahan :
Keramik 30 x 30 cm, Polos ex Mulya m2 1.0000 Rp 91,000.00 Rp 91,000.00
Semen PC 50 kg Kg 11.3800 Rp 1,500.00 Rp 17,070.00
Pasir Pasang m3 0.0420 Rp 201,300.00 Rp 8,454.60
Semen Warna Kg 1.5000 Rp 11,000.00 Rp 16,500.00
Tenaga Kerja :
Pekerja oh 0.6200 Rp 65,000.00 Rp 40,300.00
Tukang Batu oh 0.3500 Rp 75,000.00 Rp 26,250.00
Kepala Tukang oh 0.0350 Rp 80,000.00 Rp 2,800.00
Mandor oh 0.0300 Rp 75,000.00 Rp 2,250.00
Jumlah Rp 204,624.60

2 1 M2 MEMASANG LANTAI KERAMIK Uk. 30 x 30 cm, Motif Warna


Bahan :
Keramik 30 x 30 cm, Motif Kayu m2 1.0000 Rp 102,300.00 Rp 102,300.00
Semen PC 50 kg Kg 11.3800 Rp 1,500.00 Rp 17,070.00
Pasir Pasang m3 0.0420 Rp 201,300.00 Rp 8,454.60
Semen Warna Kg 1.5000 Rp 11,000.00 Rp 16,500.00
Tenaga Kerja :
Pekerja oh 0.6200 Rp 65,000.00 Rp 40,300.00
Tukang Batu oh 0.3500 Rp 75,000.00 Rp 26,250.00
Kepala Tukang oh 0.0350 Rp 80,000.00 Rp 2,800.00
Mandor oh 0.0300 Rp 75,000.00 Rp 2,250.00
Jumlah Rp 215,924.60

3 1 M2 MEMASANG LANTAI KERAMIK Non Slip Uk. 20 x 20 cm


Bahan :
Keramik Lantai Non Slip Uk. 20x20cm warna m2 1.0000 Rp 102,300.00 Rp 102,300.00
Semen PC 50 kg Kg 11.3800 Rp 1,500.00 Rp 17,070.00
Pasir Pasang m3 0.0420 Rp 201,300.00 Rp 8,454.60
Semen Warna Kg 1.5000 Rp 11,000.00 Rp 16,500.00
Tenaga Kerja :
Pekerja oh 0.6200 Rp 65,000.00 Rp 40,300.00
Tukang Batu oh 0.3500 Rp 75,000.00 Rp 26,250.00
Kepala Tukang oh 0.0350 Rp 80,000.00 Rp 2,800.00
Mandor oh 0.0300 Rp 75,000.00 Rp 2,250.00
NO. URAIAN SAT. KOEF. HARGA SATUAN JUMLAH HARGA
Jumlah Rp 215,924.60

4 1 M2 MEMASANG DINDING KERAMIK Uk. 30 x 20 cm, Motif warna


Bahan :
Keramik Dinding Uk. 30x20cm Motif Warna m2 1.0000 Rp 102,300.00 Rp 102,300.00
Semen PC 50 kg Kg 11.3800 Rp 1,500.00 Rp 17,070.00
Pasir Pasang m3 0.0420 Rp 201,300.00 Rp 8,454.60
Semen Warna Kg 1.5000 Rp 11,000.00 Rp 16,500.00
Tenaga Kerja :
Pekerja oh 0.6200 Rp 65,000.00 Rp 40,300.00
Tukang Batu oh 0.3500 Rp 75,000.00 Rp 26,250.00
Kepala Tukang oh 0.0350 Rp 80,000.00 Rp 2,800.00
Mandor oh 0.0300 Rp 75,000.00 Rp 2,250.00
Jumlah Rp 215,924.60

