Professional Documents
Culture Documents
Drawings Jacket and MSF
Drawings Jacket and MSF
PLANT
NORTH ° PREVAILING
60
WIND
TRUE
1 3 2
25°
NORTH
1
A1 2
A2 B3 A1 A2 B3
A
EL(+)6.800 [(+)5.600]
600
= = = = = = BARGE BUMPER
EL(+)5.200 [(+)4.000]
1. FOR GENERAL NOTES REFER DRG. NO.A1-2000-S-0002
SPLASH ZONE
2. LEVEL SHOWN ON THIS DRAWING ARE REFERRED TO CHART DATUM AT EL(±) 0.000 .
UPPER LIMIT
WHICH IS EQUAL TO EL (+) 100.000 IN LOCAL DATUM. LEVELS SHOWN IN [ ]
CORRESPONDS TO M.S.L.
(TYP)
5000
EL(+)5.100 [(+)3.900]
SPLASH ZONE
0
0
.4
0
.4
25
.4
25
25
4X
4X
4X
6.
6.
40
6.
40
40
PE
PE
PE
EL(+)1.200 [(±)0.000]
PI
PI
PI
MSL MATERIAL TAKE OFF
1200
(TYP)
LOWER LIMIT
0
0
0
100
.7
PI
.7
.7
PI
PI
12
12
12
PE
PE
(TYP)
PE
9X
9X
9X
32
32
3.
3.
3.
4510
32
(TYP)
3.
32
3.
32
32
3.
9X
9X
REFERENCE DRAWINGS
9X
PE
PE
PE
12
12
12
PI
PI
PI
.7
.7
.7
0
0
(TYP)
100
(TYP)
100
100
A1-2000-S-0005 TO 0007 STANDARD WELDING DETAILS (SHT-1 TO SHT-3)
PIPE 324 (REF) PIPE 324 (REF) PIPE 324 (REF)
EL(-)7.310 [(-)8.510]
A1-2055-S-0283 CENTRAL ISLAND FLARE STRUCTURE G.A.
(LEVEL 3)
(TYP)
1000
D PB
29/11/2013 ISSUED FOR CONSTRUCTION MMC PJ VS NB
CONSULTANT/CONTRACTOR/VENDOR
cti
r ol o
et
n
P
Co
al
m
Nat io n
TECHNIP & NATIONAL PETROLEUM
pan y
CONSTRUCTION COMPANY (NPCC)
SmartSketch in A12055S0306_001.sha
DWG.No. 9800C-100-DW-3641-741
PROJECT: UPPER ZAKUM 750K PROJECT P-7511
SUB-SEA PIPELINES, CABLES, OFFSHORE STRUCTURES
& BROWNFIELD [EPC-1]
TITLE:
WORK PACKAGE - 4B
CENTRAL ISLAND FLARE BRIDGE SUPPORT JACKET 3
ELEVATIONS
SCALE EDMS DWG No.
1:75
PROJECT No. DWG No. A1-2055-S-0306 SHT.No. REV.
P-7511 001 D
D.O.P EDITION No.
D
KEY ELEVATION
PLANT
NORTH
° PREVAILING
60 WIND
1 3 2
25° 1 3 2 1 3 2
TRUE
NORTH
EL (+)6.200 [(+) 5.000]
(LEVEL 1)
3750 3750 3750 3750
PIP
.70
EL (-)2.800 [(-) 4.000]
12
E3
(LEVEL 2)
.9X
23
23
.9X
E3
12
PIP
.70
EL (-)7.310 [(-) 8.510]
(LEVEL 3)
PIP
.88
PIP
.70
15
E3
E3
12
.9X
.9X
23
23
6495
6495
23
.9X
.9X
23
E3
E3
15
12
PIP
.88
.70
PIP
NOTES
.70
PIP
12
1. FOR GENERAL NOTES REFER DRG. NO.A1-2000-S-0002
E3
.9X
2. LEVEL SHOWN ON THIS DRAWING ARE REFERRED TO CHART DATUM AT EL(±) 0.000 .
23
23
.9X
WHICH IS EQUAL TO EL (+) 100.000 IN LOCAL DATUM. LEVELS SHOWN IN [ ]
E3
12
CORRESPONDS TO M.S.L.
