CAPITAL DEVELOPMENT AUTHORITY

(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


6th Running Bill
Period 22-11-18 to 30-11-18

Sr # BoQ # Description Qty. Price Unit Amount

PCC in foundation: Providing and laying PCC (1:4:8) cement


concrete using graded crush aggregate 1" and down guage,
c 6 approved lawrencepur sand, incl levelling, compacting and curing , 8.25 171.00 P.cft Rs 1,410.75
in foundations etc. complete in all respects as per
drawings.Technical Provisions and or as directed by the Engineer.

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
12 (2feet long steel tie bars at every 6th course of brick masonry at 13,072.42 234.00 P.cft Rs 3,058,946.28
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
(2feet long steel tie bars at every 6th course of brick masonry at
13 903.39 239.00 P.cft Rs 215,910.21
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.
'4-1/2" thick wall

Reinforced Cement Concrete: Providing and laying reinforced


cement concrete cast-in-situ using ordinary portland cement having
4000 psi cylinder strenght using screened graded crushed aggregate
3/4'' and down guage (as per mix design) approved Lawrencepur
14 78.96 332.00 P.cft Rs 26,214.72
sand in Raft, Foundations / Footings of Columns, walls Minaret etc
incl vibrating using Formwork and its removal (but excl the cost of
steel reinforcement), complete in all respects as per drawings,
Same as Provisions and or as directed by the Engineer.
Technical
above
but
reinforce
d cement
17 concrete 238.21 394.00 P.cft Rs 93,854.74
4000 psi
in
Steel Reinforcement: Providing, fabricating and laying steel
Columns
reinforcement
as per bars incl the cost of straightning, cutting, bending,
drawing.
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 29.67 105,695.00 M.Ton Rs 3,135,970.65
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Marble Flooring P/L 20-22 mm thick ziarat white marble flooring


24x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4) i/c 1-
1/4'' thick PCC (1:2:4) compacting filling the joints with white
34 23,631.70 974.00 P.sft Rs 23,017,275.80
cementted pigment grouting chemical polishing cement slurry etc
complete in all respects as per drawings technical provisions and or
as direscted by the Engineer.

same as above but 20-22 mm thick ziarat white marble size 12x24
35 16,164.72 410.00 P.sft Rs 6,627,535.20
complete in all respects.

same as above but 20-22 mm thick Jet Black marble size 24x3
36 1,316.07 250.00 P.sft Rs 329,017.50
complete in all respects.
P/L 10-12 mm thick ziarat white marble tiles dado pre polished on
walls 12x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4)
38 filling the joints with white cementted pigment grouting chemical 16,623.53 235.00 P.sft Rs 3,906,529.55
polishing cement slurry etc complete in all respects as per drawings
technical provisions and or as direscted by the Engineer.

Surface Rendering Providing and applying 1/2'' thick cement plaster


(1:4) on ceilings, sides, and soffits of exposed beams etc. i/c
65 making, edges, corners, grooves, curing, scaffolding etc. at any 109,658.34 30.00 P.sft Rs 3,289,750.20
height, complete in all respects as per drawings, Technical
Provisions and or as directed by the Engineer.

Surface Rendering Providing and applying 1/2''-3/4'' thick cement


plaster (1:4) on internal and external sides of walls, columns,
66 exposed concrete surfaces making, edges, corners, grooves, curing, 52,681.54 34.00 P.sft Rs 1,791,172.36
scaffolding etc. at any height, complete in all respects as per
drawings, Technical Provisions and or as directed by the Engineer.

Total Rs 45,493,587.96

5.83% above as per Agreement. Rs 2,652,276.18

Total-I Rs 48,145,864.14

Rs 14,388.86

Sub-Engr Dy. Director


Roads-IV, CDA Roads-IV, CDA
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


7th Running Bill
Period 26-04-19 to 30-04-19

Sr # BoQ # Description Qty. Price Unit Amount

PCC in foundation: Providing and laying PCC (1:4:8) cement


concrete using graded crush aggregate 1" and down guage,
1 6 approved lawrencepur sand, incl levelling, compacting and curing , 8.25 171.00 P.cft Rs 1,410.75
in foundations etc. complete in all respects as per
drawings.Technical Provisions and or as directed by the Engineer.

