SITE DESIGN PACKAGE

FOR IBC SHARING SITE

SITE NAME : Bangsar Shopping Complex


SITE ID : BSCE
CLIENT OPERATOR : Maxis
Prepared by : Stanely Yap
Contact No : 017-3006489
Date : 14 DECEMBER 2010
Company : R&A Telecommunication Sdn Bhd
Introduction

A survey was carried out in Maxis Cabin room at Bangsar Shopping Complex by U
Mobile technical team for the purpose of In-Building antenna system sharing, under
Access Agreement for deployment of our 3G services. This TP is submitted for MAXIS
evaluation.

Objective

To seek Maxis approval, on IBC sharing for the deployment of 3G service inside
Bangsar Shopping Complex.

Scope

1. To provide RF component combining circuit and losses.


2. To provide infra sharing specifications for node B and transmission links.
3. To provide specification on CME and facility for node B and transmission
requirement.

TABLE OF CONTENT

1. Site Information

2. Network Survey Data

3. Equipment Location

4. Distributed Antenna System

5. Site Approval

6. Attachment

7. Bill of Quantity
1) SITE INFORMATION
1.1 LOCATION MAP

1.2 GENERAL INFORMATION

Address Bangsar Shopping Complex


285 Jalan Maarof Bangsar, 59000 Federal Terriroty of
Kuala Lumpur
Contact person N/A

Contact no N/A
Type of building Shopping Mall

Building height (m) 30m

No of floors 6
No of blocks 1

No of carpark 4 Basement Carpark

Longitude -NA-

Latitude -NA-
2) NETWORK SURVEY DATA

Survey date 25 August 2010

2.1 SITE EQUIPMENT ROOM DETAILS

Type of site Sharing


Dimension L x W x H (mm) -

Equipment Location Outdoor

Concrete plinth Dim. -NA-

Floor materials NA
Wall materials NA

Air conditioning NO

Cable ladder -NA-


Lightning Protection Grounding busbar

Cable inlet Existing


AC Power Existing
Earthing Busbar Tap existing busbar
Condition OK

Fire protection Existing

Lighting condition Existing

Equipment room access 24 hours

Crane needed? YES


2.2 BASE STATION DATA

2.2.1 EXISTING EQUIPMENT INSIDE ROOM

Equipment Type
RBS 2206, Huawei

Sharing Operator Maxis

Total Power Consumption

2.2.2 UMobile 3G NODE B PROPOSED


Equipment Type
RBS3418
Configuration -NA-
Dimension (mm) H: 700mm D: 600mm W: 125mm
Power Consumption (VA) 120 – 240 VAC

TX Output Power (dBm) 30dBm

2.3 INBUILDING ANTENNA SYSTEM

No of Existing Sectors 1

Sector 1: 1

Sector 2: 1

Sector 3: 1

Antenna type / model Omni & Panel / Triband

Antenna Frequency Range Rx (Uplink) : 800Mhz to 2500Mhz

Tx (Downlink) : 800Mhz to 2500Mhz

No of existing antenna Omni : -NA-


Panel : -NA-
2.4 CME REQUIREMENT

2.4.1 POWER SUPPLY

Method Tap from existing ACDB

Required power supply Propose tap existing ACDB

2.4.2 EARTHING
Method Tapping from existing AC & DC busbar

Cable type 50mm steel wire

Earth chamber location -NA-

2.5 TRANSMISSION REQUIREMENT

TX Location Rooftop

Structure type & height (m) NA

Earth chamber location Tapping to existing busbar

Azimuth -NA-

Far End Site -NA-


3) EQUIPMENT LOCATION
3.1 PICTURES INSIDE MAXIS EQUIPMENT ROOM

Proposed RBS 3418 within Half Size


Eltek Cabninet sit beside existing
UMobile RBS 3106
3.2 POWER TAPPING SOURCES

Proposed 3C X 25mm PVC cable inside


GI conduit (15m)

Power tapped to existing UMobile Outdoor ACDB


3.3 GROUNDING
3.3.1 EQUIPMENT EARTHING

Proposed to use the existing grounding point


at I Beam

Grounding
3.3 TRANSMISSION
3.3.1 FAREND OPTION
Propose E1 sharing with existing UMobile outdoor site

Proposed E1 sharing with the existing


UMobile outdoor site using the cat5
cable

Transmission
4) DISTRIBUTED ANTENNA SYSTEM
4.1 EXISTING / PROPOSED COMBINING CIRCUIT
Existing Combining Circuit

Existing Combining Circuit


Proposed Air Cond tray

Proposed UMobile RRU inside Maxis cabin

Proposed one MCB inside Maxis ACDB for RRU power supply
Fiber Routing

Proposed fiber cable from RBS3418 to


RRU located at Maxis cabin (320m)

Proposed fiber cable from RBS3418 to


RRU located at Maxis cabin (320m)
Proposed PVC trunking for
Fibre cable routing

Proposed PVC trunking for Fibre cable routing


Proposed PVC trunking for
Fibre cable routing

Proposed PVC trunking for Fibre


cable routing
Proposed hacking for fibre cable routing from roof top
to level LG

Proposed hacking for fibre cable routing from roof top


to level LG
Cable routing on existing cable tray to Maxis rizer

Cable routing on existing cable tray to Maxis rizer


Proposed PVC trunking and hacking for fibre cable
routing from level LG to level B2

Fibre cable routing from level LG to level B2 and cable


routing on existing cable tray
Fibre cable routing on existing
cable tray

Fibre cable routing on existing


cable tray
Fibre cable routing on existing
cable tray

Fibre cable routing on existing


cable tray
Proposed hacking for Fibre cable routing
5) SITE APPROVAL

Prepared By
R&A Telecommunication Sdn Bhd
(contractor) 23.12.2010

Date

Approved by
(UMobile)
RPO3 Date

NIC Date

Transmission Date

Approved by
(CLIENT
OPERATOR)
(MAXIS / CELCOM / DIGI ) Date