Visit Report No.01

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 21

Organization : Noor Advance contractiog Report No.

NACC-JW-01

Project : AL-Jubail Warehouses Date: Monday, April 12, 2021

Site Visit Report

Project AL-Jubail Warehouses

Contractor Allí Abdullah aldwaighry contracting est.

Site Visit By Eng'r .Mahmoud Tawfiq

Mr.Hatem

Work in progress
Work Progress
and Site
Conditions
work continue on demolish.

work continue on epoxy painting for steel repar protection.

advice to move to grouting considering site conditions.

Site Conditions

we advise to finish all epoxy painting (photo 1).

Remove all loose material or dust before using bonding agent (photo 2).

Tie or add column stirrups before grouting (photo 3).

As per our conversation a full sample will be finished on next Saturday (photo 4).

Three stages for maintenance must be applied (Preparation,Application & Allignment ).

Nondestructive testing will be applied after finishing to check strength.

Observations Must use approved material & considering storage conditions .

Work must be done by Professionl manpower.

Follow Safety Precautions.

Site need more cleaning.

Data sheet for all used material to be submitted.

Photoes

Photo (1) Photo (2)

Photo (3) Photo (4)


Quotation
Project VERTICAL STORAGE TANK FOUNDATION Date: Monday, April

Client ABDULLAH HASHEM COMPANY No. QUT-RU-AHC-2

NO. ITEM DESCRIPTION

DESIGN RAFT FOUNDATION FOR VERTICAL


1 STORAGE TANK AS PER CLIENT
REQUIREMENT .

2 SUPERVISION VISIT & PHOTO REPORT

Total (SR)
THANK YOU FOR YOUR BUSINESS

Photo (1)

Photo (3)
Photo (5)

Photo (7)

Photo (9)
Monday, April 12, 2021

QUT-RU-AHC-2256

UNIT PRICE NOTES

8000 SITE ALREADY INSPECTED

2000 PER VISIT

10,000
APPROVED BY

NAME :

SIGNATURE :

Photo (2)

Photo (4)
Photo (6)

Photo (8)

Photo (10)
CHECK DESIGN AND CALCULATIONS REPORT FOR
EXISTING ARGON TANK FOUNDATION DUE TO NEW
LOAD APPLIED ,REV.01

AHG Abdullah Hashim Industrial Gases &


Equipment Co. Ltd. Dammam 2nd Industrial City
,DAMMAM, SAUDI ARABIA

Perpared by:
Eng'r / Hany Mohammed
Senior structural engineer
17.02.2021
STRUCTURAL DESIGN ANALYSIS REFERANCE
A. DESIGN CRITERIA

1.0 INTRODUCTION

This specifications list the design criteria used while performing calculations for the design
check of ARGON Tank Foundation.
Briefly described herein are the design approach adopted, various codes used,
materials properties, loads and soil properties. This criterion complies with all relevant
Intenational Code and Standards.

1.1 DESIGN APPROACH

Check if the new applied load (New tank = 85 ton) due to increase tank capacity could be
suppored safely with existing raft foundation.

1.2 APPLICABLE CODE AND STANDARDS

ACI 318M-14 American Concrete Institute, Building Code Requirements


for Structural Concrete.

ACI 315 American Concrete Institute, Details and Detailing of


Concrete Reinforcement.

ASCE 7 Minimum Design Loads for Buildings and other Related


Structures.

1.3 MATERIALS

1.3.1 Concrete:
Concrete cylinder compressive strength at 28 days shall be, f'c = 28 Mpa.
for concrete pavement and f'c = 17 Mpa for blinding concrete.
1.3.2 Cement:
Portland cement shall conform to ASTM C150. Sulphate resistant cement Type V shall
be used for concrete pavement.
1.3.3 Reinforcing Steel Bars:
All reinforcing steel bars shall conform to ASTM A615M grade 60 deformed bars
with fy = 414 Mpa.