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
(2feet long steel tie bars at every 6th course of brick masonry at
2 13 903.39 239.00 P.cft Rs 215,910.21
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.
'4-1/2" thick wall

Reinforced Cement Concrete: Providing and laying reinforced


cement concrete cast-in-situ using ordinary portland cement having
4000 psi cylinder strenght using screened graded crushed aggregate
3/4'' and down guage (as per mix design) approved Lawrencepur
3 14 78.96 332.00 P.cft Rs 26,214.72
sand in Raft, Foundations / Footings of Columns, walls Minaret etc
incl vibrating using Formwork and its removal (but excl the cost of
steel reinforcement), complete in all respects as per drawings,
Technical Provisions and or as directed by the Engineer.

4 17 Same as above but reinforced cement concrete 4000 psi in Columns 238.21 394.00 P.cft Rs 93,854.74
as per drawing.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
5 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 5.00 105,695.00 M.Ton Rs 528,475.00
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Total Rs 865,865.42

5.83% above as per Agreement. Rs 50,479.95

Total-I Rs 916,345.37

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


7th Running Bill
Period 01-05-19 to 31-05-19

Sr # BoQ # Description Qty. Price Unit Amount

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
1 12 (2feet long steel tie bars at every 6th course of brick masonry at 1,867.49 234.00 P.cft Rs 436,992.33
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
2 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 3.58 105,695.00 M.Ton Rs 378,539.09
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Marble Flooring P/L 20-22 mm thick ziarat white marble flooring


24x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4) i/c 1-
1/4'' thick PCC (1:2:4) compacting filling the joints with white
3 34 3,375.96 974.00 P.sft Rs 3,288,182.26
cementted pigment grouting chemical polishing cement slurry etc
complete in all respects as per drawings technical provisions and or
as direscted by the Engineer.

same as above but 20-22 mm thick ziarat white marble size 12x24
4 35 2,309.25 410.00 P.sft Rs 946,790.74
complete in all respects.

same as above but 20-22 mm thick Jet Black marble size 24x3
5 36 188.01 250.00 P.sft Rs 47,002.50
complete in all respects.

P/L 10-12 mm thick ziarat white marble tiles dado pre polished on
walls 12x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4)
6 38 filling the joints with white cementted pigment grouting chemical 2,374.79 235.00 P.sft Rs 558,075.65
polishing cement slurry etc complete in all respects as per drawings
technical provisions and or as direscted by the Engineer.

Surface Rendering Providing and applying 1/2'' thick cement plaster


(1:4) on ceilings, sides, and soffits of exposed beams etc. i/c
7 65 making, edges, corners, grooves, curing, scaffolding etc. at any 15,665.48 30.00 P.sft Rs 469,964.31
height, complete in all respects as per drawings, Technical
Provisions and or as directed by the Engineer.

Surface Rendering Providing and applying 1/2''-3/4'' thick cement


plaster (1:4) on internal and external sides of walls, columns,
8 66 exposed concrete surfaces making, edges, corners, grooves, curing, 7,525.93 34.00 P.sft Rs 255,881.77
scaffolding etc. at any height, complete in all respects as per
drawings, Technical Provisions and or as directed by the Engineer.

Total Rs 6,381,428.65

5.83% above as per Agreement. Rs 372,037.29

Total-I Rs 6,753,465.94

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


7th Running Bill
Period 01-06-19 to 30-06-19

Sr # BoQ # Description Qty. Price Unit Amount

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
1 12 (2feet long steel tie bars at every 6th course of brick masonry at 1,967.49 234.00 P.cft Rs 460,392.33
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
2 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 2.88 105,695.00 M.Ton Rs 304,552.59
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Marble Flooring P/L 20-22 mm thick ziarat white marble flooring


24x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4) i/c 1-
1/4'' thick PCC (1:2:4) compacting filling the joints with white
3 34 3,475.96 974.00 P.sft Rs 3,385,582.26
cementted pigment grouting chemical polishing cement slurry etc
complete in all respects as per drawings technical provisions and or
as direscted by the Engineer.

same as above but 20-22 mm thick ziarat white marble size 12x24
4 35 2,409.25 410.00 P.sft Rs 987,790.74
complete in all respects.

same as above but 20-22 mm thick Jet Black marble size 24x3
5 36 238.01 250.00 P.sft Rs 59,502.50
complete in all respects.

