Professional Documents
Culture Documents
Infrastructure Construction Proposal
Infrastructure Construction Proposal
Proposal
Prepared For –
Client Name
Prepared by –
Employee Assigned
Firm Name
Infrastructure Constriction
Sincerely yours,
(company_name)
2
01 Project Overview 06 Fee Summary
› Scope of work
› Sitework & Concrete
Foundation
Table of Content
02 Service Offering 07 About Us
› Interior – Exterior › Our Team
› Framing, Flooring, Windows, Doors › Portfolio
› Electrical Fittings
05 Related Risks
3
Table of Content
Project Overview
› Scope of Work
› Sitework & Concrete Foundation
4
Infrastructure Constriction
Envisioned project
June 1, 2019
initiation date
Proposed
September 30, 2019
completion date
Total budget
$110,000
of the Project
The Construction Project will be undertaken in accordance to requirements set forth in contract and include details as follows-
› The Construction project will be constructed on vacant piece of land owned by (owner_name ) located at (place)
› In depth detail of work to be performed
› List consist of materials required, necessary equipment, specification number, model colors, etc. are provided by the company
› Process regarding removing trash from site
› Focus on client expectations like bathroom facilities
› The company is given the full responsibility of overseeing the construction work in project
5
Infrastructure Constriction
› Landscaping allowance-$3500
› Site excavation and backfill is required to get back the site in
original condition as near as possible
› Turnaround area or gravel driveaway
› Add text here
6
Table of Content
Service Offering
› Interior – Exterior
› Framing, Flooring, Windows, Doors
› Electrical Fittings
7
Infrastructure Constriction
› Insulation
INTERIOR › Railings
› Window and door openings
› Walls and ceilings to be drywalled
› Drywalls glued and screwed to studs
› Paint and trim as follows
› Add text here
8
Infrastructure Constriction
9
Infrastructure Constriction
10
Table of Content
Other Costs
› Job Costs
› Cost Excluded in Proposal
11
Infrastructure Constriction
Builder Risk
12
Infrastructure Constriction
Appliances Telephone
Insurance compensation of
workers on behalf of uninsured Additional expenses due to
subcontractors who are directly natural calamity, disaster
paid by customers
13
Table of Content
Project Schedule
14
Infrastructure Constriction
Milestone 1 Description of milestone task Description of milestone task Description of milestone task
Milestone 2 Add text here Add text here Add text here
Milestone 3 Add text here Add text here Add text here
Milestone 4 Add text here Add text here Add text here
Milestone 5 Add text here Add text here Add text here
15
Infrastructure Constriction
16
Table of Content
Related Risk
17
Infrastructure Constriction
› Our team has conducted a survey at project construction site last at (date)
› Team has identified certain risks
› Risks mitigation measures applied at site during construction period
18
Table of Content
Fee Summary
19
Infrastructure Constriction
Description Price
Pre Planning and Budget $20,000
Materials $35,000
Labor $15,000
Construction Design Fees $12,000
Professionals Fees $8,000
Sub – Contractors $14,000
Construction Contingency at 7% $6580
Subtotal $100,580
Taxation Rate 5% $5029
Total $105,609
20
Table of Content
About Us
› Our Team
› Portfolio
21
Infrastructure Constriction
Our firm (company_name) is a commercial construction company committed to safely deliver each
project in accordance to client’s specification, time and budget
Conrad Shaffer founded the firm in 1964 and passed along to his son in 2002
Mostly our work expertise is new construction but also successfully completed task related to challenging renovation and
rehabilitation projects
22
Infrastructure Constriction
Patrick Shaffer
Founder
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Theodore Dean
Team Leader
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
23
Infrastructure Constriction
Katherine Reynolds
Founder
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Abigail Murphy
Team Member
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Melissa Fraser
Contractor
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
24
Infrastructure Constriction
Budget –
› Materials - $XXXXX
› Labor - $XXXX
25
Table of Content
Contract
26
Infrastructure Constriction
Mutual Cooperation
We agree to put our best efforts in return we expect your cooperation in providing
needed information
Terms of Payment
› Fifty percent of initial fees at the point of contract signing and it will act as deposit
› Remaining 50% will be submitted after project completion
Plans Cancellation
Right modify, reject, cancel or stop at any point processes but are imbibed to reimburse us all
costs and expenses
Confidentiality
All efforts to preserve confidentiality of information
27
Table of Content
Proposal Sign-off
28
Infrastructure Constriction
(company_name) has proposed to construct mentioned unit in all inclusive fee of $XXXXXX.
Design Construction
Reporting Supervision
Additional charges will be incurred if alterations are made to project scope once the document has been signed or the there are
difference between the outlined allowance or variation in the actual costs.
Next step is proposal agreement and signing the contract agreement in reference to the document.
Signature Signature
Proposal Lead Default Contract
(user_Assigned) (client_contrat_first)
(company_Name) (client_contrat_last)
(client_name)
29
Infrastructure Constriction
Address
# street number, city, state
Contact Number
0123456789
Email Address
emailaddress123@gmail.com
30
Infrastructure Constriction
31
Additional Slides
32
Infrastructure Constriction
Vision
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Mission
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Goal
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
33
Infrastructure Constriction
05
01
03
Text Here
This slide is 100% editable. Adapt
it to your needs and capture
your audience's attention.
34
Infrastructure Constriction
START
END
35
Infrastructure Constriction
36