I. Calculation:
1. Standard value:
a. For void ratio e, moisture content w and bulk density ϒ
n
A i
Atc Aave i 1
n
With Ai is the specific value of characteristic from a separate experiment.
n is the number of tests
b. For cohesion C and friction angle φ:
1 n n n n
ctc i i
i 1 i 1
2
i 1
i i i
i 1
1 n n n
tan tc n
i 1
i i
i 1
i i
i 1
2
n
n
With n i i
2
i 1 i 1
2. Fluctuating coefficient ν
Aave
1 n
With σ is the average deviation: Ai Aave for void ratio e, moisture
2
n 1 i 1
If then the sample is satisfied. Otherwise, data with large error must be
1 n
With σCM is the estimated deviation: CM Ai Aave if n < 25. If not, σCM =
2
n i 1
σ
[ν] is the statistical indicator, dependent on the number of test n
3. Calculated value:
a. For void ratio e and moisture content w:
Att Atc
kd
1
With kd is the safety coefficient of soil k d
1
II. RESULT:
1. Report 1A:
A. Layer 1
i. Moisture content (W):
1 n
Ai Aave =√2−1
1
●
2
× 4,351 = 2,086
n 1 i 1
𝜎 2,086
●𝑣= = = 0,091 < [𝑣 ] = 0,15 taken from QPXD 45-78
𝑊𝑎𝑣𝑔 23,035
1 n
Ai Aave =√2−1
1
●
2
× 0,005 = 0,071
n 1 i 1
𝜎 0,071
●𝑣= = = 0,101
𝑒𝑎𝑣𝑔 0,7
1 n
Ai Aave =√2−1
1
●
2
× 0,08 = 0,283
n 1 i 1
𝜎 0,283
●𝑣= = = 0,014 < [𝑣 ] = 0,05
γ𝑎𝑣𝑔 19,6
According to QPXD 45-78, the maximum coefficient of bulk density, [v] = 0.05
=> Sample set selected
Standard value:
● γtc = γavg = 19,6 (kN/m3)
iv. Cohesion (c) and internal friction angle ():
Layer 1
200
τ kN/m2
100
y = 0.2139x + 25.525
0 R² = 0.9767
0 50 100 150 200 250 300 350 400 450
σ kN/m2
According to QPXD 45-78, the maximum coefficient of cohesion and internal friction
angle, [v] = 0.15
=> Sample set selected
Standard value:
● 𝑡𝑎𝑛𝜑𝑡𝑐 = 0,214 => 𝜑𝑡𝑐 = 12o 04′
● 𝑐 𝑡𝑐 = 25,525 kN/m2
Calculated value for limit state I:
For the limit state I: a =0,95 (n-2 = 6) ta = 1,94
Internal friction I:
● tg = 𝑡ɑ × 𝑣𝑡𝑔 = 1,94 × 0,079 = 0,153
B. Layer 2
i. Moisture content (W):
1 n
Ai Aave =√7−1
1
●
2
× 18,102 = 1,737
n 1 i 1
𝜎 1,737
●𝑣= = = 0,084 < [𝑣 ] = 0,15
𝑊𝑎𝑣𝑔 20,79
1 n
● CM Ai Aave = √17 × 18,102 = 1,608
2
(n < 25)
n i 1
1 n
Ai Aave =√7−1
1
●
2
× 0,013 = 0,047
n 1 i 1
𝜎 0,047
●𝑣= = = 0,074
𝑒𝑎𝑣𝑔 0,639
1 n
● CM Ai Aave = √17 × 0,013 = 0,043
2
(n < 25)
n i 1
1 n
Ai Aave =√7−1
1
●
2
× 0,514 = 0,293
n 1 i 1
𝜎 0,293
●𝑣= = = 0,015 < [𝑣 ] = 0,05
γ𝑎𝑣𝑔 19,93
1 n
● CM Ai Aave = √17 × 0,514 = 0,271
2
(n < 25)
n i 1
200
Layer 2
τ (kN/m2)
y = 0.2386x + 23.621
0 R² = 0.9391
0 50 100 150 200 250 300 350 400
σ (kN/m2)
𝜎𝑡𝑎𝑛𝜑 0,013
● 𝑣𝑡𝑔𝜑 = = = 0,054 ≤ [v] = 0,3
𝑡𝑎𝑛𝜑 𝑡𝑐 0,239
𝜎𝑐 3,532
● 𝑣𝑐 = = = 0,1495 ≤ [v] = 0,3
𝑐 𝑡𝑐 23,621
According to QPXD 45-78, the maximum coefficient of cohesion and internal friction
angle, [v] = 0.3
=> Sample set selected
Standard value:
● 𝑡𝑎𝑛𝜑𝑡𝑐 = 0,239 => 𝜑𝑡𝑐 = 13o 26′
● 𝑐 𝑡𝑐 = 23,621 kN/m2
Calculated value for the first limit state:
For the limit state I: a =0.95 (n-2 = 26) ta = 1.71
Internal friction I:
● tg = 𝑡ɑ × 𝑣𝑡𝑔 = 1,71 × 0,054 = 0,092
C. Layer 3
i. Moisture content (W):
1 n
Ai Aave =√16−1
1
●
2
× 60,755 = 2,013
n 1 i 1
𝜎 2,013
●𝑣= = = 0,105 < [𝑣 ] = 0,15
𝑊𝑎𝑣𝑔 19,22
1 n
● CM Ai Aave = √161 × 60,755 = 1,949
2
(n < 25)
n i 1
According to QPXD 45-78, the maximum coefficient of moisture content, [v] = 0.15
=> Sample set selected
1 n
Ai Aave =√16−1
1
●
2
× 0,048 = 0,055
n 1 i 1
𝜎 0,055
●𝑣= = = 0,097
𝑒𝑎𝑣𝑔 0,569
1 n
● CM Ai Aave = √161 × 0,048 = 0,0547
2
(n < 25)
n i 1
1 n
Ai Aave =√16−1
1
●
2
× 2,240 = 0,386
n 1 i 1
𝜎 0,386
●𝑣= = = 0,019 < [𝑣 ] = 0,05
γ𝑎𝑣𝑔 20,25
1 n
● CM Ai Aave = √161 × 2,240 = 0,374
2
(n < 25)
n i 1
Standard value:
● γtc = γavg = 20,25 (kN/m3)
Calculated value for the first limit state:
For the first limit state: a =0.95 (n-1 = 15) ta = 1.75
t 1,75×0,019
● = = 0,008
n √16
Layer 3
300
τ (kN/m2)
According to QPXD 45-78, the maximum coefficient of cohesion and internal friction
angle, [v] = 0.3
=> Sample set selected
Standard value:
● 𝑡𝑎𝑛𝜑𝑡𝑐 = 0,478 => 𝜑𝑡𝑐 = 25o 32′
● 𝑐 𝑡𝑐 = 9,569 kN/m2
Calculated value for the first limit state:
For the limit state I: a =0.95 (n-2 = 62) ta = 1.67
Internal friction I:
● tg = 𝑡ɑ × 𝑣𝑡𝑔 = 1,67 × 0,013 = 0,022
D. Layer 4
i. Moisture content (W):
𝑊𝑡𝑜𝑡𝑎𝑙 91,2
● 𝑊𝑎𝑣𝑔 = = = 18,24 %
𝑛 5
1 n
Ai Aave =√5−1
1
●
2
× 3,721 = 0,863
n 1 i 1
𝜎 0,863
●𝑣= = = 0,047 < [𝑣 ] = 0,15 taken from QPXD 45-78
𝑊𝑎𝑣𝑔 18,24
1 n
Ai Aave =√5−1
1
●
2
× 0,0026 = 0,025
n 1 i 1
𝜎 0,025
●𝑣= = = 0,038
𝑒𝑎𝑣𝑔 0,65
1 n
Ai Aave =√5−1
1
●
2
× 0,428 = 0,327
n 1 i 1
𝜎 0,327
●𝑣= = = 0,017 < [𝑣 ] = 0,05
γ𝑎𝑣𝑔 18,98
According to QPXD 45-78, the maximum coefficient of bulk density, [v] = 0.15
=> Sample set selected
Standard value:
● γtc = γavg = 18,98 (kN/m3)
Calculated value for the first limit state:
For the first limit state: a =0.95 (n-1 = 4) ta = 2.13
t 2,13×0,017
● = = 0,016
n √5
500
Layer 4
τ (kN/m2)
y = 0.4776x + 9.5688
R² = 0.9908
0
0 50 100 150 200 250 300 350 400
σ (kN/m2)
