SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.

00 30-Apr-18

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Depressurization & Disposal of Hydrotest Water SAIC-A-2017 3-Jul-18 MECH.


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements

Depressurization is done slowly and safely after completion of test or on


GI-002.102,
A1 discovery of leaks. Bleed off the system slowly to an approved safe
Section 5.2.6
discharge area and monitor discharge.

Inspection ensures written procedures approved prior to testing are


followed upon disposal of any test medium containing chemical additives GI-002.102,
A2
for control of corrosion and bacteria. Section 5.2.7
Disposal methods follow SAEP-327, Section 4 requirements.

B Specific Disposal Requirements

New pipelines, and pipelines in gas service do not require oil/water SAEP-327,
B1
separation
Disposal ofprior to wastewater
wastewater discharge/disposal
to the terrestial environment is not permitted. Section 4.4
Wasteater can be dischared directly to sabkhah if provisions are met.
• The wastewater does not flow to the marine environment, or any of the
SAEP-327,
B2 ecologically sensitive areas listed above; and
Section 4.11
• The wastewater passes through an oil/water separator pond (Figure 1)
before it is discharged to the sabkhah to ensure retention of residual
hydrocarbon
As for subsequent
far as possible locate the collection andwithin
disposal site proper handling.
the existing pipeline
corridor while ensuring adequate pipeline access and without causing SAEP-327,
B3
damage to the existing roadways, pipelines, private entities or other Section 4.6
Disposal
structures to the Marine Environment
Dispose wastewater to the marine environment to the Arabian Gulf or Red
Sea in accordance with the criteria in Table 1 and SAES-A-103. Ensure
SAEP-327,
B4 adequate dispersal of wastewater in the marine environment by
Section 4.10
employing diffusers or similar technologies. Alternatively, transfer
wastewater onshore for treatment/disposal as per Sections 4.3 through
4.8.
Previously Used Approved Pond
Disposal to existing, previously used evaporation ponds requires
evaluation as a new disposal request. The volume, water quality, and SAEP-327,
B5
potential for contamination from additional disposal require a separate Section 4.9
evaluation as per this procedure.

Disposal to an Evaporation Pond


Oil/water separator ponds (Figure 1) are required upstream of evaporation
ponds (Figure 2) to collect residual hydrocarbon and improve evaporation SAEP-327,
B6
in the evaporation ponds. Evaporation ponds must meet the requirements Section 4.7
of SAES-A-104 Section 15.2. New evaporation ponds may require an
environmental impact assessment per SAEP-13.
Disposal to Industrial Wastewater Treatment Plant
Discharge wastewater directly to the local industrial wastewater treatment
plant if disposal does not affect the normal operations of the plant. Obtain SAEP-327,
B7
concurrence from the operator of the treatment plant prior to selection of Section 4.8
this disposal option. Disposal to Industrial Wastewater Treatment Plant
must meet the requirements of SAES-A-104.