INSPECTION OF TEST PLAN

PRESSURE VESSEL EQUIPMENT

MIGAS RECERTIFICATION
OF
PRESSURE VESSEL
( List Attached )

Location : …………………….(Tolong Untuk Bisa Diisi)

Owner : PT Berkah Gas Insani


Inspection Company : PT Titis Sampurna Inspection

Prepared by : Reviewed by :
PT Berkah Gas Insani PT Titis Sampurna Inspection

MIGAS
INSPECTION AND TEST PLAN
FOR EXISTING PRESSURE VESSEL

PROJECT : Re-Certification Of 8 Unit Pressure Vessels TAG / SER. NO : (attachment)


OWNER/USER : PT Berkah Gas Insani
LOCATION : …………………….(Tolong Untuk Bisa Diisi)
P.I. : PT Titis Sampurna Inspection Remark
R : REVIEW P : PROVIDE
PROJECT DURATION : 1 Month V : VERIFICATION AR : APPROVAL REQUIRED
H : HOLD POINT
REFERENCE VERIFIED ACCEPTANCE SCOPE OF INSPECTION
NO. ACTIVITY
DOCUMENT CRITERIA USER PI MIGAS
1 PRE-INSPECTION
Documents Review
- Design Information Migas Regulation Manufacture Data Report Permen 18 tahun 2018 P R
- Inspection History ANSI - NB 23 Insp. Report & Record ANSI - NB 23 P R
- History Card API 510 History Card API 510 P R
- As built drawing API 520 Drawing ( as built ) API 520 P R
- Copy of Name Plate ANSI - NB 23 Name Plate Record ANSI - NB 23 P R
- Current PV Jurisdictional Insp. License ASME VIII Div.1 PV License ASME VIII Div.1 P R
- Current PSV Jurisdictional Insp. License History Card PSV License History Card P R

2 EXTERNAL INSPECTION
a. Visual
- Ladders, Stairways, Platforms or Walkways Client Spec./ Procedure P V
- Foundation and Support, Anchors API RP 572 P V
- Level Glass, PSV, Press. & Temp. gauges Client Spec./ Procedure ANSI - NB 23 P V
API RP 572 ANSI - NB Inspection Report / Record
- Shell, Head, Nozzles, Flange Connection 23 P V
- Coating and Insulation P V
- Grounding Connections P V
b. NDT ( as required ) P V
NDT Procedure NDT Report API 510
c. Thickness Measurement (*) P V

3 INTERNAL INSPECTION
( IF OFF-STREAM )
- Visual Inspection P V
Migas Regulation &
- Corrosion Mapping ( If any ) Inspection Report / Record P V
Inspection Procedure
- NDT ( as required ) P V
4 RUBBING/PHOTO NAME PLATE ASME NB - 23 NP Rubbing/Photo Record P V

5 REPORT
- Final Inspection Report Inspection Company Final Insection Report Client Spec / Code and AR P
Standard

6 - Issued Certificate of Inspection Inspection Company Certificate of Inspection Permen 18 tahun 2018 - P

Note :
1. Reference Document : Government Regulation, Code & Standard.
2. Verified Document : Document to be verified
3. Acceptance Criteria : Government Regulation, Code & Standard
LIST PERSONNEL
RECERTIFICATION OF PRESSURE VESSEL EQUIPMENT

No Nama Registration No. Published Date Expired Date Remark

1 SUROSO PS 112/IBT-R/MIGAS/2020 10-Nov-2020 10-Nov-2023 Migas Certificate


2 ARIEF PAMBUDI 243/IBT-R/MIGAS/2020 10-Nov-2020 10-Nov-2023 Migas Certificate
3 ZULKARNAIN 454/IBT-R/MIGAS/2020 10-Nov-2020 10-Nov-2023 Migas Certificate
LIST OF PRESSURE VESSEL
8 UNIT - MIGAS RECERTIFICATION
PT Berkah Gas Insani

No. Tag. No Serial No. Description of Equipment Exp. Date

1 SE-L001-D3 170980 Dryer Vessel 25-Feb-2015


2 SE-L001 170980 Dryer Vessel 14-Feb-2015
3 F-L01 FA-6818 Inlet Gas Filter 14-Feb-2015
4 SE-L002-D3 170979 Dryer Vessel 25-Feb-2015
5 SE-L002 170979 Dryer Vessel 14-Feb-2015
6 F-L01-D3 FA-6818 Inlet Gas Filter 25-Feb-2015
7 HE-L01-D3 13988 Heater 25-Feb-2015
8 HE-L02 13988 Heater 14-Feb-2015
OF PRESSURE VESSEL
- MIGAS RECERTIFICATION
PT Berkah Gas Insani

Location Remark
Activities Schedule Plan
1 unit Power Generator - Migas Recertification
PT Berkah Gas Insani

2021
No Activities days January February March April

W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

1 Jumlah Peralatan - 1 unit

2 Pre - Inspection Meeting 7

3 Inspection Test Plan Process 10

4 Review Document 7

5 Site Inspection 3

6 Migas Verification 4

7 Technical Inspection Reporting 30

8 Recertification License Process 5