P/L 10-12 mm thick ziarat white marble tiles dado pre polished on
walls 12x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4)
6 38 filling the joints with white cementted pigment grouting chemical 2,474.79 235.00 P.sft Rs 581,575.65
polishing cement slurry etc complete in all respects as per drawings
technical provisions and or as direscted by the Engineer.

Surface Rendering Providing and applying 1/2'' thick cement plaster


(1:4) on ceilings, sides, and soffits of exposed beams etc. i/c
7 65 making, edges, corners, grooves, curing, scaffolding etc. at any 15,665.48 30.00 P.sft Rs 469,964.31
height, complete in all respects as per drawings, Technical
Provisions and or as directed by the Engineer.

Surface Rendering Providing and applying 1/2''-3/4'' thick cement


plaster (1:4) on internal and external sides of walls, columns,
8 66 exposed concrete surfaces making, edges, corners, grooves, curing, 7,625.93 34.00 P.sft Rs 259,281.77
scaffolding etc. at any height, complete in all respects as per
drawings, Technical Provisions and or as directed by the Engineer.

Total Rs 6,508,642.15

5.83% above as per Agreement. Rs 379,453.84

Total-I Rs 6,888,095.99
Contractor's Rep Quantity Surveyor Resident Engineer
ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


7th Running Bill
Period 01-07-19 to 31-07-19

Sr # BoQ # Description Qty. Price Unit Amount

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
1 12 (2feet long steel tie bars at every 6th course of brick masonry at 2,017.49 234.00 P.cft Rs 472,092.33
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
2 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 4.21 105,695.00 M.Ton Rs 445,126.94
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Marble Flooring P/L 20-22 mm thick ziarat white marble flooring


24x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4) i/c 1-
1/4'' thick PCC (1:2:4) compacting filling the joints with white
3 34 3,525.96 974.00 P.sft Rs 3,434,282.26
cementted pigment grouting chemical polishing cement slurry etc
complete in all respects as per drawings technical provisions and or
as direscted by the Engineer.

same as above but 20-22 mm thick ziarat white marble size 12x24
4 35 2,459.25 410.00 P.sft Rs 1,008,290.74
complete in all respects.

same as above but 20-22 mm thick Jet Black marble size 24x3
5 36 238.01 250.00 P.sft Rs 59,502.50
complete in all respects.

P/L 10-12 mm thick ziarat white marble tiles dado pre polished on
walls 12x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4)
6 38 filling the joints with white cementted pigment grouting chemical 2,524.79 235.00 P.sft Rs 593,325.65
polishing cement slurry etc complete in all respects as per drawings
technical provisions and or as direscted by the Engineer.

Surface Rendering Providing and applying 1/2'' thick cement plaster


(1:4) on ceilings, sides, and soffits of exposed beams etc. i/c
7 65 making, edges, corners, grooves, curing, scaffolding etc. at any 17,665.48 30.00 P.sft Rs 529,964.31
height, complete in all respects as per drawings, Technical
Provisions and or as directed by the Engineer.

Surface Rendering Providing and applying 1/2''-3/4'' thick cement


plaster (1:4) on internal and external sides of walls, columns,
8 66 exposed concrete surfaces making, edges, corners, grooves, curing, 9,125.93 34.00 P.sft Rs 310,281.77
scaffolding etc. at any height, complete in all respects as per
drawings, Technical Provisions and or as directed by the Engineer.

Total Rs 6,852,866.50

5.83% above as per Agreement. Rs 399,522.12

Total-I Rs 7,252,388.62
Contractor's Rep Quantity Surveyor Resident Engineer
ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


7th Running Bill
Period 01-08-19 to 31-08-19

Sr # BoQ # Description Qty. Price Unit Amount

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
1 12 (2feet long steel tie bars at every 6th course of brick masonry at 1,987.49 234.00 P.cft Rs 465,072.33
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
2 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 3.88 105,695.00 M.Ton Rs 410,247.59
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Marble Flooring P/L 20-22 mm thick ziarat white marble flooring


24x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4) i/c 1-
1/4'' thick PCC (1:2:4) compacting filling the joints with white
3 34 3,495.96 974.00 P.sft Rs 3,405,062.26
cementted pigment grouting chemical polishing cement slurry etc
complete in all respects as per drawings technical provisions and or
as direscted by the Engineer.

same as above but 20-22 mm thick ziarat white marble size 12x24
4 35 2,324.25 410.00 P.sft Rs 952,940.74
complete in all respects.

same as above but 20-22 mm thick Jet Black marble size 24x3
5 36 138.01 250.00 P.sft Rs 34,502.50
complete in all respects.

