Information Archieve - 2-3-2020
Information Archieve - 2-3-2020
FR/TC-DC-02
Bashundhara Bitumen
Dt. Of Issue Plant
16-Feb-2020
Technical Department
Rev. No. 00
Last Dt. Of
Document Name : Rev. **/**/****
Project Synopsis
Sketch of Bashundhara Bitumen Plant, associated units and respective raw and products are as below:
Bashundhara Oil & Gas Company Ltd. Doc. No. FR/TC-DC-02
1 320 Kton/A
2 Vacuum Distillation Unit (1120Kton/A) Full vacuum/ 390-370
0.003 Mpa
1 800 Kton/A
4 20000 m3
Tank Feed rate from
Heating by Jetty-650
8 Crude Oil Tank (110,000 m3) 0.101325 40~50
Steam m3/hr.Process feed
2 15000m3 rate 62.5m3/hr.
Furnace oil/ Fuel Oil/ Heavy Oil Tank Farm- 2 Filling rate from
11 4 5000 m3
(20,000 m3) process 5m3/hr.
0.101325 60~70
Delivery rate 60
12 Furnace oil/ Fuel Oil/ Heavy Oil Tank Farm- 3 4 15000 m3 m3/hr
(60,000 m3)
1 500 m3
Heating by Delivery rate
13 Slop Tank (25,00 m3) 0.101325 60~70
Thermal Oil 60m3/hr
2 2000 m3
Fuel Consumption -
16 ADU Furnace 1 8 MMkcal 0.2 365 60 hg/hr
Fuel Consumption -
17 VDU Furnace 1 3 MMKcal 0.01 365 24 hg/hr
Sl. No. Units V- 2401~2408 V- 2201~2204 V- 2301~2304 V- 2205~2206 V- 2305 V- 2101~2104 Remarks
3 Number Of Tank 8 4 4 2 1 4
6 Diameter, m 20 25 25 16 8.92 38
10 Circumference, m 63 79 79 50 28 119
17
Time Required To Safe Filling
Height, hr
121 481 481 211 - 30
19
Difference In Height Between
Max & Safe Filling Height, m
0.65 0.17 0.57 0.24 - 0.41
20
Time Required To Reach Safe To
Maximum Filling Height, min
467.62 500.69 1672.9 293.15 - 43.03
The produced bitumen will be transferred from bitumen storage tanks to drum production unit and refilled into drums of different dimensions and
sizes for loading to customer ends.
150 kg drum 03 drums/min 14 drums/min Operable capacity 19200 ton 29600 ton
150kg drum 180kg drum No. of Drum produced per day 10080 Pcs
Mix Delivery
100% 0%
Phase 1 6000 drums 0 drum Drum requirement per day Phase 1 Phase 1 & 2
Jetty at a glance
Bitumen Plant of Bashundhara Oil and Gas Company Ltd. has got a 220 meter long jetty for loading & unloading of petroleum products. It has the
capacity to berth two 5000DWT oil ships at the same time. There are three DN300 and one DN200 loading & unloading arms for loading & unloading
operation.
Design Parameters
Diameter DN300/DN200
Maintenance (Electrical)
There are 1 main substation and 5 distribution substation for power supply at different locations of BOGCL plant.
Emergency DG Set
Voltage: 11 KV
2 33/11 KV 1 set
Dyn 11
33 KV Switchboard
11 KV Switchboard
Dt. Of
Bashundhara Bitumen Plant Issue
16-Feb-2020
BOGCL operation will be carried out from the fire proof control room through DCS (Distributed Control System). Both phase-1
and 2 operation facilities are accomodated from the same control room.
Brand : Hollysys
Number of Operator Panel : 5
Number of Control Cabinet : 2
Number of Extension Cabinet : 1
Number of Operating Station : 3
Number of Historical Station : 1
Number of Engineering Work Station : 1
Number of HMI’s : 3
For Phase 1: 1 Nos
For Phase 2: 1 Nos
For Camera : 1 Nos
Bashundhara Oil & Gas Company Ltd.
Doc. No. FR/TC-DC-02
Maintenance (Mechanical)
The purpose of the mechanical workshop is to carry-out the routine maintenance of the stationary and rotating
equipment and troubleshoot while necessary. BOGCL maintenance workshop is facilitated with the following machine
and tools.
1 Lathe machine 3
2 Shaping Machine 1
4 Slotting Machine 1
8 Bench grinder 2
9 Balancing Machine 1
10 Slotting Machine 1
Bashundhara Oil & Gas Company Ltd. Doc. No. FR/TC-DC-02
Utlility at a glance
BOGCL utility consists of Fresh water supply, Reverse Osmosis unit, three boilers (one thermal and two steam), compressor unit and
cooling tower.
Boiler Hydro test Pressure: 1.65Mpa Circulation pump 200m3/h, 60m head
Dt. Of
Bashundhara Bitumen Plant Issue
16-Feb-2020
NH-N: ≤120mg/L; - Suspended solids: ≤500mg/L; Two Stage oil-separated sedimentation tank
Laboratory Facilities
The following experiments and characterizations of raw and products are available under BOGCL QC department.
17 Blender GB Method -
49 PH meter GB Method pH
** COD, Ammonia nitrogen, Total Phosphorus, Total nitrogen, Chromaticity, Turbidity, suspended solid Iron, Hexavalent chromium, Total
chromium, Zn,Cu, Ni, F, CN.
*** Chloride, Sulfide, Phenol, Aniline, Mn, Hg, Pb, Al, SS, Ad-Anaonic detergent.
Bashundhara Oil & Gas Company Ltd. Doc. No. FR/TC-DC-02
The purpose of emmergency fire management system is to suuport the plant for incident free operation and ensure proper respose during any emmergency. The capacity of
the fire management system is as below:
Fire Water Reservoir 5 9450 m3 two 2500m3 fire water reservoir, one 2300m3 fresh water pool &
two rainwater pool of 2150m3 (1800m3 + 350m3)
Power: 11.95 kW
Pressure stabilizer pump 2 Flow rate: 30m3/h Head: 100m
3
Electric Pump 2 Flow rate: 432m3/h Power: 220 kW
Head: 100m
Power: 280 kW
Diesel Engine pump 2 Flow rate: 432m3/h Head: 105m
Each circle
Water Spray System
4 (Only in Crude Tank)
contains 80 6 L/min Working pressure: 2 Bar
sprays
Foam Extinguisher
Spray Duration (s) :.30 sec
31 25 L
Working range(m) : 6 m
13 Explosion-proof camera
8
SL No. Fire Fighting Equipment Quantity Capacity Specifications Remarks
Fire monitoring & covers all around the plant to monitor and announce if any fire
announcing system Explosion-proof manual fire alarm incident happens in the plant
39 button
8
6 Water and dust proof camera