Installation (V1 3)
Installation (V1 3)
1. Installation requirements
2. Unpacking
3. Removal and installation
4. Connections
5. Start up and adjustment
6. Shut down
7. Upgrade the software
Space Requirement:
1. Between right or left panel and the wall ≥ 100 cm
2. Between back panel and the wall ≥ 50 cm
3. Make sure there are enough space for you to put the
reagents bottle.
Power Requirement:
1. Voltage: A.C.100V-240V
2. Input power: ≤300 VA
3. Frequency: 50/60 Hz
4. Make sure the analyzer is properly grounded.
Packing tapes
Paper protective
corners
Clamp
Plastic
cable tie
Set IP of PC :10.0.0.1
Reagents, identified by
color when connecting
Waste
Install the
supporting board for
diluent.
Service engineer:
Name: service
Password: Se s700
Then click „OK‟ to go on.
Select work mode: click new, and choose “WB” “CBC+DIFF”, then click
“Save”.
Version: 1.3, Update Date: 2009-5-7
Start up and adjustment-Background test
1. Prepare particle: press “Dliuent”, and add diluent 3 times then add one
drop 7um particle.
2. Then select work mode: WB CBC+DIFF and use the prepared particle
to run as sample.
Version: 1.3, Update Date: 2009-5-7
Start up and adjustment-Particle test
FS 26 3 18 2
SS 117 5 104 6
Press “shut
down”