1.4 DESIGN LOADS


1.4.1 Dead Load

a) Concrete = 24.00 KN/M3


b) Weight of soil = 18.00 KN/M3
c) Weight of old Tank (Full) = 61.00 tons, P o = 610.00 KN By Client
d) Weight of new Tank (Full) = 85.00 tons, P N = 850.00 KN By Client
d) Weight of new Tank (Empty) = 21.00 tons, We = 210.00 KN By Client
STRUCTURAL DESIGN ANALYSIS REFERANCE

1.4.2 Wind Load


qz = 0.613 Kz Kzt Kd V2 ASCE 7-10
Where:
qz = Velocity pressure evaluated at height z as defined in Section 29.3.2
Kz = Velocity pressure exposure coefficient defined in Section 29.3.1 Table 23.3-1
Exposure C
= 0.85 (0 - 4.60) meters high
= 0.94 Upto 7.60 meters high
= 0.98 Upto 9.10 meters high
= 1.04 Upto 12.20 meters high
Kzt = 1.00 - Topographic factor defined in Section 26.8.2 Table 26.6-1
Kd = 0.95 - Wind directional factor defined in Section 26.6
V = Wind velocity = 155 Km/hour (43 M/sec) By Client

1.5 SOIL BEARING CAPACITY


The Net Allowable Soil Bearing Capacity (SBC) as per KAABI Geotechnical Soil
Investigation Report is equal 60 KN/M2 Soil Report
STRUCTURAL DESIGN ANALYSIS REFERANCE
B. CHECK FOUNDATION DIMENSION

DATA: (Povided by Client)


Diameter of Tank, D = 3.00 M
Tank Height, H = 9.00 M
Weight of NEW Tank Full (85 tons) (WF)= 850.00 KN

Existing Footing Size: Width, B = 3.10 M


Length, L = 3.10 M
Thickness, T = 0.60 M

Actual Area, AF = B x L = 9.61 M2

Weight of Footing, W = B x L x T x 24 = 138.40 KN

Calculate Required Area of Footing

A(Approx.) = WF x 1.10 / SBC = 850*1.10/60 = 15.58 m2 < 9.61 m2 Unsafe

Plan
STRUCTURAL DESIGN ANALYSIS REFERANCE
C. Calculate Wind Load:

LOAD DIAGRAM

Wind Load: ASCE 7-10


qz = 0.613 Kz Kzt Kd V2
F = qz G Cf Af
Where:
F = Design wind pressure
G = 0.85 - Gust effect factor from Section 26.9
Cf = Force coefficient from Fig. 29.5-1
Af = Projected area normal to wind

Therefore, qz= 0.613 x 1.04 x 1.00 x 0.95 x 432 / 1000 = 1.12 KN/M2

H / D = 3.15
D√qz = 103.92
Cf = 0.90 Figure 29.5-1 Figure 29.5-1

Af = 9.00*3.00 = 27 M2

Fx = 1.12 x 0.85 x 0.90 x 9.00* 3.00 = 23.13 KN


STRUCTURAL DESIGN ANALYSIS REFERANCE
D. Check Footing Stability:

D-1 Factor of Safety Against Overturning (F.S.O.)

Tank is critical when empty

Righting Moment (R.M)


F.S.O. = ≥ 1.50
Overturning Moment ( O.M)

Calculate Righting Moment, (R.M.): Take Σ of Moment at point A


= WE x L / 2 = 210*3.10/2= 325.50 KN-M
= W x L / 2 = 138.40*3.10/2= 214.52 KN-M
Total R.M. = 540.02KN-M

Calculate Overturning Moment, (O.M.):


O.M. = Fx (H / 2 + T) = 23.13*5.10 = 118.00 KN-M

F.S.O. = R.M. / O.M. = 4.57 > 1.50 Safe

D-2 Factor of Safety Against Sliding, (F.S.S.):


μ (WE + W)
F.S.S. = ≥ 1.50
Fx
μ = 0.30 (For concrete & Polyethylene sheet)

F.S.S. = 4.54 > 1.50 safe


STRUCTURAL DESIGN ANALYSIS REFERANCE
E. Check Actual Soil Pressure

E.1 Case (1) : Tank Empty


Calculate Eccentricity, e

R.M. - O.M.
X= = 1.21 m
ΣP

L
e= -X = 0.34 m
2
e < L / 6, Therefore the Resultant Force is within the middle third

p(max.)/p(min.) = (ΣP / AF) ± Mc / I


Where:
AF = Area of Footing = L x B = 9.61 M2
M = O.M. = 118.00 KN-M
c = L / 2 = 1.55 M
I = B x L3 / 12 = 7.70 M4

p(max.) = 60.00 KN/M2 = S.B.C. = 60 KN/M2 Safe


STRUCTURAL DESIGN ANALYSIS REFERANCE
E.2 Case (2) : Tank Full
Calculate Eccentricity, e