According to QPXD 45-78, the maximum coefficient of cohesion and internal friction
angle, [v] = 0.3
=> Sample set selected
Standard value:
● 𝑡𝑎𝑛𝜑𝑡𝑐 = 0,5504 => 𝜑𝑡𝑐 = 28o 49′
● 𝑐 𝑡𝑐 = 2,92 kN/m2
Calculated value for the first limit state:
For the limit state I: a =0.95 (n-2 = 18) ta = 1.73
Internal friction I:
● tg = 𝑡ɑ × 𝑣𝑡𝑔 = 1,73 × 0,025 = 0,043
I. Input data:
1. Plan view diagram:
E
1 2 3 4 5 6 7 8 8
STRUCTURE PLAN
SCALE 1/200
La 4 5 6 4 La
A B C D E
3. Standard values:
4. Calculated values:
(2.8 m - 11.7m)
- Layer 3 sat 20.486kN / m3
(11.7 m - 25.3 m)
- Layer 4 sat 19.88kN / m3
(25.3 m – 30.0 m)
1 1 1 1
hs Lmax 6 0.6 1
10 6 10 6
% Choose hs = 0.7 m
Choose La = 1.0 m
430 9.5 506 5.5 506 0.5 455 5.5 405 9.5
771 kNm
C 4.29925
With
1 d1 ( 2 10) d 2 19.6 1.2 (20.242 10) 0.8
' II 15.8568kN / m3
d1 d 2 1.2 0.8
II sat w 20.242 10 10.242kN / m3
1 1
RII 0.20585 1 (20.242 10) 1.83857 2 15.8568 4.29925 20.292
1
147.6564kN / m2
󠄃 Try b = 1.5 m
- Check bearing capacity of the ground:
bl AI b I BI h I ' DI cI
With:
Mx
b b 2eb b 2 b 1.5(m)
N
M 692
l l 2el l 2 y 21 2 20.399(m)
N 2302
l
Effective dimension ratio: n 13.599
b
n 1 0.25 n 1.018
Strip dimension ratio coefficient: nq 1 1.5 n 1.110
nc 1 0.3 / n 1.022
Therefore,
I I ' 10.242kN/ m3
pmax
tc
1.2 RII
pmin 0
tc
p tc R
ave II
With
N tt
tc
1.15 1 6eb 6el h 2302 /1.15 1 6 692 22 2 95.754 (kN/m2)
p ave
21 2.0 21 2302
max
F b l
N tt
tc
1.15 1 6eb 6el h 2302 /1.15 1 6 692 22 2 87.567 (kN/m2)
p ave
21 2.0 21 2302
min
F b l
P tc max P tc min
P tc ave 91.660 ( kN/m2)
2
RII 127.01kN / m2
Therefore,
pmax
tc
95.754 1.2 RII 152.412
tc
pmin 87.567 0
p tc 91.660 R 127.01
ave II
Df
hs = 700
Therefore, try bs 40cm 0.4m
hb
󠄃 Calculation the height of flange, hf
hf
b = 1500
Taken: hf = 200 mm = 0.2 m
󠄃 Condition
Pxt Pcx
N 6 M y
tt
N tt 6eb 6el
tt
p tt
1 1
b l l N tt
max
F b l
2302 6 692
pmax
tt
1 79.356kN / m
2
N tc
With γ* is calculated by: psettement ( avg * ) D f
F
1 19.6kN / m3 d1
GWL
Df
2 20.242kN / md32
hs = 700
b = 1500
Therefore, N tt
psettlement 1.15 ( * ) D
l b
avg f
2302
psettlement 1.15 (22 15.8568) 2 59.947 kN / m 2
21 2
b) Calculation of settlement, S:
e1i e2i
s si hi
1 e1i
+ Divide the soil layer below footing into many elements with: hi = 0.8 m
p1i iavg
self i Z i e1i
+ Layer 1: (Depth: 0÷2.8m) Choose sample BH 1-1 with the depth from 1.8m to
2.0m for calculation of settlement from 2m to 2.8m
P
0 25 50 100 200 400 800
(kN/m2)
e 0.650 0.637 0.625 0.603 0.571 0.534 0.503
p-e Relationship
0.700
0.650
y = -5E-10x3 + 8E-07x2 - 0.0005x + 0.6498
0.600
0.550
0.500
0.450
0 100 200 300 400 500 600 700 800 900
+ Layer 2: (Depth: 2.8÷11.7m) Choose BH 1-5 with the depth from 9.8m to 10.0m
for calculation of settlement from 2.8m to 11.7m
P
0 25 50 100 200 400 800
(kN/m2)
e 0.646 0.632 0.620 0.598 0.568 0.540 0.503
p-e Relationship
0.700
0.600
0.550
0.500
0.450
0 100 200 300 400 500 600 700 800 900
+Layer 3: (Depth: 11.7÷25.3m) Choose BH 1.8 with the depth from 15.8m to
16.0m for calculation of settlement from 11.7m to 25.3m
P
0 25 50 100 200 400 800
(kN/m2)
e 0.583 0.577 0.571 0.561 0.547 0.532 0.524
p-e Relationship
0.590
0.580
0.560
0.550
0.540
0.530
0.520
0 100 200 300 400 500 600 700 800 900
+Layer 4: (Depth: 25.3÷30.0m) Choose BH 1-14 with the depth from 27.8m to
28.0m for calculation of settlement from 25.3m to 30.0m
P
0 25 50 100 200 400 800
(kN/m2)
e 0.660 0.653 0.647 0.636 0.623 0.614 0.606
p-e Relationship
0.670
0.660
y = -4E-10x3 + 6E-07x2 - 0.0003x + 0.6595
0.650
0.640
0.630
0.620
0.610
0.600
0 100 200 300 400 500 600 700 800 900
2 5 5.2 64.800 3.2 10.500 1.6 0.373 22.366 20.271 19.714 20.372 68.949 89.220 0.611 0.603 0.004204
6 6 73.098 4 10.500 2 0.303 18.176 16.710 19.714 20.372 77.246 93.957 0.607 0.601 0.003379
7 6.8 81.395 4.8 10.500 2.4 0.254 15.244 19.714 20.372
7
7
self
z 15.244
81.395
󠄃 Total settlement:
=> Stop calculation
5.339 5
󠄃 It can be seen that at the 7th element,
Column Displacements
U3
Column
(m)
A -0.029805
B -0.022897
C -0.017853
D -0.019647
E -0.026818
S1 S 2
0.002
a
Where: S1, S2 are the settlement of column 1 and 2
a: is the distance between two columns
Therefore,
S A SB 0.029805 (0.022897)
0.001727 0.002
LAB 4
S B SC 0.022897 (0.017853)
0.001009 0.002
LBC 5
SC S D 0.017853 (0.019647)
0.000299 0.002
LCD 6
SD SE 0.019647 (0.02618)
0.001793 0.002
LDE 4
At middle elements: K 2 Cz b a
b bs b bs
M I I pmax
tt
1m
2 4
1
M I I 79.356 1m 1.5 0,3 14.28 kNm/m
2
8
󠄃 Area of steel bars:
M I I 14.28 106
Fa 179.49 mm2/m
0.9 Ra hb 0 0.9 260 340
1000
▪ Spacing: a 500mm
2
Therefore, choose ∅12𝑎200
2. Longitudinal direction: (𝛾𝑏 = 0.9 TCVN 5574:2018-6.1.2.3)
󠄃 Maximum moment:
From the moment diagram from SAP2000, the maximum positive moment occurs at
Section 6-6 and the maximum negative moment occurs at Section 5-5 (column C).
