Fire Alarm Commissioning Checklist

WW Design & Sales Facilities


Project or Maintenance Description: ______________________________________________________
Date Inspected: ________________________
Project Manager: _____________________________________________________________
Work Permit ID: ___________________

Printed Specifications are NOT Controlled Documents. Verify Revision before using.

ITEM DESCRIPTION YES/NO CORRECTIVE ACTION/


N/A DATE CORRECTED/COMMENTS
G GENERAL Inspected By: ___________________________________
Work area is clean, orderly, no leftover material or
G1
debris.
Safety Hazards Addressed: Sharp edges, low head
G2
clearance, missing equipment guards, etc…
Wall and ceiling penetrations are repaired, painted,
G3
or replaced with equivalent material.
Penetrations through fire rated construction has been
G4
sealed with fire caulk and pillows.
G5 Installation meets code compliance requirements.
Material has been disposed or recycled in the proper
G6 containers (Ex: Wood, Metal, General Trash,
Cardboard).
Abandoned, unused, or decommissioned equipment
G7
has been wrecked out or removed from service
Manufacturer installation, operation, and start-up
G8
checklist are complete.
Equipment meets requirements for work space
G9
clearance (Ex. Electrical panels, thermostats, etc…)

D DOCUMENTATION: Inspected By: ___________________________________


Submittal of manufacturer cut sheets and O&M
D1
manuals to System Owner.
Submittal of sequence of operation to System
D2
Owner.
Submittal of as-built/red line drawings to System
D3 Owner.

1/2
ITEM DESCRIPTION YES/NO CORRECTIVE ACTION/
N/A DATE CORRECTED/COMMENTS
FA FIRE ALARM: Inspected By: ___________________________________
Equipment installed agrees with specifications and
FA1
submittals.
Verify equipment/device locations are per plans and
FA2
specifications.
Inspect enclosure physical and electrical condition -
FA3 no damage evident and terminations acceptable.

Equipment/device labels meet TI Simplex standard


FA4
nomenclature.
Electrical Service Fed-By label on panels/power
FA5
supplies.
FA6 Panels are clean - clear of dust/debris.
Inspect battery condition - no corrosion, tight
FA7
connections
FA8 Adequate service access provided to equipment.
FA9 Functional test of all new devices/equipment.
Additional commissioning checklist(s) are completed
FA10
as required

PM SYSTEM OWNER/PROJECT MANAGER: Inspected By: ___________________________________


Panel wire diagram and fire alarm plan master have
PM1
been updated and stored in Meridian.
Sequence of Operations (SOO) and Standard
PM2 Operating Procedures (SOP) have been created or
updated for equipment as required.
Preventative Maintenance Job Plans and Warranty
PM3 information has been created and documented in
Maximo.
Operations and Maintenance training complete for
PM4
new systems

REVISION HISTORY:
NR
Authored By: a0272234, Steven Ballance Date: 7/12/2012
Approved By: a0121236, Jeff Miller Date: 7/12/2012