R.M. = WF x L / 2 = 1317.50 KN-M


W x L / 2 = 214.52 KN-M
Total R.M. = 1532.20 KN-M

R.M. - O.M.
X= = 1.43 m
ΣP

L
e= - X = 0.12 m
2
e < L / 6, Therefore the Resultant Force is within the middle third

p(max.)/p(min.) = ΣP / AF ± Mc / I
Where:
AF = Area of Footing = L x B = 9.61 M2
M = O.M. = 118.00 KN-M
c = L / 2 = 1.55 M
I = B x L3 / 12 = 7.70 M4

p(max.) = 118.17 KN/M2 > S.B.C. = 60 KN/M2 Unsafe

p(max.) is greater than the allowable and even, as per code: If the Vertical Load is
combined with Wind Load, the Allowable Soil Bearing Capacity could be increased by
33 %, Therefore 60 x 1.33 = 79.80 KN/M2 < p(max.). Unsafe

F. 1. Summary Report

No. Test Result


1 CHECK FOUNDATION DIMENSION Unsafe
2 Check Footing Stability: Safe
3 Check Actual Soil Pressure Unsafe

2. Conclusion
1. The existing tank foundation is not capable of carrying extra loads due
to Unsafe soil pressure that could lead to differtial settlement and structure failure.

2.To accept extra load , Soil bearing capacity must be improved by replacing the poor soil
with A-1-a Material and apply compaction Test or increase foundation dimensions .
INVOICE.
Project L 150 UPGRADE PROJECT DAMMAM Date: Monday, April 12, 2021

Client ABDULLAH HASHEM COMPANY No. INV-RU-AHC-1121

NO. ITEM DESCRIPTION UNIT PRICE NOTES

1 DESIGN CHECK & REPORT FOR TANK FOUNDATION 2000 NO VAT. REGISTERATION

Total (SR) 2,000

THANK YOU FOR YOUR BUSINESS


Photo (1) Photo (2)

Photo (3) Photo (4)

Photo (5) Photo (6)

Photo (7) Photo (8)

Photo (9) Photo (10)


Quotation
Project ARGON STORAGE TANK FOUNDATION Date: Monday, April 12, 2021

Client ABDULLAH HASHEM COMPANY No. QUT-RU-AHC-2421

NO. ITEM DESCRIPTION UNIT PRICE NOTES

1 DESIGN RAFT FOUNDATION FOR ARGON 4,000 SITE ALREADY INSPECTED


STORAGE TANK AS PER CLIENT REQUIREMENT .

2 SUPERVISION VISIT & PHOTO REPORT 5,000 FIVE VISITS

Total (SR) 9,000

NOTES:
1.ADDITIONAL SUPERVISION VISIT CHARGES 1000 SR/VISIT .
2.FIRST INVOICE TO BE SUBMITTED AFTER ITEM NO.01 COMPLETION.
2.SECOND INVOICE TO BE SUBMITTED AFTER ITEM NO.02 COMPLETION.

THANK YOU FOR YOUR BUSINESS


Quotation
DESIGN OF ARGON STORAGE TANK
Project FOUNDATION & COOLING WATER SYSTEM Date: Monday, April 12, 2021
SUPPORTS

Client ABDULLAH HASHEM COMPANY No. QUT-RU-AHC-2472

NO. ITEM DESCRIPTION UNIT PRICE NOTES

DESIGN RAFT FOUNDATION FOR ARGON


1 STORAGE TANK AS PER CLIENT REQUIREMENT . 4,000 SITE ALREADY INSPECTED

2 SUPERVISION VISIT & PHOTO REPORT 5,000 FIVE VISITS

3 ANALYSIS AND DESIGN FOR PUMP FOUNDATION. 2,000 SITE ALREADY INSPECTED

4 ANALYSIS AND DESIGN FOR COOLING TOWER SUPPORT 2,000 SITE ALREADY INSPECTED
FOUNDATION.

5 ANALYSIS AND DESIGN FOR WATER PIPELINES SUPPORT. 2,000 SITE ALREADY INSPECTED

Total (SR) 15,000

NOTES:
1.ADDITIONAL SUPERVISION VISIT CHARGES 1000 SR/VISIT .
2.SINGLE INVOICE TO BE SUBMITTED AFTER EACH JOB COMPLETION.

THANK YOU FOR YOUR BUSINESS