Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Montes Joshua E.

BS-Arch 5-2 Pet


ARCH 4053
CONSTRUCTION MANAGEMENT
ACTIVITY 1
A. Cite examples how you can apply in the construction site.

1. Quality Planning 2. Quality Assurance 3. Quality Control 4. Quality Improvement

A. Trained and Professional workers A. Durable A. Training


A. Product Testing

B. Complete set of equipment and B. Long lasting B. Product Testing B. Complete set of equipment and
tools tools

C. Time Management C. Proper Application C. Inspections C. Time Management

D. Complete construction documents D. Sufficient Supply D. Workmanship standard D. Efficient workflow

E. Approved Permits E. Warranty E. Zero Defects E. Established Scope


B. Provide 4 images of building or house designs that need improvement and 4 images of building or house constructions that need improvement. Provide a brief description for each
image.

1.This building in London causes extreme glare cause by its concave


shape.
2. Windowless home in Australia is poorly designed.

3.This house in Belgium has too many windows.


4. The door of this building is off center.

5. The drawers is not accessible because of the wall.


6.The opening handle of the window is oriented outside
the structure.
7. The stair section drawing is built the same way.

8. This Column Doesn't Touch the Ceiling.

You might also like