Project: Boiler Pressure Parts Repalcement at Unit-6 BQPS-1 Field Welding Joints Summary Chart Data Date: February 20, 2019
Project: Boiler Pressure Parts Repalcement at Unit-6 BQPS-1 Field Welding Joints Summary Chart Data Date: February 20, 2019
3468.00
PROGRESS
OVERALL
177.00
3645.00
2000.00
1800.00 1760.00
1622.00
1600.00
1400.00
1200.00
1000.00
812.00 792.00
800.00
725.00 706.00
600.00
200.00 138.00
20.00 0.00 0.00 0.00 19.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
Secondary Super Heater (SSH) Secondary Super Heater Vestibule Side Tertiary Super Heater (TSH) Tertiary Super Heater (TSH) Vestibule Re-Heater Hot (RHH) Re-Heater Hot (RHH) Vestibule Side Primary Super Heater Vertical Tubes
Side