The project activity comprises of one steam generator(Boiler) and one power generator(Steam turbine) with
capacities of 32TPH, 66 Kg / Sqcm, 485 Deg C, Installed Capacity of 7.5MW at Narasingapalli village of Kasimkota
Mandal in Viskahapatnam District, Andhra Pradesh,India.The main purpose of the project activity is generation
of electricity by using biomass residues such as paddy husk, pamoline fibre, baggasse, causrina branches,
groundnut shells,poultry litter, woody biomass etc and exports the generated electricity to the state owned
power utility company named Andhra Pradesh Transmission Company(APTRANSCO), ie APEPDCL.
The 11KV generated power from the unit stepped up to 11/33 KV and evacuated to 132KV Narasingapalli
substation which is 0.4 km away from the power plant. In this process there are no green house gas emissions
or burning of any fossil fuels.
The 7.5 MW power project was synchronized with grid on 26th Dec 2012 and in operational standby.
• The rice husk is being used as a main fuel. Seasonal agro residues like baggasse ,saw dust, ground nut shells, casuarina
branches ,Jamoil skin, Palmoline fibre etc.,.The fuel on receipt in the plant premises is weighed at the Electronic weighbridge
installed at the plant main gate at National Highway -16, , unloaded in the fuel yard and stacked properly. The type of fuel,
quantities, vehicle No., etc are recorded by weighbridge staff and the same was certified by the fuel yard staff and security
personnel.
Technology
The technology(Rankin cycle) or power generation process using biomass fuels is converting the kinetic energy
available in the steam into mechanical energy using steam turbines and then to electrical energy using
alternators. The generated power will be transferred to match the nearest grid substation for proper
interconnection and smooth evacuation of power.
Other Benefits:
In and around of 100 Kms from the plant we are getting paddy husk from the rice millers and small
farmers. The rice husk is being used as a main fuel. Seasonal agro residues like baggasse, saw dust,
ground nut shells, pamoline fibre, casuarinas branches etc., were also used according to the
availability.
As the plant is being operating depending on the agriculture bio mass residual fuels procurement
and preparation of almost seven thousand tons fuel per month is a big challenge. Efficient
combustion of the multi fuels needs more attention and operational skills to reduce unburnt carbon
losses as these fuels differ in moisture and calorific values. Drying of chopped fuel difficult as some
variety of fuels will have almost 50% total moisture.
There is a drastic change in the industrial scenario lot of small and middle scale industries like
solvent oil extraction plants, ethanol plants and Beverages plants are grown up and utilizing paddy
husk as an idle fuel. Due to this the price of the rice husk escalated.
Lot of land agriculture land converted for real-estate and commercial use which resulting shortage of
paddy husk creating more demand, the drastic change in environment also leads for shortage of
paddy husk.
The abnormal escalation of fuel price contributing major role attributing to run the plant without
economical viability.
Viewing the above there is no any further planning to enhance the capacity of the plant
Location
The Vishnu Vidyuth India Ltd was located at Narasingpalli village, Etcherla Mandal, Srikakulam District, Andhra
Pradesh State, in India. The geographical coordinates are 18031’N and 8309’E
General Details
1 Name of the project VISHNU VIDJTY IDDIA LIMITED
& NARASINGABILLI VILLAGE, KASIMKOTA MANDAL
Registered office address YELAMANCHILI,VISAKHAPATNAM - 531055
2 Location and address of the project NARASINGABILLI VILLAGE, KASIMKOTA MANDAL
YELAMANCHILI,VISAKHAPATNAM - 531055
3 Name of the authorized person CH.CHINASANYASIRAJU
Designation DIRECTOR
Phone no and STD code 08924-
Fax
E-mail Vishnuvidyuth.technical@gmail.com
Mobile
5 License capacity of the plant(MW) 7.5MW
6 Installed capacity of the plant 7.5 MW
7 Operating days in a year 300
8 Date of synchronization 2012 DEC 26
9 Date of Commercial Operation 2012 DEC 26
10 Total Project cost in Rs Crores 55 crore
Land 22.5 acres
Civil Work
Plant & Machinery
Miscellaneous Equipment
Pre-operative expenses and others ( inc IDC) Allocated to Project Cost components.
11 Means of Financing i) 18.270 Cr from IREDA, New Delhi,
ii) 0.25 Cr from MNES as Subsidy
iii) 16.13 Cr from Promoters as promoter’s
contribution.
