Professional Documents
Culture Documents
CV
CV
CV
DCU
VDU
VGO
1) P&ID
2) PDS
3) Vendor data before 60% MR
4) Inline instruments, CV, FE, Relief valves. Plan to complete latest by end of May
2020.
5) Productivity.
6) FDO markups
FE-1-2 hrs
CV-
Pump circuits- 3,4hrs
including all documentation
CV to flare
Isos
1) 2 phase flow- make more number of segments or Rigorous line size model of PALS.
2) PALS, AFT ARROW, FATHOM
3) Change list
Category C1: impact on size; flow, DP, etc
Category C2: other things
9) Inline instruments- Info in ITB for FE, RO. Initial basis is that.
It is for rates flow.
11) Rated flow- min pressure drop, Min flow- Max pressure drop.
B/L- Max flow case take min B/L pressure. Min case use max B/L pressure.
16) Flow elements: normal n start up requirement, min max flow may occur. Datasheet
shall include all scenarios.bi-directional.
Rev 0A to TPL
Rev 0 later to Client
DPDT
PMS
PLOT PLAN
REFERENCES .......ALL
ITB FILE....
AMendments of ITB....
FE direct to Client REV 0 not Rev 0A
FV- REV 0A.- TPL...
non pump circuits- line sizing also need to be done.
refer
only pressure profile....line length
PMS
FE DP
elevations
FO/FC,
TSO,
HANDWHEEL
DP
DT
STREAM SUMMARY-, OP P,T, FLOW RATE
PUMP CIRCUIT
PRESSURE PROFILE, FLOW RATES ARE TAKEN FROM PUMP CALC FOR CONSISTENCY AND
ALIGNMENT.
CV-PRESSURE.....
pressure profile,
dp,
inlet pressure
CHECKS:
1) DESALTER FUNCTIONALITY; DP INC/DEC TREND?
2) DOWNSTREAM THERE ARE ELEMENTS WHICH ARE SEEING MAJOR PRESSURE DROP.