1) Chest pains

2) All are safe


3) managing house hold n work
too many pressure n work and hours.

Use your support network.


Stable footing n work to keep busy at this crazy times.

Whine abt something.

Code 2 all P&IDS

DCU
VDU
VGO

IFH-ISSUED FOR HAZOP.


markup and closure
till next week.

1) P&ID
2) PDS
3) Vendor data before 60% MR
4) Inline instruments, CV, FE, Relief valves. Plan to complete latest by end of May
2020.
5) Productivity.
6) FDO markups

FE-1-2 hrs

CV-
Pump circuits- 3,4hrs
including all documentation

Non pump circuits-


simple/overhead/exchanger loop- 3-4 hrs
complex/flashing liquid- if start from scratch. 1 full day required.

CV to flare

Isos

Low pressure circuits, need verification w.r.t. Isometrics.

Upstream properties only.. Inlet properties of CV.

1) 2 phase flow- make more number of segments or Rigorous line size model of PALS.
2) PALS, AFT ARROW, FATHOM
3) Change list
Category C1: impact on size; flow, DP, etc
Category C2: other things

4) Include all the cases and all the flow rates.

5) for gas n vapour; source and destination Pressure governs


6) MCF; min flow=30% of rates capacity.
T, L controlled ...size CV for above
F controlled ...size CV for difference of Min flow and process min flow

additional 10% to flow shall be added when demanded.

7) latest PMS, Piping material specification...location?

8) Critical circuits shall be done with Isos n snapshot from model.

9) Inline instruments- Info in ITB for FE, RO. Initial basis is that.
It is for rates flow.

10) DO ALL CASES.......add note for line sizing criteria

11) Rated flow- min pressure drop, Min flow- Max pressure drop.
B/L- Max flow case take min B/L pressure. Min case use max B/L pressure.

min P with HLL in case of Vessels to have ,ore DP.

12) In/breathings latest P

13) amt of flash at downstream of CV need to be specified.

14) min elevation required need to be specified on P&ID

15) 2.2.21 vp in case of Liquids. Update the Critical P,T.

Vessel overhead line; CV inlet outlet. Stream data.


Flow is not matching stream data. Gas flow rate in Act m3/hr and not Mol. wt.
Discharge press not available.

16) Flow elements: normal n start up requirement, min max flow may occur. Datasheet
shall include all scenarios.bi-directional.

Flow elements of CV loop need to be completed along with.

Rev 0A to TPL
Rev 0 later to Client

DPDT
PMS
PLOT PLAN

REFERENCES .......ALL

SELF CP----COVER SHEET, PALS, SKETCH,


DATASHEET

ITB FILE....

AMendments of ITB....
FE direct to Client REV 0 not Rev 0A
FV- REV 0A.- TPL...
non pump circuits- line sizing also need to be done.

refer
only pressure profile....line length
PMS
FE DP
elevations

FO/FC,
TSO,
HANDWHEEL
DP
DT
STREAM SUMMARY-, OP P,T, FLOW RATE

PUMP CIRCUIT
PRESSURE PROFILE, FLOW RATES ARE TAKEN FROM PUMP CALC FOR CONSISTENCY AND
ALIGNMENT.

REFERENECE: P-109 REV 1...


V.P. REFERENCE IS STREAM SUMMARY. OR ITB

CV-PRESSURE.....
pressure profile,
dp,
inlet pressure

GOVERNING CASE 1,2.

Add reference in change list too.

COVER PAGE ONLY HAS 0A..........REST ALL 0.

1) CV flow rate focus, DP secondary. for ITB missing datasheets


2) MCF lines, small flow Orifice, big lines CV req

CV DP......................flow less, head is more

head moves towards shut off.

1) lower frictional losses


2) pump head

CHECKS:
1) DESALTER FUNCTIONALITY; DP INC/DEC TREND?
2) DOWNSTREAM THERE ARE ELEMENTS WHICH ARE SEEING MAJOR PRESSURE DROP.