Process Upset Reporting
Process Upset Reporting
Time of event:
PUR No.
UPSET TYPE:
Level1 Unplanned
Level2 Equipment outage
Level3 Reduced Processed feed
Siemens unit ”A” tripped twice at 11:50 AM & 5:10 PM due to false GG Chanel 2 over speed. Accompanied with low vent
pressure of the primary seals of both DE & NDE DGSs.
Initial thought
the over speed signal was not actual as the GG speed did not increase or reached the trip limit.
Information available
1 of 6
Siemens GT A tripped due to GG OVER SPEED CH2
GG OVER SPEED CH2 trip was due to fault signal after cheking the trends of the GG speed sensors
the troubles in the seal gas system was most likely due to slow responce of vent pressure control valve (40-PCV-02)
PUR SIGNATURES
2 of 6
Date Name Comments
PU Issued by 12/13/2015 Ahmed Mohsen
PU Reviewed by
PU Approved by
Eng. assistance Yes Comments regarding SOR.
required No
SOR raised Yes
No
3 of 6
12-Dec-15
11:50
PS-2015-08
ted Operation
DNG (bbls)
165
h low vent
ssure manually by
4 of 6
proximiter,
Close out
5 of 6
6 of 6