PIP
.70
PIPE 940 (REF)
(TYP)
1 3 2
REFERENCE DRAWINGS
3750 3750
A1-2055-S-0275 FLARE BRIDGE SUPPORT JACKET DRAWING LIST
PB
15
E2
73
6495
MMC PB VS
73
.1X
15
PB VS
PIP
.88
PIPE 273.1X15.88
Co ns t r u
eu m
CONSULTANT/CONTRACTOR/VENDOR
cti
r ol o
et
n
P
Co
al
A
m
Nat io n
TECHNIP & NATIONAL PETROLEUM
pan y
CONSTRUCTION COMPANY (NPCC)
SmartSketch in A12055S0307_001.sha
PIPE 928 (REF) 7500 DWG.No. 9800C-100-DW-3641-742
(TYP) (TYP)
PROJECT: UPPER ZAKUM 750K PROJECT P-7511
SUB-SEA PIPELINES, CABLES, OFFSHORE STRUCTURES
PLAN AT EL (+) 6.200 [(+) 5.000] CL OF PIPE & BROWNFIELD [EPC-1]
TITLE:
LEVEL 1 WORK PACKAGE - 4B
CENTRAL ISLAND FLARE BRIDGE SUPPORT JACKET 3
PLANS
SCALE EDMS DWG No.
1:50
PROJECT No. DWG No. A1-2055-S-0307 SHT.No. REV.
P-7511 001 D
D.O.P EDITION No.
D
KEY PLAN
PLANT
A1
1 A2
2 B3 A1 NORTH ° PREVAILING
60
WIND
7500 7500
= = = =
EL(+)121.125 EL(+)121.125 TRUE
25°
PIPE 610 (REF) PIPE 610 (REF) PIPE 610 (REF) NORTH
625
625
EL(+)120.500 EL(+)120.500
(LEVEL 1) (LEVEL 1)
1875
1875
1250
1250
225
1 3 2
PIPE 762X31.75
100
= = PI PI
B
PIPE 762X15.88
PIPE 762X15.88
PE PE
PI
2.7
76 32
PE
2X 3.9
X1
38 X1
3250
3250
.10
3.1
27
2 .70
3.1
27
X1
PE
2.7
PI
0
PIPE 762X31.75
A
620
1500
1500
2000
2000
PIPE 273 (REF) PIPE 273 (REF) PIPE 273 (REF) PIPE 273 (REF)
EL(+)114.500 EL(+)114.500
(LEVEL 2) (LEVEL 2) PIPE 273 (REF) PIPE 273 (REF)
500
PIPE 762X31.75
500
100 100
PIPE 762X19.05
= = = =
PIPE 762X15.88
.70
NOTES
PI
PI
2.7
PE
P
2
X1
4200
4200
X1
E
27
3.1
3.1
27
3.1
1. FOR GENERAL NOTES REFER DRG. NO.A1-2000-S-0002
3.1
27
27
X1
2. LEVEL SHOWN ON THIS DRAWING ARE REFERRED TO CHART DATUM AT EL(±) 0.000 .
X1
PE
E
2.7
2
WHICH IS EQUAL TO EL (+) 100.000 IN LOCAL DATUM.
