Sas Interior Boq

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

SUMMARY OF PRICED BILL OF QUANTITIES FOR OFFICE INTERIOR CONSTRUCTION (LABOUR WORK)

MUSCAT CONSTRUCTION AND TRADING PLC


SAS ETHIO IMPORT EXPORT

ITEM DESCRIPTION CURRENCY

1 LABOUR WORK

Sub Total of carried to Summary… ETH.BIRR

15% VAT ETH.BIRR


GRAND TOTAL AMOUNT INCLUDING VAT ETH.BIRR
OFFICE INTERIOR CONSTRUCTION (LABOUR WORK)
TION AND TRADING PLC
MPORT EXPORT

TOTAL AMOUNT

-
-
SUMMARY OF SPECIFICATION AND BILL OF QUANTITIES (LABOUR WORKS ONLY)
MUSCAT CONSTRUCTION AND TRADING PLC
SAS ETHIO IMPORT EXPORT

ITEM DESCRIPTION CURRENCY TOTAL AMOUNT

1. Gypsum Works -
2. Aluminium works -
3. Tempered Glass door Works -
4. Wooden partition Works -
5. Painting Works -
6. Electrical Works -
7. Wallpaper Works -
Sub Total of carried to Summary… ETH.BIRR -

15% VAT ETH.BIRR -


TOTAL AMOUNT INCLUDING VAT ETH.BIRR -
ITEM DESCRIPTION UNIT QTY UNIT RATE AMOUNT
1. Gypsum work (Labor Works Only)
1.1 Gypsum board false ceiling and partition m2 73.00 -
1.2 False ceiling frame (Labour and material) ml 45.00 -
1.3 Plastering m2 73.00 -
Total Carried to Summary -
2. Aluminium works (Labor Works Only)
2 Fix different angle aluminium frames m2 34.77
Total Carried to Summary -
3. Tempered Glass door Works (Labor and material)
3 Tempered glass front door with accessories m2 8.00
Total Carried to Summary -
4. Wooden partition Works (Labor Works Only)
4 Vertical louvre partitions made with MDF wood (Labour and material) m2 16.00
Total Carried to Summary -
5. Painting Works (Labor Works Only)
5 Painting works for walls and ceiling m2 205.00 -
Total Carried to Summary -
6. Electrical Works (Labor Works Only)
6 Electrical installtion pt 120.00 -
Total Carried to Summary -
7. Wallpaper Works (Labor Works Only)
7 Applying wallpapers on walls m2 45.00 -
Total Carried to Summary -
Grand Total Carried to Summary -
SUMMARY OF PRICED BILL OF QUANTITIES FOR OFFICE INTERIOR CONSTRUCTION (LABOUR & MATERIAL WORK)
MUSCAT CONSTRUCTION AND TRADING PLC
SAS ETHIO IMPORT EXPORT

ITEM DESCRIPTION CURRENCY

1 LABOUR AND MATERIAL WORK

Sub Total of carried to Summary… ETH.BIRR

15% VAT ETH.BIRR


GRAND TOTAL AMOUNT INCLUDING VAT ETH.BIRR
E INTERIOR CONSTRUCTION (LABOUR & MATERIAL WORK)
TION AND TRADING PLC
MPORT EXPORT

TOTAL AMOUNT

-
-
SUMMARY OF SPECIFICATION AND BILL OF QUANTITIES (LABOUR & MATERIAL)
MUSCAT CONSTRUCTION AND TRADING PLC
SAS ETHIO IMPORT EXPORT

ITEM DESCRIPTION CURRENCY TOTAL AMOUNT

1. Gypsum Works -
2. Aluminium works -
3. Tempered Glass door Works -
4. Wooden partition Works -
5. Painting Works -
6. Electrical Works -
7. Wallpaper Works -
Sub Total of carried to Summary… ETH.BIRR -

15% VAT ETH.BIRR -


TOTAL AMOUNT INCLUDING VAT ETH.BIRR -
ITEM DESCRIPTION UNIT QTY UNIT RATE AMOUNT
1. Gypsum work
1.1 Gypsum board false ceiling and partition m2 73.00 -
1.2 False ceiling frame m2 45.00 -
1.3 Plastering m2 73.00 -
Total Carried to Summary -
2. Aluminium works
2.1 Fix different aluminium frames and glass m2 34.77 -
Total Carried to Summary -
3. Tempered Glass door Works
3 Tempered glass front door with accessories m2 8.00
Total Carried to Summary -
4. Wooden partition Works
4 Vertical louvre partitions made with MDF wood (Labour and material) m2 16.00
Total Carried to Summary -
5. Painting Works
5 Painting works for walls and ceiling m2 205.00 -
Total Carried to Summary -
6. Electrical Works
6 Electrical installtion pt 120.00
Total Carried to Summary -
7. Wallpaper Works
7 Applying wallpapers on walls m2 45.00 -
Total Carried to Summary -
Grand Total Carried to Summary -

You might also like