D4.c.c.9 (Eng) Bahan Pelatihan Survei Kondisi Jalan Untuk BoQ (Balai Sumbawa) (EXERCISE MATTER NOPEMBER 2017)
D4.c.c.9 (Eng) Bahan Pelatihan Survei Kondisi Jalan Untuk BoQ (Balai Sumbawa) (EXERCISE MATTER NOPEMBER 2017)
D4.c.c.9 (Eng) Bahan Pelatihan Survei Kondisi Jalan Untuk BoQ (Balai Sumbawa) (EXERCISE MATTER NOPEMBER 2017)
Link :
Roads Number Road Type FROM
Start Kilometre Date TO
PAVEMENT TYPE
PAVEMENT WIDTH m
SHOULDER WIDTH m
SHOULDER TYPE
URGENT No.
SPOT IMPROVEMENT m
Grass sq.m
VEGETATION
Shrubs sq.m
Unlined - Clear m
Unlined - Re-dig m
Unlined - Construct m
DRAINAGE
Lined - Clear m
Lined - Re-dig m
Lined - Construct m
Drain lining m
Mitres m
SPECIAL DRAINAGE
Spillways No.
Re shape m
Fill cu. m.
Protection - height m
SLOPES
Protection - length m
Grade sq.m
Clear sq. m
Fill cu. m.
SHOULDER
Cut cu. m.
Concrete - construct cu. m.
Seal cracks sq.m
Edge repairs m
Fill potholes sq.m
Cut and patch sq.m
CARRIAGEWAY
Pavement replacement sq.m
Backlog Minim - Corrector m
Backlog Minim - Primerseal sq.m
Backlog Minim - Small Agg. sq.m
Number No.
CULVERTS Existing Clear No.
Repair aprons, h'walls No.
Provide No.
CULVERTS New Length m
Size cm
Inspect No.
Repair-deck, approach sq.m
BRIDGES Existing
Repair - safety rail m
River protection m
Provide No.
BRIDGES New
BRIDGES New Length m
Size cm
Missing/damaged furniture No.
SAFETY
Missing/damaged guardrail m
Page : of :
Remarks :
FORMULIR PERHITUNGAN PEMELIHARAAN - JALAN ASPAL HALAMAN : DARI :
RUAS :
PEMELIHARAAN RUTIN
Rumput sq.m
TANAMAN
Semak sq.m
Pembersihan - Drainase m
Panjang m
Tinggi m
Timbunan cu.m
Panjang m
DINDING PENAHAN TANAH
Tebal m
Tinggi m
Timbunan cu.m
Panjang m
Tinggi m
Panjang m
Tinggi m
NOMOR RUAS : RUAS JALAN : Tawali - Sape DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
LEBAR PERKERASAN JALAN m 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Aspal / Patching (< 40x40 cm) m3 0.3x0.4x0.06 0.3x0.3x0.06 0.3x0.3x0.06 0.3x0.3x0.06 0.3x0.3x0.06 10.1.(1)2
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 8.1.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3 0.2x0.7x0.06 0.2x0.6x0.06 0.2x0.7x0.06 0.2x0.7x0.06 0.2x0.7x0.06 10.1.(1)2
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3 8.1.(1)
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 2x10 2x10 2x10 2x10 2x10 10.1.(1)1
Penambalan Lubang dengan Aspal / Patching (> 40x40 cm) m3 1x4x0.06 2x2x0.06 2x2x0.06 2x5x0.06 2x2x0.06 2x5x0.06 1x3x0.06 8.1.(5)
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3 1x4x0.2 2x5x0.2 8.1.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3 0.3x10x0.06 0.3x10x0.06 0.5x15x0.06 0.5x5x0.06 8.1.(5)
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3 0.3x10x0,2 8.1.(1)
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 4.5x20 4.5x20 4.5x20 4.5x20 8.1.9
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY
02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN : Tawali - Sape DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
LEBAR PERKERASAN JALAN m 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 50 50 40 100 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3 1x25x0.1 1x25x0.1 8.2.(1)
BAHU JALAN Pengisian Bahu Jalan dengan Agregat Kelas S m3 1x50x0.1 4.2.(2b)
Betok K-175 untuk Bahu Jalan m3 1x25x0.15 1x50x0.15 1x20x0.15 1x10x0.15 7.1.(8)
Galian untuk Selokan Drainase dan Saluran Air m3 0.49x200 0.99x200 0.99x50 0.99x200 0.49x50 2.1.(1)
SALURAN
Pasangan Batu Mortar m3 0.52x200 0.52x50 0.52x200 2.2.(1)
Pasangan Batu untuk Tembok Penahan Tanah m3 H2 / L10 H2 / L15 H3 / L15 7.9.(1)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3 2x0.5x10 2x0.5x15 3x0.5x15 3.2.(2a)
CATATAN :
FORMULIR SURVEY
03 KONDISI BANGUNAN PELENGKAP & ROAD SAFETY HAL : 1 /
NOMOR RUAS : RUAS JALAN : Tawali - Sape DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
LEBAR PERKERASAN JALAN m 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
RM - PEMELIHARAAN RUTIN
Pemeliharaan Jembatan (Pengecatan Railing dan Headwall) m' (2+6+2) x2 (2+6+2) x2 (2+6+2) x2 10.1.(5).1
Pembersihan Drainase / Lubang Drainase pada Lantai Jembatan m' 6x2 6x2 6x2 10.1.(5).2
CATATAN :
REKAPITULASI KUANTITAS HASIL SURVEY
Nama Ruas :
Panjang Ruas :
Tanggan Survey :
Tim Survey :
a b c d e
DIVISI 1. UMUM
1.2 Mobilisasi LS
1.8.(1a) Rangka Rambu Multi Pesan Buah
1.8.(3) Rambu Multi Pesan Buah
1.8.(4) Traffic Cone Buah
1.8.(5) Pagar Keselamatan dari Anyaman Plastik (Barrier Mesh) M1
1.8.(6) Pagar Keselamatan Buah
1.8.(7) Rambu Jalan Stop / Pelan-Pelan (Lolypop) Buah
1.8.(8) Bendera Oranye dengan Tali (Orange Bunting) M1
1.8.(9) Kendaraan untuk Pemeliharaan Jalan Buah
1.9.(1) Alat GPS Type Garmin GPS Map 78 atau sejenis Buah
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 0.00
2.3.(1) Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm M1
2.3.(2) Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm M1
2.3.(3) Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M1
2.3.(5) Gorong2 Pipa Baja Bergelombang Ton
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1