PI
.70
PI
0
LEGEND:
INDICATES MATERIAL WITH THROUGH THICKNESS PROPERTIES
1300
1300
2100
2100
800
EL(+)107.700 PIPE 762X25.40 EL(+)107.700 - PIPE DIA.273.1X12.70 I S355G1+N 56.18 81.55 4582
FINAL PILE CUT-OFF FINAL PILE CUT-OFF - PIPE DIA.323.9X12.70 I S355G1+N 18.20 97.47 1774
PIPE 762 (REF) PIPE 762 (REF) - PIPE DIA.762X15.88 I S355G2+N 18.15 292.32 5306
EL(+)106.800 EL(+)106.800
- PIPE DIA.762X19.05 I S355G2+N 4.20 349.02 1466
TOP OF JACKET TOP OF JACKET - PIPE DIA.762X25.40 S S355G8+N (Z35) 6.30 461.38 2907
PIPE 928 (REF) PIPE 928 (REF)
- PIPE DIA.762X31.75 S S355G8+N (Z35) 9.75 571.75 5575
- PIPE DIA.762X38.10 S S355G8+N (Z35) 1.88 680.18 1275
1 1
0316 ELEVATION ROW A1-A2 0316 ELEVATION ROW B3-A1 Total in kg 22884
REFERENCE DRAWINGS
A1-2055-S-0275 FLARE BRIDGE SUPPORT JACKET DRAWING LIST
A2 B3
A1-2000-S-0005 TO 0007 STANDARD WELDING DETAILS (SHT 1 TO SHT 3)
7500
= = A1-2055-S-0283 CENTRAL ISLAND FLARE STRUCTURE G.A.
EL(+)121.125
A1-2055-S-0306 FLARE BRIDGE SUPPORT JACKET 3 - ELEVATIONS
625
EL(+)120.500
A1-2055-S-0307 FLARE BRIDGE SUPPORT JACKET 3 - PLANS
(LEVEL 1)
1875
225
1250
PE PI
PE ARRANGEMENT & DETAILS
76 32
2X 3.9
31 A1-2055-S-0372 FLARE BRIDGE 3 - ELEVATIONS
X1
3250
.75
2 .70
A1-2055-S-0373 FLARE BRIDGE 3 - PLANS
D PB
PIPE 273 (REF) 07/01/2014 ISSUED FOR CONSTRUCTION MMC VS NB
EL(+)114.500 PJ
C ISSUED FOR APPROVAL MMC PB VS
(LEVEL 2) PIPE 273 (REF) PIPE 273 (REF) 27/11/2013 NB
PJ
B 05/09/2013 PB
RE-ISSUED FOR REVIEW MMC VS NB
PJ
500
A PB
100 28/07/2013 ISSUED FOR REVIEW MMC VS NB
PJ
PIPE 762X15.88
PI
P
2
E
X1
4200
27
3.1
3.1
27
X1
E
2
P
Co ns t r u
eu m
CONSULTANT/CONTRACTOR/VENDOR
cti
r ol o
et
n
P
Co
al
m
Nat io n
TECHNIP & NATIONAL PETROLEUM
pan y
1300
2100
SmartSketch in A12055S0310_001.sha
DWG.No. 9800C-100-DW-3641-745
800
EL(+)107.700
FINAL PILE CUT-OFF
PROJECT: UPPER ZAKUM 750K PROJECT P-7511
PIPE 762 (REF)
SUB-SEA PIPELINES, CABLES, OFFSHORE STRUCTURES
EL(+)106.800
TOP OF JACKET
& BROWNFIELD [EPC-1]
TITLE:
PIPE 928 (REF) WORK PACKAGE - 4B
1 CENTRAL ISLAND FLARE BRIDGE SUPPORT 3 MSF
0316 ELEVATION ROW A2-B3 ELEVATIONS
SCALE EDMS DWG No.
1:75
PROJECT No. DWG No. A1-2055-S-0310 SHT.No. REV.
P-7511 001 D
D.O.P EDITION No.
D
KEY ELEVATION
PLANT
1 3 2
PREVAILING
NORTH
WIND
° EL (+)121.125
60
25°
TRUE EL (+)120.500
NORTH 1 3 2 (LEVEL 1)
1 3 2 7500
THIS
7500 3750 3750 DRAWING
3750 3750 25 2100
OFFSET = =
(TYP) EL (+)114.500
PIPE 610X25.40 PIPE 610X25.40 PIPE 610X25.40 (LEVEL 2)
B B
A
PIPE 323.9X12.70
PIPE 323.9X12.70
PIP
.70
-
12
E2
70 PI
. 385 PE
.1X
12
73
1X 27 EL (+)108.500
73
.1X
3 . (TYP) 3.