P/L 10-12 mm thick ziarat white marble tiles dado pre polished on
walls 12x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4)
6 38 filling the joints with white cementted pigment grouting chemical 2,624.79 235.00 P.sft Rs 616,825.65
polishing cement slurry etc complete in all respects as per drawings
technical provisions and or as direscted by the Engineer.

Surface Rendering Providing and applying 1/2'' thick cement plaster


(1:4) on ceilings, sides, and soffits of exposed beams etc. i/c
7 65 making, edges, corners, grooves, curing, scaffolding etc. at any 17,665.48 30.00 P.sft Rs 529,964.31
height, complete in all respects as per drawings, Technical
Provisions and or as directed by the Engineer.

Surface Rendering Providing and applying 1/2''-3/4'' thick cement


plaster (1:4) on internal and external sides of walls, columns,
8 66 exposed concrete surfaces making, edges, corners, grooves, curing, 5,725.93 34.00 P.sft Rs 194,681.77
scaffolding etc. at any height, complete in all respects as per
drawings, Technical Provisions and or as directed by the Engineer.

Total Rs 6,609,297.15

5.83% above as per Agreement. Rs 385,322.02

Total-I Rs 6,994,619.17

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


7th Running Bill
Period 01-09-19 to 30-09-19

Sr # BoQ # Description Qty. Price Unit Amount

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
1 12 (2feet long steel tie bars at every 6th course of brick masonry at 1,637.49 234.00 P.cft Rs 383,172.33
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
2 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 3.76 105,695.00 M.Ton Rs 397,564.19
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Marble Flooring P/L 20-22 mm thick ziarat white marble flooring


24x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4) i/c 1-
1/4'' thick PCC (1:2:4) compacting filling the joints with white
3 34 3,595.96 974.00 P.sft Rs 3,502,462.26
cementted pigment grouting chemical polishing cement slurry etc
complete in all respects as per drawings technical provisions and or
as direscted by the Engineer.

same as above but 20-22 mm thick ziarat white marble size 12x24
4 35 2,501.25 410.00 P.sft Rs 1,025,510.74
complete in all respects.

same as above but 20-22 mm thick Jet Black marble size 24x3
5 36 273.01 250.00 P.sft Rs 68,252.50
complete in all respects.

P/L 10-12 mm thick ziarat white marble tiles dado pre polished on
walls 12x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4)
6 38 filling the joints with white cementted pigment grouting chemical 2,254.79 235.00 P.sft Rs 529,875.65
polishing cement slurry etc complete in all respects as per drawings
technical provisions and or as direscted by the Engineer.

Surface Rendering Providing and applying 1/2'' thick cement plaster


(1:4) on ceilings, sides, and soffits of exposed beams etc. i/c
7 65 making, edges, corners, grooves, curing, scaffolding etc. at any 17,665.48 30.00 P.sft Rs 529,964.31
height, complete in all respects as per drawings, Technical
Provisions and or as directed by the Engineer.

Surface Rendering Providing and applying 1/2''-3/4'' thick cement


plaster (1:4) on internal and external sides of walls, columns,
8 66 exposed concrete surfaces making, edges, corners, grooves, curing, 6,325.93 34.00 P.sft Rs 215,081.77
scaffolding etc. at any height, complete in all respects as per
drawings, Technical Provisions and or as directed by the Engineer.

Total Rs 6,651,883.75

5.83% above as per Agreement. Rs 387,804.82

Total-I Rs 7,039,688.57

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


7th Running Bill
Period 01-10-19 to 30-10-19

Sr # BoQ # Description Qty. Price Unit Amount

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
1 12 (2feet long steel tie bars at every 6th course of brick masonry at 2,097.49 234.00 P.cft Rs 490,812.33
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
2 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 3.38 105,695.00 M.Ton Rs 357,400.09
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Marble Flooring P/L 20-22 mm thick ziarat white marble flooring


24x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4) i/c 1-
1/4'' thick PCC (1:2:4) compacting filling the joints with white
3 34 3,185.96 974.00 P.sft Rs 3,103,122.26
cementted pigment grouting chemical polishing cement slurry etc
complete in all respects as per drawings technical provisions and or
as direscted by the Engineer.

same as above but 20-22 mm thick ziarat white marble size 12x24
4 35 2,144.25 410.00 P.sft Rs 879,140.74
complete in all respects.

same as above but 20-22 mm thick Jet Black marble size 24x3
5 36 119.01 250.00 P.sft Rs 29,752.50
complete in all respects.