* Determine the neutral axis location:
M f b Rbbh f (d assume 0.5h f )
M f 0.9 11.5 1500 200 (640 0.5 200)
M f 1676.7(kNm)
3
5
4 4
a) Calculation the first type of steel bars (steel bars number 1):
- Using the positive moment to calculate these steel bars.
- Using T-shape with big rectangular model for calculation because the neutral axis
is in the flange and dimension of big rectangular are h x bs (700 x 1500) mm.
- The maximum positive moment at Section 6-6 with Mmax = 277.494 kNm
- Calculating 𝛼𝑚 and
M 277.494 106
m 0.044
b Rbbd assume 2 0.9 11.5 1500 6402
1 1 2 m 1 1 2 0.044 0.045
F si 2 F 25 2 F 25
d pro
2 491 700 40 10 25
2
2 491 700 40 10 25 30 25
2 610mm
2 491 2 491
- Check moment capacity:
Rs As , pro 260 1963
0.0539
b Rbbd pro 0.9 11.5 1500 610
Therefore,
M rd m b Rbbd pro
2
0.0524 0.9 11.5 1500 6102 106 302.943kNm
M rd M 302.943 277.494
M 100 8.4% : Satisfied
M rd 302.943
Provide
As
Section
M
m % Number As
( ) (mm2) 1(mm) 2(mm) % ( ) (%)
of bar ( ) s (mm) (mm2)
Sec 2-2 150.90 0.024 0.024 918 0.478 4 22 14 625 156 1068 0.569 171.110 11.81
Sec 4-4 181.70 0.029 0.029 1108 0.577 4 22 16 622 156 1162 0.623 184.994 1.78
Sec 6-6 277.49 0.044 0.045 1706 0.888 4 25 25 610 150 1963 1.073 302.943 8.40
Sec 8-8 156.94 0.025 0.025 955 0.497 2 25 0 638 150 982 0.513 160.667 2.32
b) Calculation the second type of steel bars (steel bars number 2):
- Using the negative moment to calculate these steel bars.
- Using T-shape with small rectangular model for calculation because the neutral
axis is in the flange and dimension of big rectangular are h x bs (700 x 300) mm.
- Calculation method is the same with method for calculation of steel bar number 1
Provide
Section
M m As % Number s (mm) As (%)
( ) (mm2) (mm) 2 (mm) % ( )
of bar 1 ( ) in web (mm2)
Sec 1-1 116.81 0.092 0.097 738 0.384 4 20 12 640 160 854 0.445 135.849 14.01
Sec 3-3 133.15 0.105 0.111 847 0.441 4 20 12 640 160 854 0.445 135.849 1.99
Sec 5-5 150.24 0.118 0.126 964 0.502 4 20 16 640 160 1030 0.536 161.848 7.17
Sec 7-7 69.38 0.055 0.056 429 0.223 2 18 0 641 164 509 0.265 83.036 16.45
Sec 9-9 113.53 0.089 0.094 716 0.373 4 18 12 641 164 735 0.382 118.074 3.85
c) Calculation the thirst type of steel bars (stirrup bars number 3):
- The maximum shear force in the beam of footing: Qmax=268.575 kN (section 1-1)
- Check the calculated condition of compressive resistance of reinforced concrete:
Q 268.575kN b3 b Rbbd pro 0.3 0.9 11.5 300 640 596,160kN Satisfied
(𝜑𝑏3 : The effected coefficient of stressed characteristic of concrete, taken by 0.3)
Q Qb Qsw 0.75qswC
C
2 b Rbt bd pro
2
2 0.9 0.9 300 6402
C 777.032
qsw 329.7
Q 0.75qswC2
C1
1.5 0.9 0.9 300 6402
Q 0.75 329.7 777.032
777.032
Q 384.281kN
25 & 25 22 & 22 25 & 22 20 & 20 20 & 18 18 & 18
Llap
1083 953 1083 650 650 585
(mm)
Choose L
1100 960 1100 650 600 590
(mm)
Table of result
I. Input data:
1. Diagram of columns:
a. Calculated values:
b. Standard values:
3. Materials
0 2.2 20 - - - - - -
1 7.9 14.9 2.63 2.16 15.2 6 2.4 0.3
2 2.9 19.4 2.68 0.756 19.6 15.9 16.55 0.29
4 7.5 19.25 2.7 0.686 20.1 12 24.86 0.086
5 2 19.8 2.68 0.578 20.6 0 0 0
6 13.4 19.3 2.67 0.631 20.2 6.7 26.1 0.046
7 5.1 19.2 2.68 0.794 19.4 17.9 17.08 0.176
8a 2.9 19.5 2.68 0.732 19.7 17.8 16.95 0.15
8 7.9 20.2 2.71 0.595 20.7 36.6 20.83 0.198
9 2.2 19.6 2.69 0.663 20.2 13.1 22.2 0.096
10 24.5 19.6 2.66 0.59 20.4 6.3 26.07 0.04
11 1.5 19.6 2.66 0.557 20.7 2.4 29.05 0
0.0
GWL
Layer 0
𝛾𝑠𝑎𝑡 = 15.2𝑘𝑁/𝑚3
Layer 1 C = 6 kN/m2
𝜑 = 2.4𝑜
𝛾𝑠𝑎𝑡 = 19.6𝑘𝑁/𝑚3
𝛾𝑠𝑎𝑡 = 20.1𝑘𝑁/𝑚3
Layer 4
C = 12 kN/m2
𝜑 = 24.86𝑜
𝛾𝑠𝑎𝑡 = 20.6𝑘𝑁/𝑚3
Layer 5 C = 0 kN/m2
𝜑 = 0𝑜
𝛾𝑠𝑎𝑡 = 20.2𝑘𝑁/𝑚3
Layer 6
C = 6.7 kN/m2
𝜑 = 26.1𝑜
𝜑 2×𝐻
𝐷𝑐𝑎𝑝,𝑚𝑖𝑛 = 0.7 tan (45 − ) × √
2 𝛾𝑏
In which
𝜑: internal friction angle
𝛾: Bulk density
𝐻 = 𝐻 𝑡𝑡 = 315 𝑘𝑁
b: the width of pile’s cap
Therefore, the value of limited of embedded depth, 𝐷𝑓,𝑚𝑖𝑛
2.4𝑜 2 × 315
→ 𝐷𝑐𝑎𝑝,𝑚𝑖𝑛 = 0.7 × tan (45 − )×√ = 2.76 𝑚
2 14.9 × 2.5
In which,
𝑅𝑏 = 17 𝑀𝑃𝑎
𝑅𝑠𝑐 = 260 𝑀𝑃𝑎
𝐴𝑠𝑐 = 1608.8 𝑚𝑚2
𝐴𝑏 = 𝐴𝑏1 − 𝐴𝑠𝑐 = 122500 − 1608.8 = 120891.2 𝑚𝑚2
′ ′
𝛾𝑐𝑏 , 𝛾𝑐𝑏 is the factor determined y national standard (𝛾𝑐𝑏 = 𝛾𝑐𝑏 = 1 for precast pile)
𝜑 is buckling factor determined by the slimness of pile
𝜑 = 1.028 − 0.0000288𝜆2 − 0.0016𝜆 For (28 ≤ 𝜆 ≤ 120)
𝜑=1 For (λ≤ 28)
𝐿𝑡𝑡
𝜆= 𝑟 = √𝐼⁄𝐴: inertia radius of pile’s cross section (m)
𝑟
𝑏4 0.354
𝐼= = = 1.251 × 10−3 𝑚4
12 12
𝐴 = 𝐴𝑏1 = 0.1225 𝑚2
1.251×10−3
→𝑟=√ = 0.101 𝑚
0.1225
In which,
𝑙𝑑𝑐 : length of a pile segment = 9 m
Therefore, the values of λ for installation process is:
