3.

3 PPROSES PENELITIAN 24
3.4 PENDEKATAN KUANTITATIF 25
3.5 PENDEKATAN KUALITATIF 26
BAB IV DATA PENELITIAN 27
4.1 UMUM (Data Lapangan) 27
4.2 DATA JEMBATAN BAJA 28
4.3 TAHAP ERECTION 63
4.4 DATA RENCANA JEMBATAN BETON 1 71
4.5 DATA RENCANA JEMBATAN BETON 2 78
BAB V ANALISA DATA 82
5.1 ANALISA KUALITATIF JEMBATAN BAJA 82
5.2 ANALISA KUALITATIF JEMBATAN BETON 85
5.3 ANALISA KUANTITATIF 97
5.4 RENCANA MUTU DAN PEDOMAN K3 100
BAB VI PENUTUP 106
6.1 KESIMPULAN 106
DAFTAR PUSTAKA 108
LAMPIRAN 109

xiv

Studi banding..., Muhamad Kusmulyono, FT UI, 2008


DAFTAR GAMBAR

Halaman
Gambar 2.1 Bagian-bagian struktur utama konstruksi jembatan 5
Gambar 2.2 Pekerjaan Pemancangan 9
Gambar 2.3 Tiang Pancang setelah digali 10
Gambar 2.4 Pemotong sisa tiang pancang dan bliding stone 10
Gambar 2.5 Lean Concrete Footoing 10
Gambar 2.6 Penulangan Footing 10
Gambar 2.7 Pengecoran Footing 11
Gambar 2.8 Bekisting dinding abutment 11
Gambar 2.9 Pengecoran dinding abutment 11
Gambar 2.10 Abutment 12
Gambar 2.11 Penimbunan Footing Abutment 12
Gambar 2.12 Sistem Perancah 16
Gambar 2.13 Sistem Service Crane 17
Gambar 2.14 Sistem Launching Truss 18
Gambar 2.15 Counter Weight dan Link-Set 19
Gambar 2.16 Sistem Launching Gantry 19
Gambar 2.17 Sistem Traveller dan Heavy Gantry 20
Gambar 3.1 Diagram alir proses pelaksanaan penelitian 24
Gambar 3.2 Diagram alir proses analisa metode pelaksanaan jembatan
Konstruksi Baja dan Konstruksi Beton 25
Gambar 4.1 Kondisi Eksisting 27
Gambar 4.2 Gambar Image 3 Dimensi 29
Gambar 4.3 Diameter Lubang Baut 31
Gambar 4.4 Panjang Baut 32
Gambar 4.5 Column, Post, Stud, dan Pengaku 49
Gambar 4.6 STAIRWAY 50
Gambar 4.7 LADDER 50
Gambar 4.8 Baut 60
Gambar 4.9 Erection Tahap 1 63

xv

Studi banding..., Muhamad Kusmulyono, FT UI, 2008