Enter the Requried Value in "Blue Box" To Estimate"


Cement Sand
Enter the ratio of Morter Have to use = 1 4
Enter The total volume of Brick Work = 456.66 cft
Price of One Brick = 9 tk
Price of one bag Cement = 450 tk Total Cost Requried
Price of 1cft sand= 15 tk 62745

Total Bricks Need= 5479.92 Nos


Requirment Of Cement = 25.57 Bags
Requirment Of Sand = 127.9 cft
neering
h And N.J.

l Cost Requried
tk
This is the Poperty of School of civil Engineer
This Channel are Manageing By SM Hedaetullah And
Disha (B.Sc. In Civil Engineering)
Support us And stay connected
This file is only for edicational Perpose. Pls don't misuse it.

Enter the Requried Value in "Blue Box" To Estimate"


Cement Sand
Requred Ratio of Morter= 1 2

Enter The Total wet Volume Of RCC= 64 cft

Requirment Of Cement= 11.0 Bags


Requirment Of Sand= 27.4 cft
Requriment Of Khoa= 54.9 cft
Requirment of Bricks To Make the Khoa which is needed= 494 Nos

Steel Calculation From RCC


% of Steel= 1.00%
Steel Reqired= 142.4 Kg
civil Engineering
edaetullah And N.J.
neering)
ected
n't misuse it.

Khoa/Stone
4 7 To Calculate cost Of this work Enter the Prices flowing:

96 Prices of one bag Cement= BDT 450.00


Price of one cft (1cft) sand= BDT 15.00
Prices of One cft (1cft) khoa/stone= BDT 90.00
Price of one kg steel= BDT 73.00

Total Cost= BDT 20,681


Prices flowing:

,681
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Foundation/Footing total cost with 2.75" Brick


solling & 2.5" CC casting
Sr. No. Material List Quantity Aprx. Prices Toral
1 Cement 28 Bags 450 TK 12780 TK
Sand (coarse) 0 cft 57 TK 0 TK
2 Sand (Local) 107 cft 15 TK 1601 TK
3 Stone chips 0 cft 171 TK 0 TK
4 Brick chips 213 cft 90 TK 19197 TK
5 0 mm Bar 0.000 Tons 62000 TK 0 TK
Used Steel
6 0 mm Bar 0.000 Tons 62000 TK 0 TK
Bar
7 16 mm Bar 0.000 Tons 62000 TK 0 TK
11 Bricks 0 Nos 9 TK 0 TK
12
13 Total cost 33578 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Brcik Work/ Brick Wall Cost


Sr. No. Material List Quantity Aprx. Prices
1 Cement 86 Bags 450 TK
2 Sand (Coarse) 0 cft 57 TK
3 Sand (Local) 430 cft 15 TK
4 Stone chips (6mm) 0 cft 171 TK
5 Brick chips 0 cft 70 TK
6 10 mm Bar G-500 0.000 Tons 62000 TK
Used Steel
7 12 mm Bar 0.000 Tons 62000 TK
Bar
8 16 mm Bar 0.000 Tons 62000 TK
9 Bricks 18420 Nos 9 TK
10
11 Total cost
Ltd.
1 story Full cost)
palgonaj

715

st
Toral
38682 TK
0 TK
6450 TK
0 TK
0 TK
0 TK
0 TK
0 TK
165780 TK

210912 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Slabs total cost (Except tiles or fnishing)


Sr. No. Material List Quantity Aprx. Prices
1 Cement 60 Bags 450 TK
Sand (coarse) 0 cft 57 TK
2 Sand (Local) 213 cft 15 TK
3 Stone chips 0 cft 171 TK
4 Brick chips 425 cft 90 TK
5 10 mm Bar G-500 0.150 Tons 73000 TK
Used Steel
6 0 mm Bar 0.000 Tons 62000 TK
Bar
7 0 mm Bar 0.000 Tons 62000 TK
11 Bricks 0 Nos 9 TK
12
13 Total cost
Ltd.
1 story Full cost)
palgonaj

715

nishing)
Toral
27000 TK
0 TK
3195 TK
0 TK
38250 TK
10950 TK
0 TK
0 TK
0 TK

79395 TK

Requirment Of Cement= 49.44 Requirment Of Cement=


Requirment Of Sand= 185.4 Requirment Of Sand=
Requriment Of Khoa= 370.8 Requriment Of Khoa=
Requirment Of Cement= 10.97143
Requirment Of Sand= 27.42857
Requriment Of Khoa= 54.85714
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Brcik Work/ Brick Wall Cost


