Project: Wiltmont´s Drone Case KEY

Duration
Revision: #1 Early Start
(weeks)
Early finish CRITICAL PATH
Date: 17-01-2021 Activity name and number
Total
Late Start Late Finish
Slack

0 2 2 7 5 12 14 5 19 19 3 22
1.1.2 Engage 1.3.1 Purchase 1.3.5 Drone
1.2.3 Drone Design
Stakeholders Materials Assembly
1 1 3 7 0 12 14 0 19 19 0 22

14 4 18
0 3 3 3 1 4 4 1 5 5 2 7 12 2 14 1.3.2 Design
0 0 0 1.1.1 Develop Scope 1.1.3 Kick Off 1.2.1 Define Project 1.2.2 Create a 1.2.6 Project Plan Program to control 18 2 20
Start and Plan Meeting Team Project Scope Approval the drone 1.3.4 Protection of
0 0 0 0 0 3 3 0 4 4 0 5 5 0 7 12 0 14 18 4 22 the data
22 4 24
7 1 8 8 1 9 9 1 10 14 3 17
1.2.4 Procurement 1.3.3 Design
1.2.5 Cost estimate 1.2.6 Cost Approvals
quotations Program to get the
9 2 10 10 2 11 11 2 12 prescriptions
19 5 22

Downloaded by Fixed Match (6fixedmatch80r@manyt.site)


lOMoARcPSD|8014120

35 1 36
1.5.2 Delivery of
22 3 25 27 1 28 28 3 31 31 2 33 manuals
1.3.10 Drone final 1.4.2 Wiltmont´s 36 1 37
1.3.8 First Flights 1.4.1 Flight testing
presentation Approval flight
22 0 25 25 2 27 27 0 28 28 0 31 31 0 33 33 2 35 35 2 37 37 4 41 41 2 43 43 2 45 45 1 46
1.4.5 Validate whole 1.5.3 Delivery of 1.6.1 Audit intern 1.6.2 Formal
1.3.9 User Training 1.5.4 Train staff 1.6.2 Lesson Learned
system spare parts processes Approval
25 0 27 33 0 35 35 0 37 37 0 41 41 0 43 43 0 45 45 0 46
20 1 21 27 2 29 29 2 31 31 1 32
1.3.6 Validation of all 1.3.11 Create all the 1.4.3 Software 1.4.4 Wiltmont´s 35 1 36
the programs manuals testing Approval software
1.5.1 Drones deliver
24 4 25 28 1 30 30 1 32 32 1 33
36 1 37