DRA-DELHI PROJECT- PKG-1,2 &3

RESOURCE-SUMMARY
S.No DESCRIPTION REFERENCE DRAWING NOS. VENDOR LOCATION Unit ORDER QTY REMARKS
Rate Qty Amt
viaduct
1 Pile cap
1.1 PILE CAP-1 Mt
1.2 PILE CAP-2 Mt
1.3 PILE CAP-3 Mt
1.4 PILE CAP-4 Mt

2 Pier
2.1 PIER-1 MT
2.2 PIER-2 MT
2.3 PIER-3 MT
2.4 PIER-4 MT
2.5 PIER-5 MT
2.6 PIER-6 MT
2.7 PIER-7 MT
2.8 PIER-8 MT
2.9 PIER-9 MT
2.10 PIER-10 MT
2.11 PIER-11 MT
2.12 PIER-12 MT
2.13 PIER-13 MT
2.14 PIER-14 MT
2.15 PIER-15 MT
2.16 PIER-16 MT

3 Pier cap
3.1 PIER CAP-1 MT
3.2 PIER CAP-2 MT
3.3 PIER CAP-3 No
3.4 PIER CAP-4 MT
3.5 PIER CAP-5 No
3.6 PIER CAP-6 No
3.7 PIER CAP-7 No
3.8 PIER CAP-8 No
3.9 PIER CAP-9 No
3.10 PIER CAP-10 MT
3.11 PIER CAP-11 MT
3.12 PIER CAP-12
3.13 PIER CAP-13 MT

4 LG Supports
4.1 Cribs MT
4.2 Cribs Mt
Ladder No
4.3 Ladder No
4.4 Staircase Mt
4.5 Lifter segment Mt
4.6 Pin Kg/No
4.7 Pin Kg/No
4.8 Lifter I Girder Mt
4.9 Lifter segment Mt
7.10 Pin Kg/No
7.11 Pedestal shutter Mt
7.12 Cribs for LG-5 Mt
7.13 Staircase
7.14 Pedestal shutter

5 Other Structural Materaial


5.1 Station,Viaduct,LG, Casting yard Mt
6 Segment
6.1 Segment Mould-1 MT
6.2 Segment Mould-2 MT
6.3 Segment Mould-3 MT
6.4 Segment Mould-4 MT 7th
6.5 Segment Mould-5 MT 8th
6.6 Segment Mould-6 MT
6.7 Segment Mould-7 MT
6.8 Segment Mould-8 MT
6.9 Segment Mould-9 MT 9th
6.10 Segment Mould-10 MT 2/18/2021
6.11 Segment Mould-11 MT 2/18/2021
6.12 Segment Mould-12 MT
6.13 Hardware of bed MT
Resourse summary- Requirement
Actual Vendor Remarks
S.No Description Location Unit
Rate Qty Amt
viaduct
1 Pile cap
1.1 Shb Pile cap Stn Mt 63,000 14.5 12.95 815,850 Evershine
1.2 Gzb Pile cap Stn Mt 63,000 25.5 25.5 1,606,500 Panchal
1.3 Viaduct Via Mt 60,000 40 40 2,400,000 ITS
1.4 Viaduct Via Mt 67,000 7.5 6.285 421,095 Mset
84.735 5,243,445

2 Pier
2.1 2.5 Dia Via MT 69,000 23.5 22.63 1,561,539 krish
2.2 Gzb Station Pier (PD1 to PL) Stn MT 67,500 21 21.00 1,417,500 Krish
2.3 2mtr dia Via MT 69,000 57 50.87 3,509,685 Krish
2.4 2mtr dia Via MT 69,000 63 54.31 3,747,390 Agroa
2.5 2mtr dia Via MT 67,500 22.5 12.77 861,975 Maini
2.6 2.5 Dia Via MT 67,500 31.5 30.93 2,087,775 Maini
2.7 Gzb Station Pier (gl to pd1) stn MT 63,000 25.5 25.50 1,606,500 Panchal
2.8 Gzb Station Pier (gl to pd1) stn MT 68,000 17.5 17.50 1,190,000 Mohan
2.9 Shb Stn Pier stn MT 67,000 15.4 15.36 1,029,120 Evershine
2.10 crash barrier- viaduct via MT 70,000 7.5 7.50 525,000 Panchal
2.11 Gzb Station pier Gzb Gl to Pd via MT 70,000 14.5 14.50 1,015,000 Panchal
2.12 P169 pier via MT 69,500 16 16.00 1,112,000 Panchal
2.13 2.5 Dia Via MT 79,000 23 23.00 1,817,000 Krish
2.14 2.5 Dia Via MT 83,000 31.25 31.25 2,593,750 Krish
2.15 P199 Pier via MT 69,500 33.5 33.50 2,328,250 Panchal
2.16 2.5 Dia via MT 92,000 26 26.00 2,392,000 Gm