IX. PEKERJAAN PENGECATAN DAN FINISHING


1 1 M2 PENGECATAN PLAFOND
Bahan :
Plamir Kg 0.1100 Rp 14,100.00 Rp 1,551.00
Ampelas Lbr 0.3300 Rp 2,900.00 Rp 957.00
Cat Penutup, 2X Kg 0.1300 Rp 36,000.00 Rp 4,680.00
Rol Cat Bh 0.1000 Rp 24,100.00 Rp 2,410.00
Tenaga Kerja :
Pekerja oh 0.1300 Rp 65,000.00 Rp 8,450.00
Tukang Cat oh 0.1500 Rp 75,000.00 Rp 11,250.00
Kepala Tukang oh 0.0075 Rp 80,000.00 Rp 600.00
Mandor oh 0.0025 Rp 75,000.00 Rp 187.50
Jumlah Rp 30,085.50

2 1 M2 PENGECATAN LISTPLANK
Bahan :
Plamir Kg 0.1000 Rp 14,100.00 Rp 1,410.00
Cat Dasar Kg 0.1000 Rp 24,900.00 Rp 2,490.00
Cat Penutup, 2X Kg 0.2800 Rp 36,000.00 Rp 10,080.00
Rol Cat Bh 0.1000 Rp 24,100.00 Rp 2,410.00
Tenaga Kerja :
Pekerja oh 0.0700 Rp 65,000.00 Rp 4,550.00
Tukang Cat oh 0.0750 Rp 75,000.00 Rp 5,625.00
Kepala Tukang oh 0.0075 Rp 80,000.00 Rp 600.00
Mandor oh 0.0025 Rp 75,000.00 Rp 187.50
Jumlah Rp 27,352.50

3 1 M2 PENGECATAN BIDANG TEMBOK BARU


Bahan :
Cat Dasar tembok Kg 0.1000 Rp 24,900.00 Rp 2,490.00
Cat Penutup 2x Kg 0.2600 Rp 36,000.00 Rp 9,360.00
Kertas Amplas Kg 0.1000 Rp 2,900.00 Rp 290.00
Roll Cat Bh 0.0250 Rp 24,100.00 Rp 602.50
Tenaga Kerja :
Pekerja oh 0.0200 Rp 65,000.00 Rp 1,300.00
Tukang Cat oh 0.0630 Rp 75,000.00 Rp 4,725.00
Kepala Tukang oh 0.0630 Rp 80,000.00 Rp 5,040.00
Mandor oh 0.0025 Rp 75,000.00 Rp 187.50
Jumlah Rp 23,995.00

X. PEKERJAAN KUSEN DAN PANEL PINTU JENDELA


1 1 UNIT KUSEN ALUMUNIUM + PINTU TIPE P2
Bahan :
Kusen Alumunium Pintu Tipe P2 Unit 1.0000 Rp 800,000.00 Rp 800,000.00
Panel Pintu Tipe P2 Unit 1.0000 Rp 900,000.00 Rp 900,000.00
NO. URAIAN SAT. KOEF. HARGA SATUAN JUMLAH HARGA
Handle Pintu Unit 1.0000 Rp 280,000.00 Rp 280,000.00
Engsel Pintu Unit 1.0000 Rp 29,500.00 Rp 29,500.00
Kunci Unit 1.0000 Rp 95,000.00 Rp 95,000.00
Tenaga kerja :
Pekerja oh 0.1300 Rp 65,000.00 Rp 8,450.00
Tukang Kayu oh 0.2000 Rp 75,000.00 Rp 15,000.00
Mandor oh 0.1000 Rp 75,000.00 Rp 7,500.00
Jumlah Rp 2,135,450.00

2 1 UNIT KUSEN ALUMUNIUM + JENDELA TIPE J1


Bahan :
Kusen Alumunium Jendela Tipe J1 Unit 1.0000 Rp 300,000.00 Rp 300,000.00
Panel Jendela Tipe J1 Unit 1.0000 Rp 250,000.00 Rp 250,000.00
Handle Jendela Unit 1.0000 Rp 90,000.00 Rp 90,000.00
Engsel Jendela Unit 1.0000 Rp 10,200.00 Rp 10,200.00
Kaca Polos 5mm m2 0.6000 Rp 106,000.00 Rp 63,600.00
Tenaga kerja :
Pekerja oh 0.1300 Rp 65,000.00 Rp 8,450.00
Tukang Kayu oh 0.2000 Rp 75,000.00 Rp 15,000.00
Mandor oh 0.1000 Rp 75,000.00 Rp 7,500.00
Jumlah Rp 744,750.00

