The CePIETSO PCP certification process

Part I - Training Course

1. Course on CePIETSO (18th Apr 2016 ~ 23rd April 2016)


2. Practical performance monitoring lab sessions
3. Comprehensive exam**

All done. **Waiting for examination result, estimate to receive


the result on June-2016.

Part II - Practical on the job training (Field work) - should be


start after receive the examination result

1. 6 months working experiences in IETS operation.


- conducting measurements, collecting samples, and conducting
analysis for each of the unit processes and unit operations of
IETS based on its relevant performance monitoring parameters;
- compare the data obtained; plotting graphs of data obtained;
- prepare Performance Monitoring Report based on the data
obtained and present to *Performance Monitoring Committee

2. To write a report writing/thesis (Field Training Report) on


operating and maintaining an IETS for a minimum of the 6
months working experience at IETS:-

FIELD TRAINING REPORT CONTENT:-


Chapter 1: Introduction
1.1 Background of Company or Industry
1.2 Organization's environmental commitment
1.2.1 Extract company's environmental policy, identify
If pass exam, get
certificate and valid for
whether the policy is existing or new policy, mention date of
ONE YEAR. policy has been developed. If new policy, explain how
CePIETSO involve in its development.
During this ONE YEAR 1.2.2 Emplacement and Functions of CePIETSO - show and
period, participants organizational structure where CePIETSO are placed; provide
must undergo six (6) certified copy of list of duties of CePIETSO where it shows the
months Field IETS performance monitoring function is one of CePIETSO core
Training at their duties.
premise starting
from the date of Chapter 2: Performance Monitoring of IETS
notification of passing 2.1 Description of IETS - briefly describe IETS by block diagram;
exam publish at EiMAS information on the IETS design; operating capacity (m³/day)
website and prepare 2.2 IETS Performance Monitoring Committee (PMC):
FTR within ONE YEAR CePIETSO - in FTR report shows organizational structure and
period. Two copies of explain the involvement of CePIETSO in the formation of the
Field Training Report committee; in industry CePIETSO should report performance
(FTR) must be monitoring to PMC
submitted to PMC would monitor the IETS performance, receive report from
EiMAS. The due CePIETSO; supporting CePIETSO and report to higher
date for FTR management on the IETS performance.
submission is ONE
YEAR after the
notification.
2.3 Conduct on Performance Monitoring
2.3.1 Situation IETS before course attendance
2.3.2 Changes instituted
2.3.3 Current performance monitoring procedure

Chapter 3: Discussion of Performance Monitoring Result -


based on the practical on job training
(i) Identify relevant performance monitoring for each unit
processes and unit operations of IETS; compare data with
recommended ranges using techniques in statistical data
analysis in Guidance Document on Performance Monitoring of
IETS (Specified in Reg 9(a), Environmental Quality (Industrial
Effluent) Regulations 2009).
(ii) Prepare, present and discuss control charts of the
performance monitoring parameters which may include pH, flow
measurement. BOD, SS, COD for each of unit processes in
IETS.

Chapter 4: Corrective Actions


(i) describe details of major upset conditions/breakdown
encountered during the operation of IETS within the 6 months
on job training. Include the corrective action taken.

Chapter 5: Further Improvement


(i) describe future efforts, if any

Chapter 6: Conclusion
Overall Performance of IETS and discuss how performance
monitoring has benefited company.

Appendices

Part III - Professional Interview

1. Presentation on the FTR, Q&A


2. Will be held in DOE, Ministry of Natural Resources &
Environment, Putrajaya.

Issuance of CePIETSO Certificate - Competent Person