2.3.(7) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1
2.3.(8) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1
2.3.(9) Saluran berbentuk U Tipe DS 1 M1
2.3.(10) Saluran berbentuk U Tipe DS 2 M1
2.3.(11) Saluran berbentuk U Tipe DS 3 M1
2.3.(12) Beton K250 (fc’ 20) untuk struktur drainase beton minor M3
2.3.(13) Baja Tulangan untuk struktur drainase beton minor Kg
2.3.(14) Pasangan Batu tanpa Adukan (Aanstamping) M3
2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) M3
2.4.(2) Anyaman Filter Plastik M2
2.4.(3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M1
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (1) Beton mutu tinggi fc’50 Mpa M3
7.1 (2) Beton mutu tinggi fc’45 Mpa M3
7.1 (3) a Beton mutu tinggi fc’40 Mpa dengan traveler M3
7.1 (3) b Beton mutu tinggi fc’40 Mpa perancah M3
7.1 (4) Beton mutu tinggi fc’35 Mpa M3
7.1 (5) a Beton mutu sedang fc’30 MPa lantai jembatan M3
7.1 (5) b Beton mutu sedang fc’30 MPa untuk Slab Culvert M3 0.00
7.1 (6) Beton mutu sedang fc’25 Mpa (K-300) M3
7.1 (7) a Beton mutu sedang fc’20 MPa (K-250) M3 0.00
7.1 (7) b Beton mutu sedang fc’20 MPa yang dilaksanakan di air M3
7.1 (8) Beton mutu rendah fc’15 MPa (K-175) M3 0.00
7.1 (9) Beton Siklop fc’15 Mpa M3
7.1 (10) Beton mutu rendah fc’10 Mpa (K-125) M3
7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
7.2 (3)a Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (3)b Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2 (4)a Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (4)b Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(7) Baja Prategang Kg
7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(10) Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) m3
7.2.(11).a Penyediaan balok gelagar Tee Beam bentang 60 m Buah
7.2.(11).b Pemasangan balok gelagar Tee Beam bentang 60 m Buah
7.2.(12).a Penyediaan panel full deph slab Buah
7.2.(12).b Pemasangan panel full deph slab Buah
7.3 (1) Baja Tulangan U 24 Polos Kg 0.00
7.3 (2) Baja Tulangan U 32 Polos Kg
7.3 (3) Baja Tulangan U 32 Ulir Kg
7.3 (4) Baja Tulangan U 39 Ulir Kg
7.3 (5) Baja Tulangan U 48 Ulir Kg
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg
7.4 (1) a Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (1) b Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (1) c Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (2) a Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (2) b Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (2) c Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (3) a Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m Buah
7.4 (3) b Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m Buah
7.4 (3) c Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m Buah
7.4 (3) d Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m Buah
7.4.(4).a Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah
7.4.(4).b Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah
7.4.(4).c Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah
7.4.(4).d Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah
7.5 (1) Pemasangan jembatan Rangka Baja Kg
7.5 (2) Pengangkutan Bahan Jembatan Kg
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2
7.6 (4) Dinding Turap Baja M2
7.6 (5) Dinding Turap Beton M2
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1
7.6 (7) Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm M1
7.6 (8) a Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm M1
7.6 (8) b Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm M1
7.6 (8) c Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm M1
7.6 (9) a Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
7.6 (9) b Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
7.6 (10) a Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
7.6 (10) b Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
7.6 (11) a Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
7.6 (11) b Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
7.6 (12) a Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (12) b Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm M1
7.6 (13) Pemancangan Tiang Pancang Kayu Ukuran …. mm M1
7.6 (14) a Pemancangan Tiang Pancang Baja Diameter 500 mm M1
7.6 (14) b Pemancangan Tiang Pancang Baja Diameter ..… mm M1
7.6 (15) a Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
7.6 (15) b Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
7.6 (16) a Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
7.6 (16) b Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
7.6 (17) a Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
7.6 (17) b Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
7.6 (18) a Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (18) b Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm M1
7.6 (19) a Tiang Bor Beton, diameter 800 mm M1
7.6 (19) b Tiang Bor Beton, diameter ….. mm M1
7.6 (20) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerjakan M1
di Tempat Yang Berair.
