Daqing Petroleum Iraq Branch HSE-MS record No.

22

JOB SAFETY ANALYSIS 工作安全分析

Rig: Well: Date:


Associated Permit No.:
工作许可号
Location/Area: Date Of Elaboration:
位置/区域

Work/Job/Project (Contract No. ) Crew:


合同号:
Brief Description (Work/Operation): NIPPLE UP THE BOP Estimated Time Hours
工作描述: 预计时间: 小时

N0. Activities Risk * Reason Of The Risk Prevention And Control Actions
序号 活动 风险 风险产生原因 预防和控制措施
1 Gather up all necessary tools and Pinch point Using unsafe or improper tools Know your job and tools. Inspect
equipment while the well head is cooling. for the job. tools.
(Know BOP Weight)
2 Designate hands for specific duties. injured Inexperienced hands working in Know your job.
critical situations.
3 Unlock and pull the bushings using the Well damage Bushings falling through the No work being performed on the rig
bushing puller. rotary table or removed floor floor with personnel working around
plates. the well head.
4 Inspect and rig up the pick-up line. falling The pick-up line breaking and Inspect the pick-up line and rig it up
the stack falling. without kinking it under a load.
5 Attach the pick-up line to the BOP stack Dropping Dropping the BOP stack. Know the approximate load and use
with load rated clevises. clevises that are rated for more than
the estimated load.
6 Driller will gently pick-up the stack into a Breaking the lines. Picking the Have competent driller paying close
Injury
vertical position with the blocks. stack up into the rotary table. attention to the flagger.
Daqing Petroleum Iraq Branch HSE-MS record No. 22

7 Set four off-set studs and nuts to hold the Burs and wickers on studs and Wear proper work gloves.
Leakage
stack and remove the BOP stabbing guide bolts.
hazard
and pick-up lines.
8 Make up ALL nuts on studs with hammer Smashed hands and fingers. Use pin catcher or rope to hold the
wrenches and hammers, alternating sides Smashed hammer wrenches. Use clean dry
until all are torque up. gloves when swinging a hammer.
9 Use forklift, straps, and tail rope to pick-up Drop/Crush. Fatality. Never stand or walk under suspended
Drop
and set flow line into place. Equipment damage. load. Use proper rigging.
10 Rig up the flow line to the bell nipple and Slip/Fall. Fatality. Smashed Use proper fall protection. Use
Slip
the shaker manifold. hands and fingers. correct tools for the job.
11 Hook up all of the hydraulic lines from the Overexertion. Smashed hands Use teamwork when handling hoses.
accumulator to the BOP stack, paying Smashed and fingers. Hydraulic oil spill. Use quick connects instead of hammer
attention to proper configuration. unions.
12 Rig up the 4" flow line from the HCR valve Smashed hands and fingers. Use proper tools for the job. Keep feet
to the choke manifold. Smashed Smashed feet. Overexertion. out from under the flow line. Use
lifting aids when possible.
Daqing Petroleum Iraq Branch HSE-MS record No. 22

(*) Risk Classification (See Reverse)风险分级见后面附件


Executor Personnel 执行人员
Name I.D. N0. Signature Client Contr. Name I.D. N0. Signature Client Contr.
姓名 卡号 签字 甲方 乙方 姓名 卡号 签字 甲方 乙方

Elaborated By: Drilling Supervisor. Rig Manager:

Name: Redha A. Hassan Name: Name:


Signature:____________ Signature: ____________ Signature: ____________