Inspection of Test Plan: Pressure Vessel Equipment
Inspection of Test Plan: Pressure Vessel Equipment
MIGAS RECERTIFICATION
OF
PRESSURE VESSEL
( List Attached )
Prepared by : Reviewed by :
PT Berkah Gas Insani PT Titis Sampurna Inspection
MIGAS
INSPECTION AND TEST PLAN
FOR EXISTING PRESSURE VESSEL
2 EXTERNAL INSPECTION
a. Visual
- Ladders, Stairways, Platforms or Walkways Client Spec./ Procedure P V
- Foundation and Support, Anchors API RP 572 P V
- Level Glass, PSV, Press. & Temp. gauges Client Spec./ Procedure ANSI - NB 23 P V
API RP 572 ANSI - NB Inspection Report / Record
- Shell, Head, Nozzles, Flange Connection 23 P V
- Coating and Insulation P V
- Grounding Connections P V
b. NDT ( as required ) P V
NDT Procedure NDT Report API 510
c. Thickness Measurement (*) P V
3 INTERNAL INSPECTION
( IF OFF-STREAM )
- Visual Inspection P V
Migas Regulation &
- Corrosion Mapping ( If any ) Inspection Report / Record P V
Inspection Procedure
- NDT ( as required ) P V
4 RUBBING/PHOTO NAME PLATE ASME NB - 23 NP Rubbing/Photo Record P V
5 REPORT
- Final Inspection Report Inspection Company Final Insection Report Client Spec / Code and AR P
Standard
6 - Issued Certificate of Inspection Inspection Company Certificate of Inspection Permen 18 tahun 2018 - P
Note :
1. Reference Document : Government Regulation, Code & Standard.
2. Verified Document : Document to be verified
3. Acceptance Criteria : Government Regulation, Code & Standard
LIST PERSONNEL
RECERTIFICATION OF PRESSURE VESSEL EQUIPMENT
Location Remark
Activities Schedule Plan
1 unit Power Generator - Migas Recertification
PT Berkah Gas Insani
2021
No Activities days January February March April
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
4 Review Document 7
5 Site Inspection 3
6 Migas Verification 4