3 1 UNIT KUSEN ALUMUNIUM + JENDELA TIPE J2


Bahan :
Kusen Alumunium Jendela Tipe J2 Unit 1.0000 Rp 500,000.00 Rp 500,000.00
Panel Jendela Tipe J2 Unit 1.0000 Rp 400,000.00 Rp 400,000.00
Handle Jendela 2x Unit 1.0000 Rp 180,000.00 Rp 180,000.00
Engsel Jendela 2x Unit 1.0000 Rp 20,400.00 Rp 20,400.00
Kaca Polos 5mm m2 1.2000 Rp 106,000.00 Rp 127,200.00
Tenaga kerja :
Pekerja oh 0.1300 Rp 65,000.00 Rp 8,450.00
Tukang Kayu oh 0.2000 Rp 75,000.00 Rp 15,000.00
Mandor oh 0.1000 Rp 75,000.00 Rp 7,500.00
Jumlah Rp 1,258,550.00
DAFTAR KUANTITAS DAN HARGA

Pekerjaan : Pembangunan Gedung Kantor Ex Brantas


Lokasi : Basecamp & Kantor PLTA Upper Cisokan

JUMLAH
HARGA SATUAN
NO URAIAN PEKERJAAN SAT. VOL. HARGA
(Rp) (Rp)
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
5 Membersihan Lapangan dan Perataan m² 525.00 10,250.00 5,381,250.00
1 Pengukuran dan Pemasangan Bouplank m' 100.00 44,717.90 4,471,790.00
2 Bongkaran Pondasi m³ 6.21 445,525.00 2,766,710.25
3 Bongkaran Beton m³ 1.14 501,500.00 571,710.00
4 Bongkaran Dinding m³ 22.50 396,125.00 8,912,812.50
II. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Batukali m³ 206.55 29,000.00 5,989,950.00
2 Pek. Galian Tanah Pondasi Plat beton m³ 26.40 29,000.00 765,600.00
3 Pek. Urugan Tanah Kembali (Pondasi Batukali) m³ 133.65 13,905.00 1,858,403.25
4 Pek. Urugan Tanah Kembali (Pondasi Plat beton) m³ 17.50 13,905.00 243,281.88
5 Pek. Pemadatan Tanah Bangunan m² 105.00 36,250.00 3,806,250.00
6 Pek. Urugan Pasir Bawah Pondasi t = 5 cm m³ 10.80 158,250.00 1,709,100.00
7 Pek. Urugan Pasir Bawah Lantai t = 5 cm m³ 26.25 158,250.00 4,154,062.50
8 Lantai kerja Pondasi Plat Beton1 Pc : 5 Ps m² 16.00 39,658.60 634,537.60
III. PEKERJAAN PONDASI
1 Pas. Pondasi Batu Belah 1 : 4 m³ 72.90 746,133.00 54,393,095.70
2 Pas. Pondasi Batu Kosong ( Aanstamping ) t = 10 cm m³ 43.20 410,895.00 17,750,664.00
IV. PEKERJAAN STRUKTUR ( BESI & BETON )
1 Pas. Pondasi Plat beton 100/100 (P1) K-225 m³ 5.60 4,830,310.14 27,049,736.78
2 Pas. Sloof Beton 15/20 (S1) K-225 m³ 8.10 4,549,745.24 36,852,936.46
3 Pas. Kolom 30/30 (K1) K-225 m³ 8.96 4,592,154.84 41,164,076.01
4 Pas. Kolom Praktis (KP) K-175 m³ 0.45 4,485,990.24 1,998,508.65
5 Pas. Ringbalk 15/20, K-225 m³ 8.10 4,549,745.24 36,852,936.46
V. PEKERJAAN PLUMBING
1 Pek. Instalasi Air Kotor (Pipa PVC AW 4") m' 15.00 86,935.50 1,304,032.50
2 Pek. Instalasi Air Bersih (Pipa PVC AW 1 1/2") m' 20.00 63,241.50 1,264,830.00
VI. PEKERJAAN DINDING
1 Pas. Dinding 1/2 Bata 1 : 5 m² 765.60 108,503.50 83,070,279.60
2 Pek. Plesteran 1:5 m² 1,531.20 46,084.80 70,565,045.76
