In order to create multiple materials at once,
you should have access to a function like

1. eCatt tool
2. LSMW(Legacy System Migration
Workbench)
3. BDC (Batch Data Communication)
recordings
4. BAPI (Business Application Programing
Interface)

You can also use mass maintenance


transaction MM17 to create views in some
cases.But you must keep in mind that not all
of the organizational levels should contain the same data (MM17 requires that all data
for the materials and organizational levels you select should be the same).

Mass creation is never considered to be end users responsibility.But as a module


specialist you may need to work on MM17 . In case of LSMW, BDC or BAPI, it is
considered to be developers or consultants work. So you do not have to understand in
detail, you just have to know the concept, and that there is this kind of possibility for
mass data maintenance.

You can use MM17 for mass changing of material master data (if something can't be
accomplished by this transaction it can be done using LSMW, BDC or BAPI).

Step 1)

1. Enter transaction MM17


2. Select the data type you need to change, for example, we need to change a field in
general data.
3. Execute.

https://www.guru99.com/mass-creation-of-material-master.html 1/3
04/03/2021 MM17: Mass Maintenance of Material Master in SAP

Step 2)

1. Enter the material range or list for which we want to change the data
2. Execute

Step 3)

1. When clicking on the button shown below – you will get the Select fields screen.
2. Check the appropriate field (we are changing base unit of measure for our two
materials).
3. Click the arrow pointing to the left to add the selected field to the list of fields to be
changed.
4. Click the OK button.

https://www.guru99.com/mass-creation-of-material-master.html 2/3
04/03/2021 MM17: Mass Maintenance of Material Master in SAP

Step 4) Now we are presented with the next screen where we can input our value to be
transferred. Let's say we have maintained PAL – pallet as the base unit of measure for
our TV sets of 24" and 32" and we need to change that to PCS – pieces.

1. Enter the value you want to copy in the box.


2. Click on the column heading.
3. Select the button, to overwrite the old values by "PCS".
4. Execute.

Now your settings are saved, and your material master data is changed.