Bucket Rev 3 (13-03-2021)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TIMOR-1 CFSPP PROJECT

SUPPORTING DOKUMEN

ISSUED BY

PT. KOMOTECH INDONESIA ENC

Doc No.: 003.SD/ENC-UBE/TIMOR1/III/2021


Ref No. 0

TITLE: CONCRETE BUCKET – PLTU TIMOR 1


(DRAWING ASSEMBLY SAND BUCKET)

DATE OF ISSUE: 12 MARCH 2021

3 2021-03-13 Issued for approval YS

2 2021-03-12 Issued for approval YS

1 2021-02-19 Issued for approval YS

0 2021-02-17 Issued for approval YS


REV DATE PURPOSE OF ISSUE Prepared Checked Approved Authorized

Approved by: Issued by:

Yulianus Sugiono
PT. Ulan Buana Engineering PT. Komotech Indonesia EnC
Date: Date: 13/03/2021
DWG NO.
B C D E F G H I J

7 7

6 6

REFERENCE DRAWING

5 5

4 ,
4
,

REVISION

TIMOR-1
COAL FIRED STEAM POWER PLANT
3 (2 x 50 MW) 3

PT. PLN ( PERSERO )


PLN
PT. PLN (PERSERO) PUSAT ENJINIRING KETENAGALISTRIKAN

THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF CONSORTIUM. THIS DRAWING OR THE MATERIAL DESCRIBED
THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN
THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED,IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY CONSORTIUM.

2 2

PP
OC Sumitomo
Heavy Industries, Ltd MEDCO ENERGI
Power

PT. Inti Karya Persada Tehnik - PT. PP (Persero) Tbk. - ITOCHU Corporation
Sumitomo Heavy Industries, Ltd. - PT. Medco Power Indonesia

N B U
A

N
U L

A
KSO ULAN BUANA

E N

G
N
G

I
I N
BMTECH E E R

KSO ULAN BUANA

ASSEMBLY
1 1
SAND BUCKET

BC-KMI-1001-00-13-03-21-01
SHT REV.
NTS A3 FOR APPROVAL 1 / 1 3
A B C D E F G H I J

You might also like