402.62 28,794,484

3 Pier cap
3.1 Pier cap via MT 72,000 15 0 - Maini pier cap
3.2 Pier cap via MT 76,000 18 9.13 693,880 Goel
3.3 Pier cap via No 383,873 3 3 1,151,619 Goel
3.4 Pier cap Stn MT 74,000 29 29 2,146,000 Goel
3.5 Pier cap 2m Via No 635,000 2 2 1,270,000 GM
3.6 Pier cap 2m Via No 690,000 2 2 1,380,000 GM
3.7 Pier cap Via No 610,000 2 2 1,220,000 GM
3.8 Pier cap Via No 690,000 4 4 2,760,000 GM
3.9 Pier cap Zigg Via No 184,000 2 2 368,000 GM
3.10 P169 pier cap Via MT 74,000 8.5 8.5 629,000 Panchal
3.11 Station Pier Cap Stn MT 76,000 29 2,204,000 Goel
3.12 Bracket support Via - Goel
3.13 Pier cap P197 Via MT 80,000 12 960,000 Panchal

120.63 14,782,499

4 Parapet
4.1 Parapet MT 28,000 23 11.38 318,640 Tulika
4.2 Parapet/cover slab MT 81,000 50 51.06 4,135,860 Evershine
4.3 Parapet - 15mm raidial LS 93,765 1 0.25 93,765 Tulika
4.4 Parapet/cover slab 81,000 26.60 2,154,600 Evershine
89.29 6,702,865
5 Cross Arm/parapet
5.1 Shb Cross arm MT 70,000 57 52.83 3,698,100 Tulika
5.2 Gzb Invert T MT 72,000 22 22.49 1,619,280 krish
5.3 Gzb PL Cross arm MT 79,000 37 33.81 2,670,990 AN Vistar
5.4 Corbel MT 66,500 35 0 - AN Vistar
5.5 I Girder MT 66,500 67 61.63 4,098,395 AN Vistar
5.6 Raise platform MT 73,500 16 1,176,000 Ratan
5.7 Cross Arm MT 70,000 13.4 938,000 Tulika
5.8 Invert T MT 72,000 9.1 655,200 Krish
5.9 Gzb Upper PD Pier MT 67,500 11.8 11.80 796,500 Krish
5.10 I Girder Platform level MT 85,000 37.00 3,145,000 GM
5.11 Station Pier Cap 2 No Stn MT 82,000 18 1,476,000 GM
5.12 Lifter- for gzb station 14.00 1,269,000 Bridgecon
5.13 Concourse level I girder Mt 77,500 23.00 1,782,500 Panchal
5.14 Lifter- for Shb Station - 13mtr Mt 14.50 1,085,000 GM Engineeri 3/1/2021
5.15 Lifter- for Shb Station - small Mt 6.00 602,200 GM Engineeri 3/1/2021
276.06 25,012,165.00
6 LG Supports
6.1 Cribs MT 56,000 27 27 1,512,000 Krish
6.2 Cribs via Mt 56,000 28 28 1,568,000 GM
Ladder via No 179,010 2 2 358,020 Maini 12mtr height
6.3 Ladder via No 290,290 2 2 580,580 Maini 12mtr height
6.4 Staircase via Mt 65,000 12 12 780,000 Maini
6.5 Lifter segment Mt 66,000 6.954 6.954 458,964 GM
6.6 Pin Kg/No 1,600 4 0.5 6,400 GM
6.7 Pin Kg/No 3,000 4 0.5 12,000 GM
6.8 Lifter I Girder Mt 68,500 12.6 12.6 863,100 GM
6.9 Lifter segment Mt 68,500 4 4 274,000 GM
7.10 Pin Kg/No 300 0.5 0.5 150,000 GM
7.11 Pedestal shutter Mt 58,000 5.8 5.8 336,400 Mset
7.12 Cribs for LG-5 Mt 66,000 75 4,950,000 Mset 28-Jan
7.13 Staircase 78,000 13.42 1,046,694 maini 10-Feb
7.14 Pedestal shutter 65,500 4.6 301,300 Mset
13,197,458

7 Other Structural Materaial


7.1 Station,Viaduct,LG, Casting yard Mt 60,000 379.703 22,782,180

379.70 22,782,180

8 Segment
8.1 Segment Mould MT 77,500 75 18.31 1,419,025 Goel
8.2 Segment Mould MT 77,500 75 75 5,812,500 GM Engineering
8.3 Segment Mould MT 71,000 51 9.719 690,049 GM Engineering
8.4 Segment Mould MT 73,000 73 72.585 5,298,705 MD Engineeri 7th
8.5 Segment Mould MT 82,000 74 74 6,068,000 MD Engineeri 8th
8.6 Segment Mould MT 79,000 160 160 12,640,000 MD Engineering
8.7 Segment Mould MT 74,500 160.5 160.5 11,957,250 NC Infra
8.8 Segment Mould MT 77,500 42 42 3,255,000 NC Infra
8.9 Segment Mould MT 82,000 51 51 4,182,000 Safotec 9th
6.10 Bottom jack & table MT 97,000 7.14 692,500 GM Engineeri 2/18/2021
6.11 Segment Mould MT 82,000 19.58 1,605,560 Safotec 2/18/2021
6.12 Rectification of 9th bed MT 23,500 65 1,527,500 Safotec
6.13 Hardware of 9th bed MT 83,000 11 913,000 Safotec
765.833175 56,061,089