Project : Boiler Pressure Parts Repalcement at Unit-6 BQPS-1

Field Welding Joints Summary Chart


Data Date : February 20, 2019

Total (Joints)… Welded… Remaining…

3468.00
PROGRESS
OVERALL

177.00

3645.00

0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 4000.00

2000.00

1800.00 1760.00

1622.00
1600.00

1400.00

1200.00

1000.00

812.00 792.00
800.00
725.00 706.00

600.00

400.00 348.00 348.00

200.00 138.00

20.00 0.00 0.00 0.00 19.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
Secondary Super Heater (SSH) Secondary Super Heater Vestibule Side Tertiary Super Heater (TSH) Tertiary Super Heater (TSH) Vestibule Re-Heater Hot (RHH) Re-Heater Hot (RHH) Vestibule Side Primary Super Heater Vertical Tubes