Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Marine Department (LSA/MAR)

Spot Inspection CBg. Samudra Perkasa-1

MEV: CST/OFF

PERTAMINA HULU MAHAKAM

25/08/2018

Inspected by: Syamsul bahri YUSUF


1. Marine Inspection Introduction.

Please be informed that on 25 August 2018, a spot inspection/pre-mob inspection was conducted
onboard CBg. Samudra Perkasa-1 at TN-Ix404 accompanied by Barge Master and crew.

2. Findings and recommendation :


1) Found fire canon on top deck detach during test, to be repaired (P1)
2) Water leak at fifi pump line flange in engine room, to be repaired (P1)
3) FFA location not as per fire plan, to be synchronized (P2)
4) Poor housekeeping on main deck, to be cleaned up (P2)
5) Found several life jacket light on main deck (in box) were unlit, to be rectified (P2)
6) Bend on jumping rope frame on main deck. To be repaired (P2)
7) Bend on starboard side hand rail on main deck, to be repaired (P3)

3. Photo Findings:

Finding No.1 Finding No.2

Finding No.4
Finding No.3

1
Marine Inspection Report – 25/08/2018
Finding No.5 Finding No.6

Finding No.7

--- End of Report ---