12 Financial Institutions involved in funding of i) Term Loan- IREDA
the Project and for operations. ii) Working Capital loan from ING VYSA BANK
(Rs.1.50 Cr) – Presently Andhra bank
A Boiler
1 Make of Boiler WALCHANDNAGAR INDUSTRIES LIMTED
2 Type of Boiler Bidrum. Water tube. Travelling
grate Biomass fired. Natural
circulation , Bottom supported,
balanced draught boiler
3 Capacity TPH 32
4 Design Pressure Kg/Cm2 66
5 Temperature Deg C 485
6 Heating surface Square M 2053
area
6 Type of Chimney RCC
Height of Mtr 60
Chimney
C Turbine
1 Make HCTC
2 Type Fully condensing – FC, Back pressure –BP,
Extraction cum condensing – EC, Extraction with
back pressure - EB
3 Capacity MW 7.5
4 Inlet Steam ATA 66
Pressure
5 Inlet Steam Deg. C 485
Temperature
6 Inlet Steam Flow TPH 32
7 Turbine Speed RPM 3000
E ALTERNATOR
1 Type QF1/WU7.5/2
2 Type of BRUSHLESS
Excitation system
3 Continuous rated MW/MVA 7.5/ 9.375
output
4 Rated Speed RPM 3000
6 Voltage Kvolts 11
7 Full Load Current Amps 492
8 No. of Poles 2
F Exciter
1 Type of exciter BRUSH LESS
TFL 380/150-6
2 Output kW 80
3 Voltage Volts 265
4 Current Amps 300
5 Frequency Hz 50
6 Revolutions RPM 3000
7 Excitation Volts 93.08
voltage
8 Excitation current Amps 2.81
9 No. Phases 3
10 No. of Poles 2
11 Power Factor 0.8
12 Insulation class F
G Surface Condenser
1 Manufacturer CICB-Chemicon Pvt
Ltd
2 Type PARALLEL FLOW,TWO
PASS
3 Quantity of Steam T/hr 30.11
H Cooling Tower
8 Range Deg C
9 Approach Deg C
1 Make
Industrial systems and Equipment Ltd
ID Fan Flow (M3/Sec) at MCR 25
Pressure mmwc 215
Temperature Deg C 150
Fan speed (RPM) 990
Motor Make SIEMENS
Motor Rating KW 150
2 Make
Industrial systems and Equipment Ltd
FD Fan Flow (M3/Sec) at MCR 15
Pressure mmwc 225
Temperature Deg C 27
Fan speed (RPM) 1480
Motor Make SIEMENS
Motor Rating KW 55
3 Make
Industrial systems and Equipment Ltd
SA Fan Flow (M3/Sec) at MCR 5.0
Pressure mmwc 30
Temperature Deg C 27
Fan speed (RPM) 1480
Motor Make SIEMENS
Motor Rating KW 55
I.II Deaerator
1 Type Horizontal spray cum tray
type
2 Capacity T/Hr 35.5
3 Heating Steam Quantity MT/Hr 503
4 Heating Steam Pressure Kg/Cm2
5 Operating Pressure Kg/Cm2 1.46
6 Design Pressure Kg/Cm2 4.5
7 Inlet Water Temperature °C 35
8 Out let Water Temperature °C 108
TURBINE AUXILIARIES
J Turning Gear
1 Motor rating KW 2.2
2 Speed Rpm 1730
3 Load Amps 4.5
4 Mounting Flange
K RO Plant
1 Inlet Flow m3/hr 9
2 Output Flow m3/hr 5
3 Reject Water /Hr m3/hr 2
K.I DM Plant
1 Inlet Flow m3/hr 7
2 Output Flow m3/hr 5
3 Effluent Water Flow (in 3 days) m3/hr 7
1 Make KSB
2 Type MEGA G 40-160
3 Capacity M3/Hr 4.5
4 Motor Rating KW 3.7
5 Speed Rpm 2880
ELECTRICAL SYSTEM
11 KV Side Breaker
N.III
1 Make ABB
2 Type VCB
3 Rated Voltage Kv 12
4 Full Load Amps 1250
5 Bus Bar Rating KA 26.3
3 Capacity Kw
4 Ambient Temp Max / min Deg C 45 / 5
AIR COMPRESSORS
11KV TRANSFORMER