PROCESS UPSET REPORTING Date of event:

Time of event:
PUR No.

EVENT MAIN DATA


Plant causing upset: CAUSE: TRIP EFFECT:
Location PORT SAID Design ESD
Unit Unit 40 Equipment Failure ✘ PSD ✘
Level 3 Turbines Operational Problems USD
Tag 40-GG-01A Human Error NO TRIP
Planned Work Restricted Operation
Other

UPSET TYPE:
Level1 Unplanned
Level2 Equipment outage
Level3 Reduced Processed feed

Event Downtime Propane (ton) LPG (ton)


11.5 hrs Production Loss
Duration (hrs) 40.00 25.00
Event description and most likely causes
Description of Event

Siemens unit ”A” tripped twice at 11:50 AM & 5:10 PM due to false GG Chanel 2 over speed. Accompanied with low vent
pressure of the primary seals of both DE & NDE DGSs.

Actions already taken prior to restart


Applied Siemens procedure to inject 10 bar Nitrogen pluses in the vent line of the primary seal several times, so that the syste
became healthy.
Every time the turbine failed to start we had to perform reset for AC450 and to adjust the primary seal vent pressure manually
using the manual isolation valve D/S 40-PCV-02.
Replaced the proximitor of the speed sensor MBT10CS010
Replaced the solenoind valve (versa) of fuel isolation valve (MBP10AA030) as the turbine failed to start many times due to fue
isolation wrong position.

Initial thought

the over speed signal was not actual as the GG speed did not increase or reached the trip limit.

Information available

1 of 6
Siemens GT A tripped due to GG OVER SPEED CH2

Most likely causes


Any falut signal from the items of the speed sensor measurment loop. the most susbected in that loop was the proximiter,
so, it was replaced by a new one

Assessment of causes by On Site investigation

GG OVER SPEED CH2 trip was due to fault signal after cheking the trends of the GG speed sensors
the troubles in the seal gas system was most likely due to slow responce of vent pressure control valve (40-PCV-02)

Was there/ could there been advanced warning


no as it was a false signal

Override required Yes No Override approved Yes No Equipment Tag No.


Override requested Yes No Override applied Yes No
RECOMMENDATIONS
Actions to prevent reoccurrence of this event Action owner Target date Action type Priority

PUR SIGNATURES

2 of 6
Date Name Comments
PU Issued by 12/13/2015 Ahmed Mohsen
PU Reviewed by
PU Approved by
Eng. assistance Yes Comments regarding SOR.
required No
SOR raised Yes
No

3 of 6
12-Dec-15
11:50
PS-2015-08

ted Operation

DNG (bbls)
165

h low vent

o that the system

ssure manually by

mes due to fuel

4 of 6
proximiter,

ment Tag No.

Close out

5 of 6