WORKS - 2,927,690.00 2,927,690.00
CONTRACT PREMIUM @
2
5.83% 18,019,050.00 2,719,176.00 20,738,226.00
W/H:Rs.1,616,345 +
4 Escalation Claim 22,002,094.00 21,137,194.90 43,139,288.90 Rs.19,542,849.90 =
Rs.21,137,195/-
F/R=960/sft
i Marble 24x24 , 4,131,360.00 PR=720/sft
519532402.xlsx / Summary QS (ZKHB) QS (PEPAC Pvt Ltd) Resident Engineer(PEPAC Pvt Ltd) 1 of 12
Page 2 of 12
Bill Item Description Previous IPC This IPC Amount Total To Date IPC Remarks
No. Amount Amount
F/R=230/sft
iv Marble Tile dado:= 423,497.85 PR=172.50/sft
5% of Contract
5 LESS R/MONEY @ 5% = 20,022,287.00 (20,022,287.00) Agreement (already
recovered)
7
LESS WATER CHARGES @ 1.5% (5,236,436.36) (949,188.72) (6,185,625.08)
=
519532402.xlsx / Summary QS (ZKHB) QS (PEPAC Pvt Ltd) Resident Engineer(PEPAC Pvt Ltd) 2 of 12
CONSTRUCTION / UP-GRADATION OF MOSQUE AT PAK SECRETARIATE, ISLAMABAD
M/S ZARIF KHAN HUSSAINZAI & BROTHERS.
ABSTRACT OF COST
INTERIM PAYMENT CERTIFICATE NO.08
BOQ Work-done Amount (Rs.)
BOQ
S.No Ref Item Description Unit Previous IPC Remarks
No. Quantity Rate Qty This IPC Qty To-Date IPC Qty This IPC To-Date IPC
CIVIL WORKS
2 30 Same as above but 32mm dia Rft 750 139 0.00 0.00 0.00 -
3 31 Same as above but 40mm dia Rft 210 211 - 2020.16 2020.16 426,253.76 426,253.76
519532402.xlsx / Public Health QS (ZKHB) QS (PEPAC Pvt Ltd) Resident Engineer(PEPAC Pvt Ltd) 7 of 12
CONSTRUCTION / UP-GRADATION OF MOSQUE AT PAK SECRETARIATE,
ISLAMABAD
2 As above but 2 point Controlled by 1 Switch Each 120 1,800 104.00 104.00 187,200.00 187,200.00
3 As above but 3 point Controlled by 1 Switch Each 40 2,200 40.00 40.00 88,000.00 88,000.00
4 As above but 4 point Controlled by 1 Switch Each 20 2,500 20.00 20.00 50,000.00 50,000.00
9 As above but outlet to outlet Each 60 2,000 60.00 60.00 120,000.00 120,000.00
519532402.xlsx / Internal Electrification QS (ZKHB) QS (PEPAC Pvt Ltd) Resident Engineer(PEPAC Pvt Ltd) 9 of 12
CONSTRUCTION / UP-GRADATION OF MOSQUE AT PAK SECRETARIATE, ISLAMABAD
M/S ZARIF KHAN HUSSAINZAI & BROTHERS.
ABSTRACT OF COST
INTERIM PAYMENT CERTIFICATE NO.07
BOQ Work-done Amount (Rs.)
BOQ
S.No Ref Item Description Unit Previous IPC To-Date IPC Remarks
No. Quantity Rate This IPC Qty This IPC To-Date IPC
Qty Qty
519532402.xlsx / Internal Electrification QS (ZKHB) QS (PEPAC Pvt Ltd) Resident Engineer(PEPAC Pvt Ltd) 10 of 12
CONSTRUCTION / UP-GRADATION OF MOSQUE AT PAK SECRETARIATE, ISLAMABAD
M/S ZARIF KHAN HUSSAINZAI & BROTHERS.
EXTERNAL ELECTRIFICATION WORKS
ABSTRACT OF COST
INTERIM PAYMENT CERTIFICATE NO.07
BOQ Work-done Amount (Rs.)
S.No Item Description Unit Previous IPC To-Date IPC Remarks
Quantity Rate Amount Qty This IPC Qty Qty This IPC To-Date IPC
Providing
Erection&of erecting
PolesLT M.S Tabular pole 30 feet long
having size (3" x 5') x (4" x 7') x (5" x 18') in the
ground 5' deep and making PCC foundation 1;3;4 ratio,
2' height from the ground level duly plastered etc as
2 required Each 15 30,000 450,000.00 0.00 0.00 0.00
3 Supply and fixing Gate LED Light with 20 W Lamp Each 4 3,000 12,000.00 0.00 0.00 0.00
Pump
519532402.xlsx / External Electrification QS (ZKHB) QS (PEPAC Pvt Ltd) Resident Engineer(PEPAC Pvt Ltd) 11 of 12
CONSTRUCTION / UP-GRADATION OF MOSQUE AT PAK SECRETARIATE, ISLAMABAD
M/S ZARIF KHAN HUSSAINZAI & BROTHERS.
EXTERNAL ELECTRIFICATION WORKS
ABSTRACT OF COST
INTERIM PAYMENT CERTIFICATE NO.07
BOQ Work-done Amount (Rs.)
S.No Item Description Unit Previous IPC To-Date IPC Remarks
Quantity Rate Amount Qty This IPC Qty Qty This IPC To-Date IPC
519532402.xlsx / External Electrification QS (ZKHB) QS (PEPAC Pvt Ltd) Resident Engineer(PEPAC Pvt Ltd) 12 of 12