A survey was carried out in Maxis Cabin room at Bangsar Shopping Complex by U
Mobile technical team for the purpose of In-Building antenna system sharing, under
Access Agreement for deployment of our 3G services. This TP is submitted for MAXIS
evaluation.
Objective
To seek Maxis approval, on IBC sharing for the deployment of 3G service inside
Bangsar Shopping Complex.
Scope
TABLE OF CONTENT
1. Site Information
3. Equipment Location
5. Site Approval
6. Attachment
7. Bill of Quantity
1) SITE INFORMATION
1.1 LOCATION MAP
Contact no N/A
Type of building Shopping Mall
No of floors 6
No of blocks 1
Longitude -NA-
Latitude -NA-
2) NETWORK SURVEY DATA
Floor materials NA
Wall materials NA
Air conditioning NO
Equipment Type
RBS 2206, Huawei
No of Existing Sectors 1
Sector 1: 1
Sector 2: 1
Sector 3: 1
2.4.2 EARTHING
Method Tapping from existing AC & DC busbar
TX Location Rooftop
Azimuth -NA-
Grounding
3.3 TRANSMISSION
3.3.1 FAREND OPTION
Propose E1 sharing with existing UMobile outdoor site
Transmission
4) DISTRIBUTED ANTENNA SYSTEM
4.1 EXISTING / PROPOSED COMBINING CIRCUIT
Existing Combining Circuit
Proposed one MCB inside Maxis ACDB for RRU power supply
Fiber Routing
Prepared By
R&A Telecommunication Sdn Bhd
(contractor) 23.12.2010
Date
Approved by
(UMobile)
RPO3 Date
NIC Date
Transmission Date
Approved by
(CLIENT
OPERATOR)
(MAXIS / CELCOM / DIGI ) Date