Download as pdf
Download as pdf
You are on page 1of 29
PHONGSUBTHAVY GROUP CO.,LTD HOUAY KAOUANE HYDROPOWER PROJECT ATTAPEU PROVINCE, LAO PDR PROJECT CODE: 118011G DETAIL DESIGN rar mATaRESES 04 -12- 2020 PA KIEM TRA HEADWORKS REINFORCED CONCRETE FOR INTAKE Director of Hydropower Dept Pham Van Tuan Project Manager: Pham Van Tuan ge Ho Chi Minh City, Dec, 2020 VICE PRESIDENT POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 PARTICIPANTS HOUAY KAOUANE HYDROPOWER PROJECT Pham Van Tuan Project Manager x : "Nga bach Penge | ep Phan Thanh Son ‘Checked By oo | Designed By he L x DESIGN EXPLAINATION Legal basic = Comply with drawings in basic design is approved in 24/12/2019 BA KIEM TRA = Comply with current standards on construction technical conditions and acceptance of pit excavation. ~ Comply with approved construction technical conditions in previous technical design. ~ Comply with technical conditions of current standards: + Re-bar: using rebar grade CB400-V (Rch = 400 000 KNim?) for rebar with diameter D>=10mm CB300-V (Rch = 300000 KNim2) for rebar with diameter D [oe ms ar vom BA KiEM TRA nom CITT n CaRTRNCTOR oun uae FS owen Soir Cora LIMITED ev Kc Pe eat 5 _| cng tie) Com IR 5 HHOUAY KAQUANE HPP a : fi somo eee ee — |LI HYDRO CONSULTANCY . ae a oa = | STEEL QUANTITY CALCULATION OF "8 Nong Beuk Tay Vitge, Sktatong | As rad No, Ban Tangy Seta == = TAKE st, Verne Cpt ao Por | oti entne Cott to roR |p — fee Se [ev nos] ate | — Revision [rere = eee ool aes [gO TOTLONCH BILL OF QUANTITY ne |= ‘ony | rm) || Eo a oo a[ele| © |al——@ 2 = {mt ale BILL OF QUANTITY + Teer oa | mE | TRROE oes » + fam] = ‘or_| “sam | “So_| "en gs} 2a) 0385 oR BR aos aa | eran | wan j » + | ao ma weno é eonracTOR Sw DTRACTOR UR eAOURN — owen SOLE COMPANY LIMITED —uenmeene 5 “TRUNG HEY CONSTRUCTION c HOUAY KAOUANE HPP acre a | He) scwr-stocxconenet 6 PPE race = RENEORCED CONCRETE Se ream te tn ete |LI HYDRO CONSULTANCY | 3 ie 2 se ‘QUANTITY OF BEAM D1, D2, D3 8 ng Bek Tay ioe, Stntaong| ss rad on Tar, Ste, | fa ~ — Disc, Ventane Cpt, Lae POR | istic, Venta Capa Lao POR |g : re! = feg_| rig te: _ evn oe | ~ Revision [reper feet femmes |e | nr POOLS TO-TALONC| 1 ieee wisn 8 Omen sieee [waar [es Bon SI cea er nes BmLoTER Sosa o orc le TACT HOURY AOU owen SOLE COMPANY LIMITED ‘Naas Poel a, 5 ‘unc mevosucron | evn peocs HOURY KAQUANE HP wconaeee 2 Hie son sTocx COMPA SSuPGENESUISTRCS™") INTAKE - REINFORCED CONCRETE SOAS ra act ne patina LJ HYDRO CONSULTANCY | 3. _— 2 eatin [vane | Sin | Oa [ove Jono BILL OF QUANTITY ‘88 Nong Bek Ty ilape,Skhtabong | hs mo No.1, Bn Thngkng, Stara — ee ne own ote Dian Verte capa, toPOR | ate, ene Capa Lo POR |“ —— —— fern] me | — Ravan [ree = [nen sess] Tigo TOTLONCEM

You might also like