𝐿𝑡𝑡 𝑙𝑑𝑐 9
𝜆= = = = 89.11
𝑟 𝑟 0.101
Belong to case 1: (28 ≤ 𝜆 ≤ 120)
In which,
𝑙1 : spacing between the pile cap and the fixed position
2
𝑙1 =
𝛼𝜀
𝛼𝜀 : factor of deformation
5 𝑘𝑏𝑝
𝛼𝜀 = √
𝛾𝑐 𝐸𝐼
- Layer 4 with IL = 0.09 and the length of pile in this layer t = 7.5 m (cat deo)
- Layer 5 with IL = 0.0 and the length of pile in this layer t = 2.0 m (cat tho)
- Layer 6 with IL = 0.05 and the length of pile in this layer t = 6.9 m (cat deo)
Therefore, the factor k determined by:
2 2
→ 𝑙1 = = = 2.55 𝑚
𝛼𝜀 0.783
→ 𝐿𝑡𝑡 = 0.5𝑙1 = 0.5 × 2.55 = 1.275 𝑚
Therefore, the value of λ:
𝐿𝑡𝑡 1.275
𝜆= = = 12.62
𝑟 0.101
Belong to case 2: (𝜆 ≤ 28)
→𝜑=1
′
→ 𝑃𝑉𝐿,2 == 𝜑(𝛾𝑐𝑏 × 𝛾𝑐𝑏 × 𝑅𝑏 × 𝐴𝑏 + 𝑅𝑠𝑐 × 𝐴𝑠𝑡 )
= 1 × (17 × 121243.4 + 260 × 1256.6) = 2387.85 𝑘𝑁
𝑃𝑉𝐿 = min(𝑃𝑉𝐿,1 ; 𝑃𝑉𝐿,2 ) = min(1611.8; 2387.85) = 1611.8 𝑘𝑁
In which,
𝑄𝑆 = ultimate skin friction
𝑄𝑃 = end bearing resistance
𝑊 = self-weight of the pile
𝐹𝑆𝑆 = 1.5 ~ 2 𝑎𝑛𝑑 𝐹𝑆𝑃 = 2 ~ 3
a. Ultimate skin friction 𝑸𝒔
The piles penetrate into the soil layers with corresponding order:
Su fs,I
z ϒ σ'v Cu As,I Qs,I
Layer t ϕu (kN/m2 au (kN/m
(m) (kN/m3) (kN/m2) (kN/m2) 2 (m 2
) (kN)
) )
2.625 45.65 8.7 0.62 9.16 1.0 9.16 7.35 67.31
1 7.7 15.2
5.25 59.3 8.7 0.62 9.31 1.0 9.31 3.71 34.52
2 2.9 9.35 19.6 87 25.46 4.13 31.74 0.9 28.68 4.06 116.46
13.425 127.43 53.1 0 53.13 0.6 31.78 7.35 233.58
4 7.5 20.1
16.05 153.945 53.1 0 53.13 0.6 31.78 3.15 100.11
5 2 19.3 20.6 187.27 62.5 0 62.50 0.5 29.02 2.8 81.25
22.925 224.645 96.4 0 96.43 0.5 48.21 7.35 354.38
6 6.9 20.2
25.55 251.42 96.4 0 96.43 0.5 48.21 2.31 111.38
Total Qs (kN) 1099
In which,
𝑞𝑝 = 𝑞𝑢 = 𝑐𝑁𝑐′ + 𝑞𝑁𝑞′
Therefore,
𝑄𝑝 = 𝐴𝑝 (𝑐𝑁𝑐′ + 𝑞𝑁𝑞′ )
Because the pile tip lie on layer 6 with 𝜑 = 26.1𝑜 , c = 6.7 kN/m2 and checking
figure 3.32 in the book “Nền móng” of Prof. Châu Ngọc Ẩn. The result of 𝑁𝑐′ and
𝑁𝑞′ are showed in below:
𝑁𝑐′ = 33.68
𝑁𝑞′ = 16.84
𝑞 = 𝜎𝑧′ = 15 × 1 + 1.2 × (15 − 10) + 7.9 × (14.9 − 10) + 2.9 × (19.4 − 10)
+ 7.5 × (19.3 − 10) + 2 × (19.8 − 10) + 6.9 × (19.3 − 10)
= 240.49 𝑘𝑁/𝑚2
𝜋 × 0.0162
𝐴𝑝 = 0.35 × 0.35 − 8 × = 0.121 𝑚2
4
→ 𝑄𝑝 = 𝐴𝑝 (𝑐𝑁𝑐′ + 𝑞𝑁𝑞′ ) = 0.121(6.7 × 33.68 + 240.49 × 16.84) = 517.34 𝑘𝑁
∑ 𝑁 𝑡𝑡 𝑁 𝑡𝑡 + 𝑊𝑑
𝑛=𝛽 =𝛽
𝑄 𝑄
In which.
𝛽 = 1.2 ~ 1.6
3516
→ 𝑛 = 1.6 × = 8.35
673.44
Choose n = 9
- Preliminary cross-section for column above:
𝑁 𝑡𝑡 3102 × 103
𝐴𝑐𝑜𝑙𝑢𝑚𝑛 = = = 269739 𝑚𝑚2
𝑅𝑏 11.5
Choose section 550x550 with 𝐴𝑐 = 302500 𝑚𝑚2
2. Arrangement
400
1 4 7
1100
550
X
3000
550
2 5 8
1100
3 6 9
400
s 1.1
Where,
n1 = number of row
n2 = number of piles in 1 row
b. Check bearing resistance of pile group
𝑄nc =Q × 𝑛1 × 𝑛2 ×η=673.44×3×3×0.74=4485.11 kN
Pi(x,y) =
N tt M x
±
tt
yi ±
M tty
x i (kN)
n c yi2 x i2
N tt M y
tt
f tb =
φ l
i i
l i
Therefore,
= 6.25 𝑚
tc
min 0
Where
max,min
N tc
qu
tc
M xtc M y
Fqu Wx Wy
tb
N tc
qu
Fqu
RII
m1m2
ktc
Abqu B v' DcII
D 6.9
Therefore, the result:
1×1
𝑅𝐼𝐼 = (0.84 × 6.25 × (20.2 − 10) + 4.37 × 268.25 + 6.9
1
× 6.7) = 1272.03 𝑘𝑁
Area of cross-section of soil:
tc
∑ 𝑁 tt +W𝑐 +W𝑑
∑ 𝑁qu =
𝑛
3516+1796.88+8928.57
= =12383(kN)
1.15
For moment:
tc
∑ 𝑀tt 609.5
∑ 𝑀qu = = = 530 (kN)
𝑛 1.15
Determination bearing capacity below pile tip:
6.253
𝑊qu = =40.69 (𝑚3 )
6
𝑡𝑐 𝑡𝑐
𝑡𝑐
∑𝑁𝑞𝑢 ∑𝑀𝑞𝑢 12383 641
𝜎𝑚𝑎𝑥 = + = 2
+ = 332.76 (kN/m2 )
𝐹𝑞𝑢 𝑊𝑞𝑢 6.25 40.69
𝑡𝑐 𝑡𝑐
𝑡𝑐
∑𝑁𝑞𝑢 ∑𝑀𝑞𝑢 12383 641
𝜎𝑚𝑖𝑛 = − = − = 301.25 (kN/m2 )
𝐹𝑞𝑢 𝑊𝑞𝑢 6.252 40.69
𝑡𝑐
𝑡𝑐
∑𝑁𝑞𝑢 12383
𝜎𝑡𝑏 = = 2
= 317 (kN/m2 )
𝐹𝑞𝑢 6.25
Checking for condition
Psettlement tbtc tc hi
→ 𝑃𝑠𝑒𝑡𝑡𝑙𝑒𝑚𝑒𝑛𝑡 = 317 − 235.21 = 81.79 𝑘𝑁/𝑚2
- Divided thickness of sub soil layer h ' 0.4 0.6 Bqu 3.16 4.74(m)
zi is the vertical distance from the bottom of the footing to half of the
l z
thickness of the divided element i. K0 is dependent on the ratios and :
b b
Because we have square foundation so l/b = 1
The results of calculation are shown in the table
1 29.4 268.250 0 1.000 0 1 81.790 81.594 270.800 352.394 0.565 0.560 0.001694
2 29.9 273.35 0.5 1.000 0.080 0.995 81.397 80.514 275.900 356.4141 0.565 0.560 0.001672
3 30.4 278.450 1 1.000 0.160 0.974 79.631 77.962 281.000 358.9622 0.565 0.560 0.001619
6 4 30.9 283.550 1.5 1.000 0.24 0.933 76.294 73.873 286.100 359.973 0.564 0.560 0.001535
5 31.4 288.650 2 1.000 0.320 0.874 71.452 68.442 291.200 359.642 0.564 0.560 0.001422
6 31.9 293.750 2.5 1.000 0.400 0.800 65.432 62.193 296.300 358.493 0.564 0.560 0.001293
7 32.4 298.850 3 1.000 0.48 0.721 58.954 Total = 0.009
We can see that, the area of puching shear tower covers all the piles, it is not
necessary to check the punching shear of pile cap.