P/L 10-12 mm thick ziarat white marble tiles dado pre polished on
walls 12x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4)
6 38 filling the joints with white cementted pigment grouting chemical 2,594.79 235.00 P.sft Rs 609,775.65
polishing cement slurry etc complete in all respects as per drawings
technical provisions and or as direscted by the Engineer.

Surface Rendering Providing and applying 1/2'' thick cement plaster


(1:4) on ceilings, sides, and soffits of exposed beams etc. i/c
7 65 making, edges, corners, grooves, curing, scaffolding etc. at any 17,465.48 30.00 P.sft Rs 523,964.31
height, complete in all respects as per drawings, Technical
Provisions and or as directed by the Engineer.

Surface Rendering Providing and applying 1/2''-3/4'' thick cement


plaster (1:4) on internal and external sides of walls, columns,
8 66 exposed concrete surfaces making, edges, corners, grooves, curing, 9,425.93 34.00 P.sft Rs 320,481.77
scaffolding etc. at any height, complete in all respects as per
drawings, Technical Provisions and or as directed by the Engineer.

Total Rs 6,314,449.65

5.83% above as per Agreement. Rs 368,132.41

Total-I Rs 6,682,582.06
Contractor's Rep Quantity Surveyor Resident Engineer
ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


7th Running Bill
Period 01-11-19 to 20-11-19

Sr # BoQ # Description Qty. Price Unit Amount

Brick Masonry in super structure: P/L first class solid burnt


bricks masonry set in cement mortor 1:6 in strainght or curved walls
9'' and above thickness at any height /level i/c the cost of 3/8'' dia
1 12 (2feet long steel tie bars at every 6th course of brick masonry at 1,497.49 234.00 P.cft Rs 350,412.33
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
2 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 2.97 105,695.00 M.Ton Rs 314,065.14
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Marble Flooring P/L 20-22 mm thick ziarat white marble flooring


24x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4) i/c 1-
1/4'' thick PCC (1:2:4) compacting filling the joints with white
3 34 2,975.96 974.00 P.sft Rs 2,898,582.26
cementted pigment grouting chemical polishing cement slurry etc
complete in all respects as per drawings technical provisions and or
as direscted by the Engineer.

same as above but 20-22 mm thick ziarat white marble size 12x24
4 35 2,017.25 410.00 P.sft Rs 827,070.74
complete in all respects.

same as above but 20-22 mm thick Jet Black marble size 24x3
5 36 122.01 250.00 P.sft Rs 30,502.50
complete in all respects.

P/L 10-12 mm thick ziarat white marble tiles dado pre polished on
walls 12x24 of approved quality i/c a base of 3/4'' c.s mortor (1:4)
6 38 filling the joints with white cementted pigment grouting chemical 1,774.79 235.00 P.sft Rs 417,075.65
polishing cement slurry etc complete in all respects as per drawings
technical provisions and or as direscted by the Engineer.

Surface Rendering Providing and applying 1/2'' thick cement plaster


(1:4) on ceilings, sides, and soffits of exposed beams etc. i/c
7 65 making, edges, corners, grooves, curing, scaffolding etc. at any 7,865.48 30.00 P.sft Rs 235,964.31
height, complete in all respects as per drawings, Technical
Provisions and or as directed by the Engineer.

Surface Rendering Providing and applying 1/2''-3/4'' thick cement


plaster (1:4) on internal and external sides of walls, columns,
8 66 exposed concrete surfaces making, edges, corners, grooves, curing, 6,925.93 34.00 P.sft Rs 235,481.77
scaffolding etc. at any height, complete in all respects as per
drawings, Technical Provisions and or as directed by the Engineer.

