Peak Discharge Computation
Peak Discharge Computation
For the following watershed schematic, find the peak discharge into each inlet and the
required discharge capacity for each pipe using the Rational Method. Use a 50-yr return
period and the IDF curve.
L=600ft L=720ft
V=2 ft/sec V=2.5 ft/sec
Solution:
A L=600ft B L=720ft C
V=2 ft/sec V=2.5 ft/sec
Q P=C . i. A
Q P=0.4 x 10 x 3.9
Q P=15.6 ft 3 / sec
Q P=15.6 ft 3 / sec
Peak Discharge in Inlet: 2
Q P=C . i. A
Q P=37.1 ft 3 / sec
A L=600ft B L=720ft C
V=2 ft/sec V=2.5 ft/sec
td1=L/V
For pipe AB :
L
t d 1=
V
600
t d 1= =300 sec =5 min
2
tc1+td1=5+5=10 min
or
tc2 = 6 min
Q P=43.72 ft 3 /sec
Q P=C . i. A
Q P=0.3 x 9 x 8.9
Q P=24.03 ft 3 /sec
Discharge in Pipe C:
A L=600ft B L=720ft C
V=2 ft/sec V=2.5 ft/sec
td1=L/V td2=L/V
For pipe BC :
L
t d 2=
V
720
t d 2= =288 sec =4.8 min
2.5
tc1+td1+td2=5+5+4.8=14.8 min
or
tc2+td2=6+4.8 =10.8 min
or tc3 = 7 min
Hence:
tc=14.8 min
Q P=i. ∑ C j A j
Q P=56.95 ft 3 / sec
Table # 1
Summary of Results
Peak Discharge
Section Qp
3
(ft /sec)
Inlet 1 15.6
Inlet 2 37.1
Inlet 3 24.03
Pipe AB 15.6
Pipe BC 43.72
Pipe C 56.95