φb3 = 0.6
φn = 0
The shear force, Q:
Q = P7 + P8 + P9 = 487.78 × 3 = 1463.34 Kn
The structural model is console beam with fixed end at edge of column, the load
acting on beam is reaction forces of piles
400
1 4 I 7
1100
550
X
3000
550
2 5 8
1100
3 6 9
I
400
Y
Moment about I-I axis
M I-I = (Pi(net) ×ri )
In which,
Values of Pi,net are the net reaction forces of piles acting on piles cap
tt
N tt M y
Pnet xi
n xi2
ri is the lever arm from center of ith pile to the column edge
- Pile P7, P8, P9
- Area of reinforcement
M I I 823.58 106
As 3200 mm2
0.9 Rs h0 0.9 260 1100
- Rebars quantity
4 3200
n 20.8
142
Choose 2114
- Check spacing of rebars
b 3000
s 143 mm smin = 70mm < s < smax = 200 mm
n 21
→ 𝑆𝑎𝑡𝑖𝑠𝑓𝑖𝑒𝑑 𝑤𝑖𝑡ℎ 𝑐𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛.
b. Along Y- axis:
The structural model is console beam with fixed end at edge of column, the load
acting on beam is reaction forces of piles
400
1 4 7
1100
II II
X
3000
550
2 5 8
550
1100
3 6 9
400
In which,
Values of Pi,net are the net reaction forces of piles acting on piles cap
tt
N tt M y
Pnet xi
n xi2
ri is the lever arm from center of ith pile to the column edge
- Pile P1, P4, P7
- Area of reinforcement
M I I 784.65 106
As 3048 mm2
0.9 Rs h0 0.9 260 1100
- Rebars quantity
4 3048
n 19.8
142
Choose 2014
- Check spacing of rebars
b 3000
s 150 mm smin = 70mm < s < smax = 200 mm
n 20
→ 𝑆𝑎𝑡𝑖𝑠𝑓𝑖𝑒𝑑 𝑤𝑖𝑡ℎ 𝑐𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛.
7. Checking the pile’s transportation and installation
a. Transportation
2 2
q qL
Moment at mid span: M (0.5L) 2 0.2 L 9.30kNm
2 2
b. Installation
4.59 L2
Support reactions: FB 29.53 kN
2 0.7 L
FA 4.59 L FB 4.59 9 29.53 11.78 kN
Moment diagram:
d. Design hook
Applied load on hook: Pp ql 4.59 9 41.34 kN
Pp 41.34 106
Rebar area for hook: Fa ,hook FS 1.5 221 mm2
Ra 280000
1 1.621
MH A0 6.508 105 m/kN
Eb I
2
bd 0.783 3.25 107 1.25 103
2
1 1.751
MM A0 5.505 105 m/kN
Eb I
2
bd 0.783 3.25 10 1.25 10
5 3
H 0l02 Ml03
0
2 Eb I Eb I
L0 is the length of pile from pile cap bottom to ground surface. Because this case is low-
cap pile so l0 = 0
= y0 = 0.0063 m
= 0 = 3.8910-3 rad
The results of stresses, bending moment and shear forces are show in table below:
Calculated stress:
σzy
ze (m) z (m) A1 B1 C1 D1
(kN/m2)
0 0 1 0 0 0 0.000
0.1 0.13 1 0.1 0.005 0 8.640
0.2 0.27 1 0.2 0.02 0.001 15.859
0.3 0.4 1 0.3 0.045 0.005 21.735
0.4 0.53 1 0.4 0.08 0.011 26.333
0.5 0.67 1 0.5 0.125 0.021 29.748
0.6 0.8 0.999 0.6 0.018 0.036 30.328
0.7 0.93 0.999 0.7 0.245 0.057 33.376
0.8 1.07 0.997 0.799 0.32 0.085 33.786
0.9 1.2 0.995 0.899 0.405 0.121 33.390
1 1.33 0.992 0.997 0.499 0.167 32.446
1.1 1.47 0.987 1.095 0.604 0.222 30.840
1.2 1.6 0.979 1.192 0.718 0.288 28.645
1.3 1.73 0.969 1.287 0.841 0.365 26.150
1.4 1.87 0.955 1.379 0.974 0.456 23.458
1.5 2 0.937 1.468 1.115 0.56 20.594
1.6 2.13 0.913 1.533 1.264 0.678 19.883
1.7 2.27 0.882 1.633 1.421 0.812 14.364
1.8 2.4 0.848 1.706 1.584 0.961 12.044
1.9 2.53 0.795 1.77 1.752 1.126 8.230
2 2.67 0.735 1.823 1.924 1.308 5.305
2.2 2.93 0.575 1.887 2.272 1.72 0.002
2.4 3.2 0.347 1.874 2.609 2.105 -10.188
2.6 3.47 0.033 1.755 2.907 2.724 -8.194
2.8 3.73 -0.385 1.49 3.128 3.288 -10.715
3 4 -0.928 1.037 3.225 3.858 -12.979
3.5 4.67 -2.928 -1.272 2.463 4.98 -15.613
4 5.33 -5.853 -5.941 -0.927 4.548 -16.888
Bending moment:
Mz
ze (m) z (m) A3 B3 C3 D3
(kNm)
0 0 0 0 1 0 29.22
0.1 0.13 0 0 1 0.1 33.68999
0.2 0.27 -0.001 0 1 0.2 38.00306
0.3 0.4 -0.005 -0.001 1 0.3 41.96914
0.4 0.53 -0.011 -0.002 1 0.4 45.62139
0.5 0.67 -0.021 -0.005 0.999 0.5 48.86425
0.6 0.8 -0.036 -0.011 0.998 0.6 51.69376
0.7 0.93 -0.057 -0.02 0.996 0.699 53.87909
0.8 1.07 -0.085 -0.034 0.992 0.799 55.57099
0.9 1.2 -0.121 -0.055 0.985 0.897 56.69669
1 1.33 -0.167 -0.083 0.975 0.994 56.98708
1.1 1.47 -0.222 -0.122 0.96 1.09 57.03559
1.2 1.6 -0.287 -0.173 0.938 1.183 56.66119
1.3 1.73 -0.365 -0.238 0.907 1.273 55.58218
1.4 1.87 -0.455 -0.319 0.866 1.358 54.08435
1.5 2 -0.559 -0.42 0.881 1.437 54.23262
1.6 2.13 -0.676 -0.543 0.739 1.507 50.07345
1.7 2.27 -0.808 -0.691 0.646 1.566 47.59413
1.8 2.4 -0.956 -0.867 0.53 1.612 44.81573
1.9 2.53 -1.118 -1.074 0.385 1.64 42.02447
2 2.67 -1.295 -1.314 0.207 1.646 39.01523
2.2 2.93 -1.693 -1.906 -0.271 1.575 32.6764
2.4 3.2 -2.141 -2.663 -0.941 1.352 26.50416
2.6 3.47 -2.621 -3.6 -1.877 0.917 20.33476
2.8 3.73 -3.103 -4.718 -3.408 0.197 6.122829
3 4 -3.541 -6 -4.688 -0.891 9.992824
3.5 4.67 -3.919 -9.544 -10.34 -5.854 2.212139
4 5.33 -1.614 -11.73 -17.91 -15.07 1.238243
Shear force:
0 0 0 0 0 1 35
0.1 0.13 -0.005 0 0 1 34.38569
0.2 0.27 -0.02 -0.003 0 1 32.83341
0.3 0.4 -0.045 -0.009 -0.001 1 30.32029
0.4 0.53 -0.08 -0.021 -0.003 1 27.137
0.5 0.67 -0.125 -0.042 -0.008 0.999 23.49342
