Professional Documents
Culture Documents
Daily Activities Report: Friday 8 November 2013
Daily Activities Report: Friday 8 November 2013
Annex Ref. :
Ø Both DE & NDE dry gas seals were removed from their containers and
exercised however it was noticed that the DE seal has some free movement on
the inner race of the seal and the carbon ring also has free movement.
Ø D-R Rep contacted D-R tech support for clarification if this is acceptable for
installation.
Ø It was required to fabricate a plate with the required hole centres to install
the inner-labyrinths.
Notes :