REF: SGI/NTDC/2517/10 Dated: 25th Oct, 2017

To,
The Manager Design, (Civil)
National Transmission and Dispatch Company,
Lahore.

Subject: PROTOTYPE ASSEMBLY TESTING OF 10+3.1M COLUMN (ST-9802)


AGAINST NOTIFICATION OF AWARD NO: CE/P&MM/ADG(MC)/
NOR-61/1388-1404, DATED: 26-07-2017

Ref: NTDC Letter No: CED/NTDC/MDC/18994-95, Dated: 18/10/2017.

Dear Sir,
With Reference to the above cited letter, it is informed that the following Tests
successfully performed from UET Lahore & PSQCA Lahore with the Witness of your
office representative:-
Sr. No. Description Test Performed
1 Tensile Test of Material Report Attached
2 Bend Test of Material Report Attached
3 Galvanizing Test of Material Report Attached
4 Proof Load test of Nuts & Bolts Report Attached

You are requested to kindly issue us prototype report of 10+3.1M Column (ST-9802), So
that the Material can be delivered as early as possible.
Thanking you in anticipation.
For Specialists Group Inc. Limited.

Nouman Akram
Manager Design (SGI)
C.c:-
1. Manager SS Design (EHV), Room No 132 WAPDA House Lahore.