3 Pek. Acian Dinding, Kolom, Balok m² 1,554.96 26,925.00 41,867,298.00
4 Pek. Dinding Keramik KM/WC Uk. 20x25cm t=1,5m m² 46.50 215,924.60 10,040,493.90
VII. PEKERJAAN PLAFOND
1 Pas. Plafond Gypsum board m² 629.00 39,922.40 25,111,189.60
2 Pas. Rangka Plafond Hollow m² 629.00 134,975.00 84,899,275.00
VIII. PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 30 x 30 Putih Polos m² 496.00 204,624.60 101,493,801.60
2 Pek. Rabat Beton m² 629.00 46,084.80 28,987,339.20
3 Pas. Keramik Lantai non slip KM/WC Uk. 20x20cm m² 29.00 215,924.60 6,261,813.40
IX. PEKERJAAN PENGECATAN DAN FINISHING
1 Pek. Pengecatan Dinding Interior m² 777.48 23,995.00 18,655,632.60
2 Pek. Pengecatan Dinding Eksterior m² 330.00 23,995.00 7,918,350.00
3 Pek. Pengecatan Plafond m² 629.00 30,085.50 18,923,779.50
4 Pek. Pengecatan Listplank m² 43.20 27,352.50 1,181,628.00
X. PEKERJAAN SANITASI
1 Pas. Closet Duduk Unit 4.00 2,412,363.00 9,649,452.00
2 Pas. Urinoir Unit 3.00 2,166,763.00 6,500,289.00
3 Pas. Wastafel Unit 4.00 1,886,763.00 7,547,052.00
4 Pas. Kran Air 1/2" Unit 8.00 23,025.00 184,200.00
5 Pas. Floor Drain 2" Unit 2.00 23,625.00 47,250.00
7 Pek. Septic Tank m³ 8.00 1,129,563.35 9,036,506.79
8 Pas. Sumur Resapan m³ 7.00 1,417,213.35 9,920,493.44
XI. PEKERJAAN ELEKTRIKAL
1 Pek. Instalasi Penerangan bh 46.00 71,000.00 3,266,000.00
2 Pek, Instalasi Stop Kontak bh 16.00 67,250.00 1,076,000.00
3 Pas. Kabel NYM 3x2,5mm2 LP/PP m' 280.00 17,425.00 4,879,000.00
4 Pas. Lampu TL LED 18 watt bh 20.00 92,500.00 1,850,000.00
Pas. Lampu LED 18 watt bh 22.00 32,500.00 715,000.00
5 Pas. Saklar Tunggal bh 7.00 27,500.00 192,500.00
6 Pas. Saklar Ganda bh 14.00 42,500.00 595,000.00
7 Pas. Stop Kontak bh 16.00 32,500.00 520,000.00
8 Pas. Panel LP/PP-A dan MCB unit 1.00 9,707,500.00 9,707,500.00
9 Pas. BP Listrik 6600 Watt unit 1.00 7,800,000.00 7,800,000.00
XII. PEKERJAAN KUSEN
1 Pas. Kusen Alumunium + Pintu Type P2 unit 2.00 2,135,450.00 4,270,900.00
2 Pas. Kusen Alumunium + Jendela Type J1 unit 1.00 744,750.00 744,750.00
3 Pas. Kusen Alumunium + Jendela Type J2 unit 25.00 1,258,550.00 31,463,750.00
4 Pas. Kusen Aluminium Type BV1 unit 2.00 262,750.00 525,500.00
XIII. PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP
1 Pek. Rangka Atap Baja Ringan m2 629.00 167,100.00 105,105,900.00
2 Pek. Nok Multiroof m² 61.00 53,550.00 3,266,550.00
3 Genteng Metal Multiroof m' 629.00 162,825.00 102,416,925.00
4 Pekerjaan Listplank m' 108.00 48,770.00 5,267,160.00
TOTAL BIAYA Rp 1,085,419,878.94
DAFTAR KUANTITAS DAN HARGA

