Summary of Approved Budget For The Contract

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Republic of the Philippines

Department of Public Works and Highways


Region VIII
OFFICE OF THE DISTRICT ENGINEER
Samar First Engineering Office
Calbayog City

Contract ID: __________


LOCAL PROGRAM: Construction/Repair/Rehabilitation/Improvement of Various Infrastructure
Including Local Projects - Local Infrastructure Program
Construction of Multi-Purpose Building
Brgy. Sapinit, San Jorge, Samar
FORM ABC-2015-02-00
SUMMARY OF APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 60 CD

TOTAL MARK-UP
ITEM NO. DESCRIPTION ESTIMATED DIRECT COST VAT TOTAL INDIRECT COST TOTAL COST
% VALUE
14,000.00 10.00% 1,400.00 770.00 2,170.00 16,170.00
PART I FACILITIES FOR THE ENGINEER

164,948.75 2.26% 3,720.88 8,433.48 12,154.36 177,103.11


PART II OTHER GENERAL REQUIREMENTS

CIVIL, MECHANICAL, ELECTRICAL, AND SANITARY/PLUMBING 1,361,315.70 25.00% 340,328.96 85,082.23 425,411.19 1,786,726.89
PART III
WORKS
30,230.61 25.00% 7,557.66 1,889.42 9,447.08 39,677.69
PART A EARTHWORK

325,411.19 25.00% 81,352.80 20,338.19 101,690.99 427,102.18


PART B PLAIN AND REINFORCED CONCRETE WORK

1,005,673.90 25.00% 251,418.50 62,854.62 314,273.12 1,319,947.02


PART C FINSHINGS AND OTHER CIVIL WORKS

1,540,264.45 345,449.84 94,285.71 754,008.67 1,980,000.00


TOTAL

Preparation and Submission: Approval:

Prepared by: Checked/Submitted by: Recommending Approval: Approved:

JOHN REY R. BERNATE ROSTER L. ANDAYA DENIS C. CAGOMOC ALVIN A. IGNACIO


Engineer II OIC Chief, Planning and Design Section Assitant District Engineer District Engineer

[Autogenerated Code]