RIFQI RIZAL

CURRICULUM VITAE

PROFILE WORK EXPERIENCES


Name : Rifqi Rizal PT. Azbil Berca Indonesia
AUGUST 2018 - CURRENTLY
Date of Birth : Jakarta, 16th July 1996
Work as System Engineer. Doing Project for
Gender : Male
implementation DCS on Industrial
Religion : Moeslem
PT. Lentera Bumi Nusantara
Status : Single JULY 2017 - AUGUST 2017

Internship Program. Researching and design


Wind Turbine Controller 500W

PT. Prima Elektrindo


CONTACT FEBRUARY 2012 - MARCH 2012

Intership Program. Installing and Assembling


+62 857-7720-5026
Control Panel
r.rizal.fj@gmail.com

Jalan Jaha RT.011/01 No.10


Cilandak Timur, Jakarta EDUCATIONS
Selatan 12560
Politeknik Negeri Jakarta
AUGUST 2014 - OCTOBER 2018

D4 - Instrumentation & Control Engineering


SKILLS GPA : 3,64 of 4,00

DCS SMK Bunda Kandung


JULY 2011 - JULY 2014
PLC
Industrial Automation Engineering
Electrical Design National Exam : 36,2 of 40,0

LabVIEW

AutoCAD
AWARDS
Field Instruments Participant of the 28th National Student
Scientific Week (PIMNAS) at Halu Oleo
SCADA University - 2015
RIFQI RIZAL
PROJECT EXPERIENCES

DCS For Delta-i Project


AUGUST 2018 - APRIL 2019

Client : PT. JFE Engineering Indonesia


End User : PT. Idemitsu Lube Techno Indonesia
Industry : Oil & Gas
Location : Deltamas Cikarang
Task Make Graphic HMI for DCS
Perform Factory Acceptance Test (FAT)
Perform Site Acceptance Test (SAT) & Commissioning
Dispatch of Supervisor for ITV System (P3FH Project)
MAY 2019 - APRIL 2019

Client : Kawasaki Heavy Industries, Ltd


End User : PT. Aneka Tambang, Tbk
Industry : Mining
Location : Buli, Halmahera Timur
Task Commissioning ITV System
Function Test System
Upgrading & Retrofit DCS PF-1 Plant
SEPTEMBER 2019 - DECEMBER 2019

End User : PT. Petrokimia Gresik, Tbk


Industry : Chemical
Location : Gresik
Task Perform Factory Acceptance Test (FAT)
Supervisiory for Migration Old System to DCS System
Perform Site Acceptance Test (SAT) & Commissioning
Automation System for Bioethanol Project
JANUARY 2020 - CURRENTLY

Client : PT. Barata Indonesia


End User : PT. Energi Agro Nusantara
Industry : Refinery and Renewable Energy
Location : Mojokerto
Task Re-Programming DCS for new plant
Syncronization Between Exsisting System and DCS
Perform Factory Acceptance Test (FAT)
Perform Site Acceptance Test (SAT) and Commissioning
RIFQI RIZAL
SERVICE EXPERIENCES

Annual Shutdown Maintenance BTG-2


JANUARY 2019 - FEBRUARY 2019

End User : PT. Indonesia Toray Synthetics


Industry : Power Plant
Location : Tangerang
Task Maintenance I/O Module and Controller
Hydro Test
Start up Plant
Modification Function DCS
APRIL 2019

End User : PT. Asmo Indonesia


Industry : Automotive
Location : Cibitung
Task Modification Logic and Function DCS

Modification Oil Combustion


SEPTEMBER 2019

End User : PT. Asahimas Flat Glass, Tbk


Industry : Chemical
Location : Cikampek
Task Install new System Pack I/O for DCS
Install new DCS I/O Module
Additional Work for Delta-i Project
AUGUST 2019- NOVEMBER 2019

Client : PT. JFE Engineering Indonesia


End User : PT. Idemitsu Lube Techno Indoensia
Industry : Oil & Gas
Location : Deltamas Cikarang
Task Modification DCS Graphic HMI

Annual Shutdown Maintenance BTG-1


JANUARY 2020 - FEBRUARY 2020

End User : PT. Indonesia Toray Synthetics


Industry : Power Plant
Location : Tangerang
Task Maintenance I/O Module and Controller
Hydro Test
Start up Plant

You might also like