The inspection was done on 9. September 2019 at XXX in XXX .

System Specifications

 syngo CT 2014A, VB42B


 DURA 422-MV / MCT 172 Tube
 Last Tube change: 15. February 2019
 System Serial Number: 79008
 Date of Manufacturing: 2013
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 3

Status of the System

The status of the system is very good, it looked well maintained and very clean.
The system did pass all tests without any problems. The following photo shows the results
of the last Constancy Check
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 4

X-Ray Tube

The tube has been replaced on 15. February 2019 and had 50385 scan seconds on the
date of inspection.
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 5

Software Options - syngo Acquisition Workplace

Software Licenses - syngo Acquisition Workplace


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 6

System Components

Gantry and Patient Table


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 7

Gantry and Patient Table


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 8

Gantry and Patient Table


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 9

Gantry and Patient Table


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 10

Gantry and Patient Table


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 11

LCB
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 12

Console

syngo Acquisition Workplace

ICS Tower 11B, Celsius M470 – 2 Power IRS Tower 10G, Celsius M470 – 2 Power
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 13

Console

UPS
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 14

Accessories

Technical Documentation

System Software
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 15

Phantoms

Water, Wire, Slice and Alignment Phantom

CCR-Combi Phantom
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 16

Patient Positioning
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 17

Software CD’s / DVD’s

 DVD_SOM5_IRS_VB42B_V3.0_64bit
 DVD_SOM5_ICS/IES_VB42B_1 of 2_32bit
 DVD_SOM5_ICS/IES_VB42B_2 of 2_32bit
 syngo Expert-i
 CD_SOM5_ICS/IES_VB42B_32bit_BARE
 Update_Licenses_VB42B
 E-Manual, syngo CT 2014A
 ICS 11B Recovery DVD, Disc1 of 2
 ICS 11B Recovery DVD, Disc1 of 2

 Backup ICS VB42B, 15.02.2019


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 18

Software CD’s / DVD’s


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 19

Software CD’s / DVD’s


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 20

QA Check

To check the performance of the scanner I did the following tests:

 Check Up including Tube Warm Up and Defective Channels Correction, Air Calibration
 Constancy Check including Phantom Check, Slice, Homogeneity/Water, Noise and MTF

All tests passed without problems.

The following pictures show the test results.


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 21

Results of the Constancy Checks


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 22
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 23
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 24

Deinstallation of the System

The system is located inside the Radiology Clinic, which in the ground level of the main
hospital building. The control room is on the right side of the scan room. The LCB is
located inside the scan room.

The removal route is not too long and not overly complicated.
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 25

View to the scan room door (2.05m * 1.20m)

View to door no. 2 (2.05m * 1.20m)


IDTM GmbH System Evaluation - Siemens Emotion 16 Page 26

2.30m
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 27

View to door no. 3 (2.04m * >2m) and door no. 4 (2.20m * >2m)
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 28

This is the emergency entrance and it should not be blocked during loading of the
equipment.

Cable Routing
The cables from the console to the gantry are routed through an on-wall cable tray into
the suspended ceiling and out of the suspended ceiling through another on-wall cable tray
into floor cable ducts
IDTM GmbH System Evaluation - Siemens Emotion 16 Page 29

As the above photo shows, there is a cabinet on top of a floor duct.