Pekerjaan : Pembangunan Gedung Kantor Ex Brantas


Lokasi : Basecamp & Kantor PLTA Upper Cisokan

JUMLAH
HARGA SATUAN
NO URAIAN PEKERJAAN SAT. VOL. HARGA
(Rp) (Rp)
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
5 Membersihan Lapangan dan Perataan m² 735.00 10,250.00 7,533,750.00
1 Pengukuran dan Pemasangan Bouplank m' 128.00 44,717.90 5,723,891.20
2 Bongkaran Pondasi m³ 8.10 445,525.00 3,608,752.50
3 Bongkaran Beton m³ 1.35 501,500.00 677,025.00
4 Bongkaran Dinding m³ 24.75 396,125.00 9,804,093.75
II. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Batukali m³ 249.39 29,000.00 7,232,310.00
2 Pek. Galian Tanah Pondasi Plat beton m³ 33.00 29,000.00 957,000.00
3 Pek. Urugan Tanah Kembali (Pondasi Batukali) m³ 161.37 13,905.00 2,243,849.85
4 Pek. Urugan Tanah Kembali (Pondasi Plat beton) m³ 21.87 13,905.00 304,102.35
5 Pek. Pemadatan Tanah Bangunan m² 147.00 36,250.00 5,328,750.00
6 Pek. Urugan Pasir Bawah Pondasi t = 5 cm m³ 13.04 158,250.00 2,063,580.00
7 Pek. Urugan Pasir Bawah Lantai t = 5 cm m³ 36.75 158,250.00 5,815,687.50
8 Lantai kerja Pondasi Plat Beton1 Pc : 5 Ps m² 20.00 39,658.60 793,172.00
III. PEKERJAAN PONDASI
1 Pas. Pondasi Batu Belah 1 : 4 m³ 88.02 746,133.00 65,674,626.66
2 Pas. Pondasi Batu Kosong ( Aanstamping ) t = 10 cm m³ 52.16 410,895.00 21,432,283.20
IV. PEKERJAAN STRUKTUR ( BESI & BETON )
1 Pas. Pondasi Plat beton 100/100 (P1) K-225 m³ 7.00 4,830,310.14 33,812,170.98
2 Pas. Sloof Beton 15/20 (S1) K-225 m³ 9.78 4,549,745.24 44,496,508.47
3 Pas. Kolom 30/30 (K1) K-225 m³ 11.95 4,592,154.84 54,885,434.68
4 Pas. Kolom Praktis (KP) K-175 m³ 0.74 4,485,990.24 3,330,847.76
5 Pas. Ringbalk 15/20, K-225 m³ 9.78 4,549,745.24 44,496,508.47
V. PEKERJAAN PLUMBING
1 Pek. Instalasi Air Kotor (Pipa PVC AW 4") m' 15.00 86,935.50 1,304,032.50
2 Pek. Instalasi Air Bersih (Pipa PVC AW 1 1/2") m' 20.00 63,241.50 1,264,830.00
VI. PEKERJAAN DINDING
1 Pas. Dinding 1/2 Bata 1 : 5 m² 844.80 108,503.50 91,663,756.80
2 Pek. Plesteran 1:5 m² 1,689.60 46,084.80 77,864,878.08
3 Pek. Acian Dinding, Kolom, Balok m² 1,713.36 26,925.00 46,132,218.00
4 Pek. Dinding Keramik KM/WC Uk. 20x25cm t=1,5m m² 46.50 215,924.60 10,040,493.90
VII. PEKERJAAN PLAFOND
1 Pas. Plafond Gypsum board m² 867.00 39,922.40 34,612,720.80
2 Pas. Rangka Plafond Hollow m² 867.00 134,975.00 117,023,325.00
VIII. PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 30 x 30 Putih Polos m² 706.00 204,624.60 144,464,967.60
2 Pek. Rabat Beton m² 867.00 46,084.80 39,955,521.60
3 Pas. Keramik Lantai non slip KM/WC Uk. 20x20cm m² 29.00 215,924.60 6,261,813.40