7.6 (21) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan M1
di Tempat Yang Berair.
7.6 (22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm buah
7.6 (23) Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah
7.6 (24) Tiang Uji jenis …… ukuran ……. M1
7.6 (25) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Siklik buah
7.6 (25) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Bertahap buah
7.6 (26) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Siklik
7.6 (26) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Bertahap
7.6 (27) a Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... buah
7.6 (27) b Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada Tiangukuran / diameter .... buah
7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1
7.9.(1) Pasangan Batu M3 0.00
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3
7.10.(2) Pasangan Batu Kosong M3
7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis M3
7.10.(3) b. Bronjong dengan kawat yang dilapisi PVC M3
7.10.(3) c. Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC M2
7.11.(1) a. Expansion Joint Tipe Asphaltic Plug, Fixed M1
7.11.(1) b. Expansion Joint Tipe Asphaltic Plug, Moveable M1
7.11.(2) Expansion Joint Tipe Rubber 1 M1
7.11.(3) Expansion Joint Tipe Rubber 2 M1
7.11.(4) Expansion Joint Tipe Rubber 2 M1
7.11.(5) Joint Filler untuk Sambungan Konstruksi M1
7.11.(6) Expansion Joint Tipe Baja Bersudut M1
7.11.(7) Expansion Joint Tipe Modular Lebar …… M1
7.12.(1a) Perletakan Logam Tipe Fixed 150 Ton buah
7.12.(1b) Perletakan Logam Tipe Moveable 150 Ton buah
7.12.(1c) Perletakan Logam Tipe ….. buah
7.12.(2) Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm buah
7.12.(3) Perletakan Elastomerik Sintetis Ukuran ……mm x ……. mm x ……. mm buah
7.12.(4) Perletakan Strip M1
7.13.(1) Sandaran (Railing) M1
7.14.(1) Papan Nama Jembatan buah
7.15.(1) Pembongkaran Pasangan Batu M3
7.15.(2) Pembongkaran Beton M3
7.15.(3) Pembongkaran Beton Pratekan M3
7.15.(4) Pembongkaran Bangunan Gedung M2
7.15.(5) Pembongkaran Rangka Baja M2
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M'
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2
7.15.(8) Pembongkaran Jembatan Kayu M2
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km
7.16.(1) Deck drain Unit
7.16.(2).a Pipa Drainase Baja diameter 75 mm M'
7.16.(2).b Pipa Drainase Baja diameter ….. mm M'
7.16.(3).a Pipa Drainase PVC diameter 75 mm M'
7.16.(3).a Pipa Drainase PVC diameter …. mm M'
7.16.(4) Pipa Penyalur PVC M'
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan
1. Pembersihan dan pembuangan lumpur pada selokan samping diperkeras. M' 0.00
2. Pemotongan rumput / semak pada ruang manfaat jalan. M2 0.00 ( x 3 putaran selama pelaksanaan)
3. Pembersihan dan pembuangan lumpur pada gorong - gorong / box culvert. M' 0.00
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
FORMULIR SURVEY
02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KANAN
NOMOR RUAS : RUAS JALAN : Tawali - Sape DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
LEBAR PERKERASAN JALAN m 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 50 50 40 100 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3 1x25x0.1 1x25x0.1 8.2.(1)
BAHU JALAN Pengisian Bahu Jalan dengan Agregat Kelas S m3 1x50x0.1 4.2.(2b)
Betok K-175 untuk Bahu Jalan m3 1x25x0.15 1x50x0.15 1x20x0.15 1x10x0.15 7.1.(8)
Galian untuk Selokan Drainase dan Saluran Air m3 0.49x200 0.99x200 0.99x50 0.99x200 0.49x50 2.1.(1)
SALURAN
Pasangan Batu Mortar m3 0.52x200 0.52x50 0.52x200 2.2.(1)
Pasangan Batu untuk Tembok Penahan Tanah m3 H2 / L10 H2 / L15 H3 / L15 7.9.(1)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3 2x0.5x10 2x0.5x15 3x0.5x15 3.2.(2a)
CATATAN :