Total Rs 5,309,154.70

5.83% above as per Agreement. Rs 309,523.72

Total-I Rs 5,618,678.42
Contractor's Rep Quantity Surveyor Resident Engineer
ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.7 Duration 16-04-19 to 30-04-19

A 0.510 i
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


16/Apr/2019 30/Apr/2019 2/Apr/2019 15 0.160 700 850 0.19429
15 B 0.19429 ii
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

16/Apr/2019 30/Apr/2019 2/Apr/2019 15 0.080 550.00 585.00 0.08509

15 C 0.08509 iii
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


16/Apr/2019 30/Apr/2019 2/Apr/2019 15 0.200 68,500 92,500 0.27007
15 D 0.27007 iv
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


16/Apr/2019 30/Apr/2019 2/Apr/2019 15 0.050 80.48 117.43 0.07296
15 E 0.07296 v

Total Adjustment (A+B+C+D+E)= 1.13241

Net Adjustment (Increased) Pn= 0.13241

%age= 13.2406

Net Amount of Work Done,Rs= 916,345

TOTAL Price Adjustment,Rs= 121,329

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 825
550 610
68500 92500
80.48 112.94

1.13

1.000

#VALUE! 3016424

#VALUE!

3251405.61

#VALUE!
1742911.69
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.7 Duration 01-05-19 to 31-05-19

A 0.510 i
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/May/2019 31/May/2019 3/May/2019 31 0.160 700 850 0.19429
31 B 0.19429 ii
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

1/May/2019 31/May/2019 3/May/2019 31 0.080 550.00 585.00 0.08509

31 C 0.08509 iii
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/May/2019 31/May/2019 3/May/2019 31 0.200 68,500 92,500 0.27007
31 D 0.27007 iv
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/May/2019 31/May/2019 3/May/2019 31 0.050 80.48 117.43 0.07296
31 E 0.07296 v

Total Adjustment (A+B+C+D+E)= 1.13241

Net Adjustment (Increased) Pn= 0.13241

%age= 13.2406

Net Amount of Work Done,Rs= 6,753,466

TOTAL Price Adjustment,Rs= 894,197

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 825
550 610
68500 92500
80.48 112.94

1.13

1.000

#VALUE! 3016424

#VALUE!

3251405.61

#VALUE!
1742911.69
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.7 Duration 01-06-19 to 30-06-19

A 0.510 i
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jun/2019 30/Jun/2019 2/Jun/2019 30 0.160 700 850 0.19429
30 B 0.19429 ii
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

1/Jun/2019 30/Jun/2019 2/Jun/2019 30 0.080 550.00 540.00 0.07855

30 C 0.07855 iii
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jun/2019 30/Jun/2019 2/Jun/2019 30 0.200 68,500 92,500 0.27007
30 D 0.27007 iv
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jun/2019 30/Jun/2019 2/Jun/2019 30 0.050 80.48 122.32 0.07599
30 E 0.07599 v

Total Adjustment (A+B+C+D+E)= 1.12890

Net Adjustment (Increased) Pn= 0.12890

%age= 12.8898

Net Amount of Work Done,Rs= 6,888,096

TOTAL Price Adjustment,Rs= 887,863

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 850
550 540
68500 92500
80.48 122.32

1.13

1.000

#VALUE! 3016424

#VALUE!

3251405.61

#VALUE!
1742911.69
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.7 Duration 01-07-19 to 31-07-19

A 0.510 i
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jul/2019 31/Jul/2019 3/Jul/2019 31 0.160 700 950 0.21714
31 B 0.21714 ii
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

1/Jul/2019 31/Jul/2019 3/Jul/2019 31 0.080 550.00 620.00 0.09018

31 C 0.09018 iii
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jul/2019 31/Jul/2019 3/Jul/2019 31 0.200 68,500 117,000 0.34161
31 D 0.34161 iv
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jul/2019 31/Jul/2019 3/Jul/2019 31 0.050 80.48 126.82 0.07879
31 E 0.07879 v

Total Adjustment (A+B+C+D+E)= 1.23772

Net Adjustment (Increased) Pn= 0.23772

%age= 23.7720

Net Amount of Work Done,Rs= 7,252,389

TOTAL Price Adjustment,Rs= 1,724,040

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 950
550 620
68500 117000
80.48 126.82

1.24

1.000

#VALUE! 3016424

#VALUE!