IX. PEKERJAAN PENGECATAN DAN FINISHING
1 Pek. Pengecatan Dinding Interior m² 856.68 23,995.00 20,556,036.60
2 Pek. Pengecatan Dinding Eksterior m² 422.40 23,995.00 10,135,488.00
3 Pek. Pengecatan Plafond m² 867.00 30,085.50 26,084,128.50
4 Pek. Pengecatan Listplank m² 54.40 27,352.50 1,487,976.00
X. PEKERJAAN SANITASI
1 Pas. Closet Duduk Unit 4.00 2,412,363.00 9,649,452.00
2 Pas. Urinoir Unit 3.00 2,166,763.00 6,500,289.00
3 Pas. Wastafel Unit 4.00 1,886,763.00 7,547,052.00
4 Pas. Kran Air 1/2" Unit 8.00 23,025.00 184,200.00
5 Pas. Floor Drain 2" Unit 2.00 23,625.00 47,250.00
7 Pek. Septic Tank m³ 8.00 1,129,563.35 9,036,506.79
8 Pas. Sumur Resapan m³ 7.00 1,417,213.35 9,920,493.44
XI. PEKERJAAN ELEKTRIKAL
1 Pek. Instalasi Penerangan bh 58.00 71,000.00 4,118,000.00
2 Pek, Instalasi Stop Kontak bh 20.00 67,250.00 1,345,000.00
3 Pas. Kabel NYM 3x2,5mm2 LP/PP m' 392.00 17,425.00 6,830,600.00
4 Pas. Lampu TL LED 18 watt bh 32.00 92,500.00 2,960,000.00
Pas. Lampu LED 18 watt bh 26.00 32,500.00 845,000.00
5 Pas. Saklar Tunggal bh 7.00 27,500.00 192,500.00
6 Pas. Saklar Ganda bh 14.00 42,500.00 595,000.00
7 Pas. Stop Kontak bh 20.00 32,500.00 650,000.00
8 Pas. Panel LP/PP-A dan MCB unit 1.00 9,707,500.00 9,707,500.00
9 Pas. BP Listrik 6600 Watt unit 1.00 7,800,000.00 7,800,000.00
XII. PEKERJAAN KUSEN
1 Pas. Kusen Alumunium + Pintu Type P2 unit 5.00 2,135,450.00 10,677,250.00
2 Pas. Kusen Alumunium + Jendela Type J1 unit 1.00 744,750.00 744,750.00
3 Pas. Kusen Alumunium + Jendela Type J2 unit 34.00 1,258,550.00 42,790,700.00
4 Pas. Kusen Aluminium Type BV1 unit 2.00 262,750.00 525,500.00
XIII. PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP
1 Pek. Rangka Atap Baja Ringan m2 867.00 167,100.00 144,875,700.00
2 Pek. Nok Multiroof m² 67.00 53,550.00 3,587,850.00
3 Genteng Metal Multiroof m' 867.00 162,825.00 141,169,275.00
4 Pekerjaan Listplank m' 136.00 48,770.00 6,632,720.00
TOTAL BIAYA Rp 1,377,999,119.37
REKAPITULASI

Pekerjaan : Pembangunan Gazebo


Lokasi : Access Road PLTA Upper Cisokan

NO. URAIAN PEKERJAAN JUMLAH HARGA

1 PEKERJAAN PERSIAPAN Rp 19,813,762.45


2 PEKERJAAN TANAH Rp 23,945,279.70
3 PEKERJAAN PONDASI Rp 87,106,909.86
4 PEKERJAAN STRUKTUR ( BESI & BETON ) Rp 147,209,299.38
5 PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP Rp 296,265,545.00
6 PEKERJAAN DINDING Rp 215,660,852.88
8 PEKERJAAN PLAFOND Rp 151,636,045.80
9 PEKERJAAN PENUTUP LANTAI Rp 184,420,489.20
10 PEKERJAAN PENGECATAN DAN FINISHING Rp 58,263,629.10
13 PEKERJAAN PAGAR PENGAMAN Rp 9,649,452.00
Jumlah Rp 1,193,971,265.37
Dibulatkan Rp 1,193,971,000.00
25-Dec-16 27-Dec-16 2