0.6 0.8 -0.18 -0.072 -0.016 0.997 19.38957
0.7 0.93 -0.245 -0.114 -0.03 0.994 15.04746
0.8 1.07 -0.32 -0.171 -0.051 0.989 10.69989
0.9 1.2 -0.404 -0.243 -0.082 0.98 6.331061
1 1.33 -0.499 -0.333 -0.125 0.967 1.940169
1.1 1.47 -0.603 -0.443 -0.183 0.946 -2.24193
1.2 1.6 -0.716 -0.575 -0.259 0.917 -6.0901
1.3 1.73 -0.838 -0.73 -0.356 0.876 -9.71609
1.4 1.87 -0.967 -0.91 -0.479 0.821 -12.8648
1.5 2 -1.105 -1.116 -0.63 0.747 -15.9058
1.6 2.13 -1.248 -1.35 -0.815 0.652 -18.3612
1.7 2.27 -1.396 -1.643 -1.036 0.529 -17.5182
1.8 2.4 -1.547 -1.906 -1.299 0.374 -22.0313
1.9 2.53 -1.699 -2.227 -1.608 0.181 -23.4303
2 2.67 -1.848 -2.578 -1.966 -0.057 -24.2502
2.2 2.93 -2.125 -3.36 -2.849 -0.692 -24.9447
2.4 3.2 -2.399 -4.228 -3.973 -1.592 -31.7272
2.6 3.47 -2.437 -5.14 -5.355 -2.821 -22.6689
2.8 3.73 -2.346 -6.023 -6.99 -4.445 -20.1846
3 4 -1.969 -6.765 -8.84 -6.52 -16.9268
3.5 4.67 1.074 -6.789 -13.69 -13.83 -7.54544
4 5.33 9.244 -0.358 -15.81 -23.14 -1.19489
Qb = 63 kN > Qmax = 34.39 kN, so concrete is capable to the shear resistance. The piles do
not require stirrups for shear
1m of pile head and pile tip are provided with 6a50, the following 1-meter
segments are provided with 6a100 and the others segment are provided with
6a200
Reinforcement rebar net: 6a50
Reinforcement bar at pile head: 25 with L = 900 mm
z [ z '] 1 2
4
cos
v' tan I cI
+ Based on the calculated results, the maximum horizontal stress of pile
+ Distance from surveyed position to ground surface z0 = 0.8 + 3 = 3.8 m, so the considered
point is in first soil layer
v ' 15 1 (15 10) 1.2 (15.2 10) 3.8 2.2 29.32 kN/m2
4
[ zy ] 12 v ' tan I cI 45.01 kN/m
cos I
9. Checking by SAP200
k. Z
Cz =
𝑐
Where,
k is ratio factor (kN/m4), depqnding on Table A1
z is the depth of cross section pile in soil.
𝛾𝑐 working condition (taken = 3)
- Ground coefficient:
a
K 1 = K n = Cz b
2
K 2 = K 3 = ⋯ = K n−1 = Cz ba
a – spacing between points (chosen a = 0.1 m)
Table of result:
Frame Station OutputCase CaseType V2 M3
Text m Text Text KN KN-m
6 0 DEAD LinStatic -22.825 56.6986
6 0.05 DEAD LinStatic -22.825 55.8398
6 0.1 DEAD LinStatic -22.825 56.9811
7 0 DEAD LinStatic -17.128 56.9811
7 0.05 DEAD LinStatic -17.128 56.8374
7 0.1 DEAD LinStatic -17.128 50.6938
8 0 DEAD LinStatic -11.903 50.6938
8 0.05 DEAD LinStatic -11.903 51.289
8 0.1 DEAD LinStatic -11.903 51.8842
9 0 DEAD LinStatic -7.131 51.8842
9 0.05 DEAD LinStatic -7.131 52.2407
9 0.1 DEAD LinStatic -7.131 52.5973
10 0 DEAD LinStatic -2.791 52.5973
10 0.05 DEAD LinStatic -2.791 52.7368
10 0.1 DEAD LinStatic -2.791 52.8763
11 0 DEAD LinStatic 1.138 52.8763
11 0.05 DEAD LinStatic 1.138 52.8194
11 0.1 DEAD LinStatic 1.138 52.7625
12 0 DEAD LinStatic 4.676 52.7625
12 0.05 DEAD LinStatic 4.676 52.5287
12 0.1 DEAD LinStatic 4.676 52.295
13 0 DEAD LinStatic 7.844 52.295
13 0.05 DEAD LinStatic 7.844 51.9028
13 0.1 DEAD LinStatic 7.844 51.5106
14 0 DEAD LinStatic 10.661 51.5106
14 0.05 DEAD LinStatic 10.661 50.9775
14 0.1 DEAD LinStatic 10.661 50.4445
15 0 DEAD LinStatic 13.15 50.4445
15 0.05 DEAD LinStatic 13.15 49.787
15 0.1 DEAD LinStatic 13.15 49.1295
16 0 DEAD LinStatic 15.328 49.1295
16 0.05 DEAD LinStatic 15.328 48.3631
16 0.1 DEAD LinStatic 15.328 47.5967
17 0 DEAD LinStatic 17.216 47.5967
17 0.05 DEAD LinStatic 17.216 46.7359
17 0.1 DEAD LinStatic 17.216 45.8751
18 0 DEAD LinStatic 18.832 45.8751
-
154 0.05 DEAD LinStatic 0.014 0.00097
154 0.1 DEAD LinStatic 0.014 -0.0017
155 0 DEAD LinStatic 0.012 -0.0017
155 0.05 DEAD LinStatic 0.012 -0.0022
155 0.1 DEAD LinStatic 0.012 -0.0028
156 0 DEAD LinStatic 0.00956 -0.0028
156 0.05 DEAD LinStatic 0.00956 -0.0033
156 0.1 DEAD LinStatic 0.00956 -0.0038
157 0 DEAD LinStatic 0.00779 -0.0038
157 0.05 DEAD LinStatic 0.00779 -0.0041
157 0.1 DEAD LinStatic 0.00779 -0.0045
158 0 DEAD LinStatic 0.00618 -0.0045
158 0.05 DEAD LinStatic 0.00618 -0.0048
158 0.1 DEAD LinStatic 0.00618 -0.0052
159 0 DEAD LinStatic 0.00474 -0.0052
159 0.05 DEAD LinStatic 0.00474 -0.0054
159 0.1 DEAD LinStatic 0.00474 -0.0056
160 0 DEAD LinStatic 0.00345 -0.0056
160 0.05 DEAD LinStatic 0.00345 -0.0058
160 0.1 DEAD LinStatic 0.00345 -0.006
161 0 DEAD LinStatic 0.00231 -0.006
161 0.05 DEAD LinStatic 0.00231 -0.0061
161 0.1 DEAD LinStatic 0.00231 -0.0062
162 0 DEAD LinStatic 0.0013 -0.0062
162 0.05 DEAD LinStatic 0.0013 -0.0063
162 0.1 DEAD LinStatic 0.0013 -0.0063
163 0 DEAD LinStatic 0.00043 -0.0063
163 0.05 DEAD LinStatic 0.00043 -0.0064
163 0.1 DEAD LinStatic 0.00043 -0.0064
-
164 0 DEAD LinStatic 0.00032 -0.0064
-
164 0.05 DEAD LinStatic 0.00032 -0.0064
-
164 0.1 DEAD LinStatic 0.00032 -0.0063
-
165 0 DEAD LinStatic 0.00096 -0.0063
-
165 0.05 DEAD LinStatic 0.00096 -0.0063