3251405.61

#VALUE!
1742911.69
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.7 Duration 01-08-19 to 31-08-19

A 0.510 i
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Aug/2019 31/Aug/2019 3/Aug/2019 31 0.160 700 950 0.21714
31 B 0.21714 ii
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

1/Aug/2019 31/Aug/2019 3/Aug/2019 31 0.080 550.00 565.00 0.08218

31 C 0.08218 iii
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Aug/2019 31/Aug/2019 3/Aug/2019 31 0.200 68,500 115,000 0.33577
31 D 0.33577 iv
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Aug/2019 31/Aug/2019 3/Aug/2019 31 0.050 80.48 132.47 0.08230
31 E 0.08230 v

Total Adjustment (A+B+C+D+E)= 1.22739

Net Adjustment (Increased) Pn= 0.22739

%age= 22.7391

Net Amount of Work Done,Rs= 6,994,619

TOTAL Price Adjustment,Rs= 1,590,514

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 950
550 565
68500 115000
80.48 132.47

1.23

1.000

#VALUE! 3016424

#VALUE!

3251405.61

#VALUE!
1742911.69
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.7 Duration 01-09-19 to 30-09-19

A 0.510 i
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Sep/2019 30/Sep/2019 2/Sep/2019 30 0.160 700 965 0.22068
30 B 0.22068 ii
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

1/Sep/2019 30/Sep/2019 2/Sep/2019 30 0.080 550.00 543.31 0.07903

30 C 0.07903 iii
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Sep/2019 30/Sep/2019 2/Sep/2019 30 0.200 68,500 113,997 0.33284
30 D 0.33284 iv
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Sep/2019 30/Sep/2019 2/Sep/2019 30 0.050 80.48 127.14 0.07899
30 E 0.07899 v

Total Adjustment (A+B+C+D+E)= 1.22154

Net Adjustment (Increased) Pn= 0.22154

%age= 22.1537

Net Amount of Work Done,Rs= 7,039,689

TOTAL Price Adjustment,Rs= 1,559,552

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 965.49
550 543.31
68500 113997.08
80.48 127.14

1.22

1.000

#VALUE! 3016424

#VALUE!

3251405.61

#VALUE!
1742911.69
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.7 Duration 01-10-19 to 31-10-19

A 0.510 i
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Oct/2019 31/Oct/2019 3/Oct/2019 31 0.160 700 965 0.22068
31 B 0.22068 ii
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

1/Oct/2019 31/Oct/2019 3/Oct/2019 31 0.080 550.00 550.00 0.08000

31 C 0.08000 iii
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Oct/2019 31/Oct/2019 3/Oct/2019 31 0.200 68,500 108,997 0.31824
31 D 0.31824 iv
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Oct/2019 31/Oct/2019 3/Oct/2019 31 0.050 80.48 127.14 0.07899
31 E 0.07899 v

Total Adjustment (A+B+C+D+E)= 1.20791

Net Adjustment (Increased) Pn= 0.20791

%age= 20.7911

Net Amount of Work Done,Rs= 6,682,582

TOTAL Price Adjustment,Rs= 1,389,384

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 965.49
550 550
68500 108996.94
80.48 127.14

1.21

1.000

#VALUE! 3016424

#VALUE!

3251405.61

#VALUE!
1742911.69
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.7 Duration 01-11-19 to 20-11-19

A 0.510 i
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Nov/2019 20/Nov/2019 23/Oct/2019 20 0.160 700 965 0.22068
20 B 0.22068 ii
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

1/Nov/2019 20/Nov/2019 23/Oct/2019 20 0.080 550.00 550.00 0.08000

20 C 0.08000 iii
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Nov/2019 20/Nov/2019 23/Oct/2019 20 0.200 68,500 108,997 0.31824
20 D 0.31824 iv
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days Remarks
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Nov/2019 20/Nov/2019 23/Oct/2019 20 0.050 80.48 127.14 0.07899
20 E 0.07899 v

Total Adjustment (A+B+C+D+E)= 1.20791

Net Adjustment (Increased) Pn= 0.20791

%age= 20.7911

Net Amount of Work Done,Rs= 5,618,678

TOTAL Price Adjustment,Rs= 1,168,186

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 965.49
550 550
68500 108996.94
80.48 127.14

1.21

1.000

#VALUE! 3016424

#VALUE!

3251405.61
9,335,065
10,185,785 #VALUE!
10071744 1742911.69

You might also like