B1 Beam 2 Required As Drawn MKD' No: List of Materials

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D E F G H J K

GRID LOCATION List Of Materials


EL.+ 2.675 A-B/2 Length Weight(kg)
No. Specification (mm)
Mate Quanlity Unit Total Remarks
EL.+ 2.675 A-B/4

BEAM B1 - 2 pcs in total Total weight: 8981.1 * 2 = 17962.2


1 M1 SHS70*70*4.0 1924 250 Mp 6 15.7 94.2 1
P1 PLT16*2650 8500 250 Mp 1 2829.1 2829.1
8500 P2 PLT16*2650 8500 250 Mp 1 2829.1 2829.1
1650 1250 1250 1250 1250 1250 600 P11 PLT12*250 1196 250 Mp 7 28.2 197.2
P16 PLT12*251 1484 250 Mp 7 35.1 245.6
P54 P46 P40 P20 PLT12*250 1484 250 Mp 7 34.9 244.6
P30 P1 P53

150
P31 P34 P45 P47 P50 P30 PLT25*300 8500 250 Mp 2 500.4 1000.9
P31 PLT25*300 8095 250 Mp 2 476.6 953.2
P33 PLT25*300 675 250 Mp 2 39.7 79.5
P34 PLT10*80 1492 250 Mp 7 9.4 65.6
P44 P35 P35 PLT10*150 1492 250 Mp 7 17.6 123.0
P43 P39

700
P55 P39 PLT10*150 1928 250 Mp 2 22.7 45.4

P11
P56 P51
P34

P20
P20

P20
P34 P40 PLT10*150 2240 250 Mp 2 26.4 52.7

P20
P20

P20
P35 P52 P43 PLT10*150 270 250 Mp 2 3.2 6.4
1800

1500

1500
P44 PLT10*150 602 250 Mp 2 7.1 14.2
100

P55 P35 P53 P51 P45 PLT10*150 933 250 Mp 2 11.0 22.0

P11
P11
7x P16

P11
6x
P54 P50 P46 PLT10*150 1265 250 Mp 2 14.9 29.8

M1

P11
P20

P11
P52

P11
2 P34 2
P56 P45 P40 P47 PLT10*150 1596 250 Mp 2 18.8 37.6
P35 P47
P43 P2 P50 PLT10*80 2240 250 Mp 2 14.1 28.1
P51 PLT10*80 1928 250 Mp 2 12.1 24.2
P52 PLT10*80 1597 250 Mp 2 10.0 20.1
P53 PLT10*80 1265 250 Mp 2 7.9 15.9
P30 P31
150

P44 P46 P39 P54 PLT10*80 934 250 Mp 2 5.9 11.7


P55 PLT10*80 602 250 Mp 2 3.8 7.6
400 1250 1250 1250 1250 1250 1250 600 P56 PLT10*80 271 250 Mp 2 1.7 3.4
All Weight: 17962. kg

PLT16*2650 x 8500

7946 150 404 1800

400 1250 1250 1250 1250 1250 1250 600 150 150 1200 150 150

3 3
A
6x M1 FS P1 P20 (N/S) P20 (N/S) P20 (N/S)
P20 (N/S) P44 (N/S) P2 (N/S) P20 (N/S) P20 (N/S)

25

58
93

93
7x P16 NS
624

8 TYP
P53 (N/S) 8
P20 (N/S) TYP
P56 (N/S) 6
P43 (N/S) P55 (N/S)
P46
P34 (N/S) P52 (N/S)
P45 (N/S) P39 (N/S)
P47 (N/S)
P46 (N/S) P51 (N/S) TYP
P50 (N/S) 6
P55 (N/S)
P34 (N/S)
P40 (N/S)
P31 (N/S) P52 (N/S) TYP 16
P34 (N/S)
P35 (N/S)

2699

2650
4 P53 (N/S) 4
P39 (N/S)
P34 (N/S)
P35 (N/S) P50 (N/S)

P34 (N/S)
P35 (N/S)
P51 (N/S)
P34
P35 (N/S)
P34 (N/S) P40 (N/S)

P35 (N/S) A

P33 (N/S)
675

24
7825 675 NOTES:
SECTION - A - A 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN METRES.
5 2. ALL SITE & SHOP WELDS SHALL BE COMPLETE JOINT PENERTRATION WELD, U.N.O. 5
400 1250 1250 1250 1250 1250 1250 600 3. ALL LOOSE ITEMS TO BE SEND ALONG WITH THE RESPECTIVE MAIN MEMBERS.
4. ALL BOLTS & NUTS SHALL BE GRADE 8.8 & HOT DIP GALVANIZED
5. DENOTES SHOP MARK SHALL BE PROVIDED BY THE FABRICATOR ON FLANGE
OF MEMBER / FACE OF PLATES ON EACH ASSEMBLY AS SHOWN ON SHOP
150

P31 P33 DETAIL DRAWINGS,SAME IS TO BE REFERED FOR ORIENTATION DURING ERECTION OF


THE ASSEMBLY.
6. ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS SHALL NOT BE
PERMITTED

P35
P35 P35
P20

P34
P34 P34
1800

1500

P35 P34
P35
P20

P34
P20

P20
P20

P20

P30
P20

DATE MARK REVISION DESCRIPTION CREATED CHD. APP.


6 MAIN CONTRACTOR 6
HINDUSTAN CONSTRUCTION COMPANY
P33 Lal Bahadur Shastri Rd, Gandhi Nagar, Vikhroli West, Mumbai
150

P34
P31 Maharashtra 400083
8500
FABRICATOR : SG HEAVY ENGINEERING PVT. LTD
Admin office: 513, Marathon Max, Mulund Link Road,
Mulund (W), Mumbai-400 080
Tel: 022 67564849 / 50. Mail: design@vggroup.org
PROJECT ERECTION TRUSS FOR ARM 1 & 2

LOCATION MUMBAI COSTAL PROJECT - WORLI.

TITLE
LAUNCHING GIRDER
FABRICATION DETAIL OF BEAM MKD' B1
7 DR'N T.P 16.04.21 SCALE: JOB NO. SIZE. 7
1:10
CH'D S.G 16.04.21 1:20 A3
APP P.S 16.04.21 DRG. NO. SHEET REV.

FILE NAME :
APP D.K 16.04.21 SG-HCC-HDC-LG-FAB- B1 1OF1 R0
2 No BEAM REQUIRED AS DRAWN MKD' B1 C.APP V.G 16.04.21
Tekla structures

A B C D E F G H J K
REVISED ON :

You might also like