Sr. No. Material List Quantity Aprx. Prices
1 Cement 34 Bags 450 TK
2 Sand (Coarse) 0 cft 57 TK
3 Sand (Local) 171 cft 15 TK
4 Stone chips (6mm) 0 cft 171 TK
5 Brick chips 0 cft 70 TK
6 10 mm Bar G-500 0.000 Tons 62000 TK
Used Steel
7 12 mm Bar 0.000 Tons 62000 TK
Bar
8 16 mm Bar 0.000 Tons 62000 TK
9 Bricks 7335 Nos 9 TK
10
11 Total cost
Ltd.
1 story Full cost)
palgonaj

715

st
Toral
15404 TK
0 TK
2567 TK
0 TK
0 TK
0 TK
0 TK
0 TK
66015 TK

83986 TK

Total Bricks Need= 7335


Requirment Of Cement = 34.23
Requirment Of Sand = 171.15
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Beams total cost (Except tiles or fnishing)


Sr. No. Material List Quantity Aprx. Prices
1 Cement 8 Bags 450 TK
Sand (coarse) 0 cft 57 TK
2 Sand (local) 19 cft 15 TK
3 Stone chips 0 cft 171 TK
4 Brick chips 39 cft 90 TK
5 10 mm Bar G-460 0.200 Tons 73000 TK
Used Steel
6 0 mm Bar 0.000 Tons 62000 TK
Bar
7 16 mm Bar G-500 0.000 Tons 62000 TK
11 Bricks 0 Nos 9 TK
12
13 Total cost
Ltd.
1 story Full cost)
palgonaj

715

nishing)
Toral
3465 TK
0 TK
290 TK
0 TK
3474 TK
14600 TK
0 TK
0 TK
0 TK

21829 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Brcik Work/ Brick Wall Cost


Sr. No. Material List Quantity Aprx. Prices
1 Cement 26 Bags 450 TK
2 Sand (Coarse) 0 cft 57 TK
3 Sand (Local) 128 cft 15 TK
4 Stone chips (6mm) 0 cft 171 TK
5 Brick chips 0 cft 70 TK
6 10 mm Bar G-500 0.000 Tons 62000 TK
Used Steel
7 12 mm Bar 0.000 Tons 62000 TK
Bar
8 16 mm Bar 0.000 Tons 62000 TK
9 Bricks 5478 Nos 9 TK
10
11 Total cost
Ltd.
1 story Full cost)
palgonaj

715

st
Toral
11508 TK
0 TK
1920 TK
0 TK
0 TK
0 TK
0 TK
0 TK
49302 TK

62730 TK

Total Bricks Need= 5479.92


Requirment Of Cement = 25.57296
Requirment Of Sand = 127.8648
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Columns total cost (Except tiles or fnishing)


Sr. No. Material List Quantity Aprx. Prices
1 Cement 45 Bags 400 TK
Sand (Coarse) 84 cft 57 TK
2 Sand (Local) 0 cft 35 TK
3 Stone chips 169 cft 171 TK
4 Brick chips 0 cft 70 TK
5 10 mm Bar G-460 0.287 Tons 62000 TK
Used Steel
6 12 mm Bar 0.000 Tons 62000 TK
Bar
7 16 mm Bar 1.144 Tons 62000 TK
11 Bricks 0 Nos 9 TK
12
13 Total cost
td.
story Full cost)
algonaj

15

fnishing)
Toral
17800 TK
4760 TK
0 TK
28899 TK
0 TK
17794 TK
0 TK
70928 TK
0 TK

140181 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715
Total work area: 1300 Sq.ft.
Total approximate cost 1911635 TK

Full building Materils cost


Sr. No. Material List Quantity Aprx. Prices
1 Cement 567 Bags 400 TK
Sand (Coarse) 778 cft 57 TK
2 Sand (Local) 865 cft 35 TK
stone chips (6mm) 109 cft 171 TK
3 Stone chips 1556 cft 171 TK
4 Brick chips 113 cft 70 TK
5 10 mm Bar G-460 1.000 Tons 62000 TK
Used Steel
6 10 mm Bar G-500 2.000 Tons 62000 TK
Bar
7 16 mm Bar G-500 3.656 Tons 62000 TK
11 Bricks 17928 Nos 9 TK
12
13 Total cost

Other materials and worker cost (Aproximate)


14 Worker cost 15%
15 Doors and windows cost 10%
16 Electric work cost 8%
17 Plumbing work 10%
18 Movemnet cost 2%
19 Extra cost 3%
20 tiles 4%
21 0%
total
Ltd.
1 story Full cost)
palgonaj

cost per sq ft= 1100


8715

1911635 TK

t
Toral
226800 TK
44346 TK
30275 TK
18639 TK
266076 TK
7875 TK
62000 TK
124000 TK
226672 TK
161352 TK

1168035 TK

roximate)
214500
143000
114400
143000
28600
42900
57200
0
743600