EMK

PT. EPITERMA MAS INDONESIA

CONSTRUCTION - STRUCTURAL / INSTALLATION AND / OR ERECTION

Project Name:

Contract No: Equipment No:

Building Name:

Drawing No:

Specification No: -- Standard: -- Class: --

In Process Inspection / Activity Verification Signatures & Dates

Sup. / Inspec. Client Inspec.

1 Foundation checked and level / as per code requirements and


specs. Plinths, pedestal correctly located.

2 Scopes are as indicated on GA’s and parts drawings.


3 WPS,WPQR,ITPs approved and issued
4 Material check prior to installation. Each piece appropriately match
marked / columns, bracings, purlins, etc…

5 Surface treatment checked prior to installation and identified.


6 Cleats / hole centre’s checked before installation.
7 Ensure corrective measures are in place to appropriately repair any
misaligned holes prior to installation.

8 Allow for grouting before installation. (Packers installed) / grout


after columns installed and or portion of structure stiffened.

9 Check alignments and plumb erected steel.


10 Bolting to grade 8.8.
11 Any remedial work conducted during construction (burrs, slag.
spatter) appropriately cleaned prior to final surface treatment
(painting etc.)

12 Site painting to comply with the appropriate surface protection


specification.
Comments:

Completed By Approved By Accepted By

Company
Signature
Print Name
Date

1 of 10 Printed: 04/19/2021
EMI
PT. EPITERMA MAS INDONESIA

CONSTRUCTION - FONDATION INSPECTION

Project Name:

Contract No: Equipment No:

Building Name:

Drawing No:

Specification No: -- Standard: -- Class: --

Anchor bolt Levelling


No Point of foundation Drawing Actual L Remarks
TOC Packer
a b a b

Comments:

Completed By Approved By Accepted By

Company
Signature
Print Name
Date
EMK
PT. EPITERMA MAS KONSTRUKSI

TORQUE OF BOLT CHECKLIST

Project Name: TOKA TIDUNG 3MTPA EXPANSION PROJECT

Contract No: 1981/1500 Equipment No: N/A

Building Name: (085)LPB LOW PRESSURE BLOWER STEEL WORK

Drawing No: 085-SSDGA-0001(REV 0)

Specification No: Table 15.2.5.2 Standard: AS4100-1998 Class: 8.8 XOX

Momen of Torque Inspection


No. Size Length Grade
(K.n) Contractor Client
1 M 16 30 mm 8.8 XOX 95 K.n 1/3 turn
2 M 16 40 mm 8.8 XOX 95 K.n 1/3 turn
3 M 20 50 mm 8.8 XOX 145 K.n 1/3 turn
4 M 20 55 mm 8.8 XOX 145 K.n 1/3 turn
5 M 20 75 mm 8.8 XOX 145 K.n 1/3 turn
6
7
8
9
10
11
12
13
14
15

Comments:

Completed By Approved By Accepted By

Company
Signature
Print Name
Date
EMI
PT. EPITERMA MAS INDONESIA

SURVEY CHECK VERTICAL PLUMB COLOUMN REPORT

Project Name:

Contract No: Equipment No:

Building Name:

Drawing No:

Specification No: -- Standard: -- Class: --

Northing Easting
No. Coloumn Number Bottom Top Bottom Top Remarks
(mm) (mm) (mm) (mm)

Other
……………………………………………………………………………………………………………………………………………………….
……………………………………………………………………………………………………………………………………………………….
……………………………………………………………………………………………………………………………………………………….
Comments:

Completed By Approved By Accepted By

Company
Signature
Print Name
Date
EMI
PT. EPITERMA MAS INDONESIA

REQUEST FOR GROUTING

Project Name:

Contract No: Equipment No:

Building Name:

Drawing No:

Specification No: -- Standard: -- Class: --

ITEM NO. DESCRIPTION EMI AUSENCO


1 Plumb Data Survey Acceptable
2 Elevation
3 Centre Line
4 Orientation
5 HD Bolts
6 Packers/Shims
7 General Cleaning
8 Form Works
9 Bolt Tightened
10 Ciping of surface Concreted
11 Curing

Clear Rain Dusty/Windy


WEATHER

REQUEST FOR GROUTING


TYPE GROUTING :…………………………………….
QUANTITY :…………………………………….
TYPE OF MIXING :…………………………………….
DATE OF GROUTING :…………………………………….
Comments:

Completed By Approved By Accepted By

Company
Signature
Print Name
Date
EMI
PT. EPITERMA MAS INDONESIA

CONSTRUCTION - MATERIAL INSPECTION

Project Name:

Contract No: Equipment No:

Building Name:

Drawing No:

Verification Checks : YES NO

1 Received Material
2 Material Completed as Packing List
3 Each piece of the material appropriately match marked
4 Material quality as Spesification
5 Identified of Surface Treatment/painting

Remarks
………………………………………………………………………………………………………..………..………………………………..
………………………………………………………………………………………………………..………..………………………………..
………………………………………………………………………………………………………..………..………………………………..
………………………………………………………………………………………………………..………..………………………………..

Checked By Accepted By

Company
Signature
Print Name
Date