4 7 To Calculate cost Of this work Enter the Prices flowing:
,681
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715
715
st
Toral
38682 TK
0 TK
6450 TK
0 TK
0 TK
0 TK
0 TK
0 TK
165780 TK
210912 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715
715
nishing)
Toral
27000 TK
0 TK
3195 TK
0 TK
38250 TK
10950 TK
0 TK
0 TK
0 TK
79395 TK
715
st
Toral
15404 TK
0 TK
2567 TK
0 TK
0 TK
0 TK
0 TK
0 TK
66015 TK
83986 TK
715
nishing)
Toral
3465 TK
0 TK
290 TK
0 TK
3474 TK
14600 TK
0 TK
0 TK
0 TK
21829 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715
715
st
Toral
11508 TK
0 TK
1920 TK
0 TK
0 TK
0 TK
0 TK
0 TK
49302 TK
62730 TK
15
fnishing)
Toral
17800 TK
4760 TK
0 TK
28899 TK
0 TK
17794 TK
0 TK
70928 TK
0 TK
140181 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715
Total work area: 1300 Sq.ft.
Total approximate cost 1911635 TK
1911635 TK
t
Toral
226800 TK
44346 TK
30275 TK
18639 TK
266076 TK
7875 TK
62000 TK
124000 TK
226672 TK
161352 TK
1168035 TK
roximate)
214500
143000
114400
143000
28600
42900
57200
0
743600