-
165 0.1 DEAD LinStatic 0.00096 -0.0062
-
166 0 DEAD LinStatic 0.00149 -0.0062
-
166 0.05 DEAD LinStatic 0.00149 -0.0062
-
166 0.1 DEAD LinStatic 0.00149 -0.0061
-
167 0 DEAD LinStatic 0.00193 -0.0061
-
167 0.05 DEAD LinStatic 0.00193 -0.006
-
167 0.1 DEAD LinStatic 0.00193 -0.0059
-
168 0 DEAD LinStatic 0.00228 -0.0059
-
168 0.05 DEAD LinStatic 0.00228 -0.0058
-
168 0.1 DEAD LinStatic 0.00228 -0.0057
-
169 0 DEAD LinStatic 0.00254 -0.0057
-
169 0.05 DEAD LinStatic 0.00254 -0.0056
-
169 0.1 DEAD LinStatic 0.00254 -0.0054
-
170 0 DEAD LinStatic 0.00274 -0.0054
-
170 0.05 DEAD LinStatic 0.00274 -0.0053
-
170 0.1 DEAD LinStatic 0.00274 -0.0052
-
171 0 DEAD LinStatic 0.00286 -0.0052
-
171 0.05 DEAD LinStatic 0.00286 -0.005
-
171 0.1 DEAD LinStatic 0.00286 -0.0049
-
172 0 DEAD LinStatic 0.00293 -0.0049
-
172 0.05 DEAD LinStatic 0.00293 -0.0047
-
172 0.1 DEAD LinStatic 0.00293 -0.0046
-
173 0 DEAD LinStatic 0.00294 -0.0046
-
173 0.05 DEAD LinStatic 0.00294 -0.0044
-
173 0.1 DEAD LinStatic 0.00294 -0.0043
-
174 0 DEAD LinStatic 0.00291 -0.0043
-
174 0.05 DEAD LinStatic 0.00291 -0.0041
-
174 0.1 DEAD LinStatic 0.00291 -0.004
-
175 0 DEAD LinStatic 0.00283 -0.004
-
175 0.05 DEAD LinStatic 0.00283 -0.0038
-
175 0.1 DEAD LinStatic 0.00283 -0.0037
-
176 0 DEAD LinStatic 0.00272 -0.0037
-
176 0.05 DEAD LinStatic 0.00272 -0.0036
-
176 0.1 DEAD LinStatic 0.00272 -0.0034
-
177 0 DEAD LinStatic 0.00257 -0.0034
-
177 0.05 DEAD LinStatic 0.00257 -0.0033
-
177 0.1 DEAD LinStatic 0.00257 -0.0032
-
178 0 DEAD LinStatic 0.00239 -0.0032
-
178 0.05 DEAD LinStatic 0.00239 -0.0031
-
178 0.1 DEAD LinStatic 0.00239 -0.0029
-
179 0 DEAD LinStatic 0.00219 -0.0029
-
179 0.05 DEAD LinStatic 0.00219 -0.0028
-
179 0.1 DEAD LinStatic 0.00219 -0.0027
-
180 0 DEAD LinStatic 0.00197 -0.0027
-
180 0.05 DEAD LinStatic 0.00197 -0.0026
-
180 0.1 DEAD LinStatic 0.00197 -0.0025
-
181 0 DEAD LinStatic 0.00174 -0.0025
-
181 0.05 DEAD LinStatic 0.00174 -0.0024
-
181 0.1 DEAD LinStatic 0.00174 -0.0023
-
182 0 DEAD LinStatic 0.00169 -0.0023
-
182 0.05 DEAD LinStatic 0.00169 -0.0023
-
182 0.1 DEAD LinStatic 0.00169 -0.0022
-
183 0 DEAD LinStatic 0.00164 -0.0022
-
183 0.05 DEAD LinStatic 0.00164 -0.0021
-
183 0.1 DEAD LinStatic 0.00164 -0.002
-
184 0 DEAD LinStatic 0.00159 -0.002
-
184 0.05 DEAD LinStatic 0.00159 -0.0019
-
184 0.1 DEAD LinStatic 0.00159 -0.0019
-
185 0 DEAD LinStatic 0.00154 -0.0019
-
185 0.05 DEAD LinStatic 0.00154 -0.0018
-
185 0.1 DEAD LinStatic 0.00154 -0.0017
-
186 0 DEAD LinStatic 0.00149 -0.0017
-
186 0.05 DEAD LinStatic 0.00149 -0.0016
-
186 0.1 DEAD LinStatic 0.00149 -0.0016
-
187 0 DEAD LinStatic 0.00144 -0.0016
-
187 0.05 DEAD LinStatic 0.00144 -0.0015
-
187 0.1 DEAD LinStatic 0.00144 -0.0014
-
188 0 DEAD LinStatic 0.00139 -0.0014
-
188 0.05 DEAD LinStatic 0.00139 -0.0013
-
188 0.1 DEAD LinStatic 0.00139 -0.0013
-
189 0 DEAD LinStatic 0.00133 -0.0013
-
189 0.05 DEAD LinStatic 0.00133 -0.0012
-
189 0.1 DEAD LinStatic 0.00133 -0.0011
-
190 0 DEAD LinStatic 0.00128 -0.0011
-
190 0.05 DEAD LinStatic 0.00128 -0.0011
-
190 0.1 DEAD LinStatic 0.00128 -0.001
-
191 0 DEAD LinStatic 0.00123 -0.001
- -
191 0.05 DEAD LinStatic 0.00123 0.00095
- -
191 0.1 DEAD LinStatic 0.00123 0.00088
- -
192 0 DEAD LinStatic 0.00119 0.00088
- -
192 0.05 DEAD LinStatic 0.00119 0.00082
- -
192 0.1 DEAD LinStatic 0.00119 0.00076
- -
193 0 DEAD LinStatic 0.00114 0.00076
- -
193 0.05 DEAD LinStatic 0.00114 0.00071
- -
193 0.1 DEAD LinStatic 0.00114 0.00065
-
194 0 DEAD LinStatic -0.0011 0.00065
194 0.05 DEAD LinStatic -0.0011 -0.0006
-
194 0.1 DEAD LinStatic -0.0011 0.00054
- -
195 0 DEAD LinStatic 0.00105 0.00054
- -
195 0.05 DEAD LinStatic 0.00105 0.00049
- -
195 0.1 DEAD LinStatic 0.00105 0.00044
- -
196 0 DEAD LinStatic 0.00101 0.00044
- -
196 0.05 DEAD LinStatic 0.00101 0.00039
- -
196 0.1 DEAD LinStatic 0.00101 0.00034
- -
197 0 DEAD LinStatic 0.00097 0.00034
- -
197 0.05 DEAD LinStatic 0.00097 0.00029
- -
197 0.1 DEAD LinStatic 0.00097 0.00024
- -
198 0 DEAD LinStatic 0.00093 0.00024
- -
198 0.05 DEAD LinStatic 0.00093 0.00019
- -
198 0.1 DEAD LinStatic 0.00093 0.00014
-
199 0 DEAD LinStatic -0.0009 0.00014
-9.9E-
199 0.05 DEAD LinStatic -0.0009 05
-5.5E-
199 0.1 DEAD LinStatic -0.0009 05
- -5.5E-
200 0 DEAD LinStatic 0.00087 05
- -1.1E-
200 0.05 DEAD LinStatic 0.00087 05
-
200 0.1 DEAD LinStatic 0.00087 3.2E-05
-
201 0 DEAD LinStatic 0.00075 3.2E-05
-
201 0.05 DEAD LinStatic 0.00075 7E-05
-
201 0.1 DEAD LinStatic 0.00075 0.00011
-
202 0 DEAD LinStatic 0.00065 0.00011
-
202 0.05 DEAD LinStatic 0.00065 0.00014
-
202 0.1 DEAD LinStatic 0.00065 0.00017
-
203 0 DEAD LinStatic 0.00055 0.00017
-
203 0.05 DEAD LinStatic 0.00055 0.0002
-
203 0.1 DEAD LinStatic 0.00055 0.00023
-
204 0 DEAD LinStatic 0.00046 0.00023
-
204 0.05 DEAD LinStatic 0.00046 0.00025
-
204 0.1 DEAD LinStatic 0.00046 0.00027
-
205 0 DEAD LinStatic 0.00037 0.00027
-
205 0.05 DEAD LinStatic 0.00037 0.00029
-
205 0.1 DEAD LinStatic 0.00037 0.00031
206 0 DEAD LinStatic -0.0003 0.00031
206 0.05 DEAD LinStatic -0.0003 0.00032
206 0.1 DEAD LinStatic -0.0003 0.00034
-
207 0 DEAD LinStatic 0.00023 0.00034
-
207 0.05 DEAD LinStatic 0.00023 0.00035
-
207 0.1 DEAD LinStatic 0.00023 0.00036
-
208 0 DEAD LinStatic 0.00017 0.00036
-
208 0.05 DEAD LinStatic 0.00017 0.00037
-
208 0.1 DEAD LinStatic 0.00017 0.00038
-
209 0 DEAD LinStatic 0.00011 0.00038
-
209 0.05 DEAD LinStatic 0.00011 0.00039
-
209 0.1 DEAD LinStatic 0.00011 0.00039
-6.5E-
210 0 DEAD LinStatic 05 0.00039
-6.5E-
210 0.05 DEAD LinStatic 05 0.00039
-6.5E-
210 0.1 DEAD LinStatic 05 0.0004
-2.2E-
211 0 DEAD LinStatic 05 0.0004
-2.2E-
211 0.05 DEAD LinStatic 05 0.0004
-2.2E-
211 0.1 DEAD LinStatic 05 0.0004
212 0 DEAD LinStatic 1.6E-05 0.0004
212 0.05 DEAD LinStatic 1.6E-05 0.0004
212 0.1 DEAD LinStatic 1.6E-05 0.0004
213 0 DEAD LinStatic 4.9E-05 0.0004
213 0.05 DEAD LinStatic 4.9E-05 0.0004
10
HA NGUYEN THANH THAI - 1652547
0
PROJECT OF FOUNDATION PROF. LE BA VINH
-1.2E-
251 0.05 DEAD LinStatic 1.6E-05 05
-1.3E-
251 0.1 DEAD LinStatic 1.6E-05 05
-1.3E-
252 0 DEAD LinStatic 1.2E-05 05
-1.4E-
252 0.05 DEAD LinStatic 1.2E-05 05
-1.4E-
252 0.1 DEAD LinStatic 1.2E-05 05
-1.4E-
253 0 DEAD LinStatic 9.4E-06 05
-1.5E-
253 0.05 DEAD LinStatic 9.4E-06 05
-1.5E-
253 0.1 DEAD LinStatic 9.4E-06 05
-1.5E-
254 0 DEAD LinStatic 6.6E-06 05
-1.6E-
254 0.05 DEAD LinStatic 6.6E-06 05
-1.6E-
254 0.1 DEAD LinStatic 6.6E-06 05
-1.6E-
255 0 DEAD LinStatic 4.2E-06 05
-1.6E-
255 0.05 DEAD LinStatic 4.2E-06 05
-1.6E-
255 0.1 DEAD LinStatic 4.2E-06 05
-1.6E-
256 0 DEAD LinStatic 2E-06 05
-1.7E-
256 0.05 DEAD LinStatic 2E-06 05
-1.7E-
256 0.1 DEAD LinStatic 2E-06 05
-2.4E- -1.7E-
257 0 DEAD LinStatic 08 05
-2.4E- -1.7E-
257 0.05 DEAD LinStatic 08 05
-2.4E- -1.7E-
257 0.1 DEAD LinStatic 08 05
-1.8E- -1.7E-
258 0 DEAD LinStatic 06 05
-1.8E- -1.7E-
258 0.05 DEAD LinStatic 06 05
-1.8E- -1.6E-
258 0.1 DEAD LinStatic 06 05
10
HA NGUYEN THANH THAI - 1652547
2
PROJECT OF FOUNDATION PROF. LE BA VINH
-3.4E- -1.6E-
259 0 DEAD LinStatic 06 05
-3.4E- -1.6E-
259 0.05 DEAD LinStatic 06 05
-3.4E- -1.6E-
259 0.1 DEAD LinStatic 06 05
-4.8E- -1.6E-
260 0 DEAD LinStatic 06 05
-4.8E- -1.6E-
260 0.05 DEAD LinStatic 06 05
-4.8E- -1.6E-
260 0.1 DEAD LinStatic 06 05
-1.6E-
261 0 DEAD LinStatic -6E-06 05
-1.5E-
261 0.05 DEAD LinStatic -6E-06 05
-1.5E-
261 0.1 DEAD LinStatic -6E-06 05
-7.1E- -1.5E-
262 0 DEAD LinStatic 06 05
-7.1E- -1.5E-
262 0.05 DEAD LinStatic 06 05
-7.1E- -1.4E-
262 0.1 DEAD LinStatic 06 05
-8.1E- -1.4E-
263 0 DEAD LinStatic 06 05
-8.1E- -1.4E-
263 0.05 DEAD LinStatic 06 05
-8.1E- -1.4E-
263 0.1 DEAD LinStatic 06 05
-8.9E- -1.4E-
264 0 DEAD LinStatic 06 05
-8.9E- -1.3E-
264 0.05 DEAD LinStatic 06 05
-8.9E- -1.3E-
264 0.1 DEAD LinStatic 06 05
-9.6E- -1.3E-
265 0 DEAD LinStatic 06 05
-9.6E- -1.2E-
265 0.05 DEAD LinStatic 06 05
-9.6E- -1.2E-
265 0.1 DEAD LinStatic 06 05
-1.2E-
266 0 DEAD LinStatic -1E-05 05
-1.1E-
266 0.05 DEAD LinStatic -1E-05 05
10
HA NGUYEN THANH THAI - 1652547
3
PROJECT OF FOUNDATION PROF. LE BA VINH
-1.1E-
266 0.1 DEAD LinStatic -1E-05 05
-1.1E- -1.1E-
267 0 DEAD LinStatic 05 05
-1.1E-
267 0.05 DEAD LinStatic 05 -1E-05
-1.1E- -9.6E-
267 0.1 DEAD LinStatic 05 06
-1.1E- -9.6E-
268 0 DEAD LinStatic 05 06
-1.1E-
268 0.05 DEAD LinStatic 05 -9E-06
-1.1E- -8.5E-
268 0.1 DEAD LinStatic 05 06
-1.2E- -8.5E-
269 0 DEAD LinStatic 05 06
-1.2E- -7.9E-
269 0.05 DEAD LinStatic 05 06
-1.2E- -7.3E-
269 0.1 DEAD LinStatic 05 06
-1.2E- -7.3E-
270 0 DEAD LinStatic 05 06
-1.2E- -6.7E-
270 0.05 DEAD LinStatic 05 06
-1.2E- -6.2E-
270 0.1 DEAD LinStatic 05 06
-1.2E- -6.2E-
271 0 DEAD LinStatic 05 06
-1.2E- -5.6E-
271 0.05 DEAD LinStatic 05 06
-1.2E-
271 0.1 DEAD LinStatic 05 -5E-06
-1.2E-
272 0 DEAD LinStatic 05 -5E-06
-1.2E- -4.3E-
272 0.05 DEAD LinStatic 05 06
-1.2E- -3.7E-
272 0.1 DEAD LinStatic 05 06
-1.2E- -3.7E-
273 0 DEAD LinStatic 05 06
-1.2E- -3.1E-
273 0.05 DEAD LinStatic 05 06
-1.2E- -2.5E-
273 0.1 DEAD LinStatic 05 06
-1.2E- -2.5E-
274 0 DEAD LinStatic 05 06
10
HA NGUYEN THANH THAI - 1652547
4
PROJECT OF FOUNDATION PROF. LE BA VINH
-1.2E- -1.9E-
274 0.05 DEAD LinStatic 05 06
-1.2E- -1.2E-
274 0.1 DEAD LinStatic 05 06
-1.2E- -1.2E-
275 0 DEAD LinStatic 05 06
-1.2E- -6.2E-
275 0.05 DEAD LinStatic 05 07
-1.2E-
275 0.1 DEAD LinStatic 05 0
10
HA NGUYEN THANH THAI - 1652547
5
PROJECT OF FOUNDATION PROF. LE BA VINH
10
HA NGUYEN THANH THAI - 1652547
6