= = 1X
E2
27
12
12
PE
PIP
.70
.7
PI 0 EL (+)106.800
TOP OF JACKET
BRIDGE 04
OF
PIP
PIPE 323.9X15.88
PIPE 323.9X15.88
.05
L
C
1500 (TYP)
(TYP)
19
E2
100
.1X
73
6495
6495
= =
= =
NOTES
73
.1X
E2
19
PIP
.05
1. FOR GENERAL NOTES REFER DWG. NO. A1-2000-S-0002.
2. LEVELS SHOWN ON THIS DRAWING ARE REFERRED TO CHART DATUM AT EL.()0.000
PI WHICH IS EQUAL TO EL.(+)100.000 IN LOCAL DATUM.
70
PE
1 2.
PIP
.70
27 1X
PIPE 323.9X12.70
PIPE 323.9X12.70
3. 3. LEGEND:
12
E2
1X 27
.1X
12
PE
73
.7 INDICATES MATERIAL WITH THROUGH THICKNESS PROPERTIES
PI
73
.1X
E2
12
PIP
.70
MATERIAL TAKE OFF
LENGTH (m) WIEIGHT (kg)
PIPE 273.1X12.70 PIPE 273.1X19.05 PIPE 273.1X12.70 QTY DESIGNATION CAT MATERIAL OR AREA (m2) UNIT TOTAL
A A - PIPE DIA.273.1X12.70 I S355G1+N 51.46 81.55 4196
= = - PIPE DIA.323.9X12.70 I S355G1+N 9.99 97.47 974
PIPE 610X25.40 PIPE 610X25.40 PIPE 610X25.40 - PIPE DIA.323.9X15.88 S S355G14+N 3.00 120.64 362
3050 1400 3050 2150
PIPE 762 (REF) - PIPE DIA.273.1X19.05 S S355G15+N 4.20 119.35 501
PIPE 762 (REF) (TYP) (TYP) (TYP) = = FOR FLARE BRIDGE LANDING SUPPORT - PIPE DIA.610X25.40 I S355G7+N 10.75 366.17 3936
(TYP) (TYP)
REFER DWG. NO A1-2055-S-0312 - PIPE DIA.610X25.40 S S355G8+N (Z35) 4.25 366.17 1556
CL OF BRIDGE 03 - PIPE DIA.762X31.75 S S355G8+N (Z35) 3.75 571.75 2144
- PIPE DIA.355.6X19.05 I S355G1+N 0.81 158.11 129
PLAN AT EL.(+) 114.500 CL. OF PIPE PLAN AT EL.(+) 120.500 CL. OF PIPE -
-
PLATE 8 THK
PLATE 12 THK
A
II
S275JR
S355J0
2.58
0.31
62.80
94.20
162
29
(LEVEL 2) (LEVEL 1) -
-
PLATE 15 THK
PLATE 25 THK I
I S355G2+N
S355G7+N
0.27
1.13
117.750
196.25
30
222
Total in kg 14242
REFERENCE DRAWINGS
A1-2055-S-0275 FLARE BRIDGE SUPPORT JACKET DRAWING LIST
B1 B3 B2
A1-2000-S-0005 TO 0007 STANDARD WELDING DETAILS-SHT 1 TO 3
7500
A1-2055-S-0283 CENTRAL ISLAND FLARE STRUCTURE G.A.
12 THK X DIA 230 250
3750 3750 CLOSURE PLT A1-2055-S-0310 FLARE BRIDGE SUPPORT 3 MSF - ELEVATIONS
100
CONE 355.6x250x12 FLARE BRIDGE 3 - ELEVATIONS
A1-2055-S-0372
100LG
1 DIA 740X8 THK 15 THK PLT A1-2055-S-0373 FLARE BRIDGE 3 - PLANS
CLOSURE PLT 300X215
- (TYP) (AT 6 LOCATIONS) PIPE 324 (REF) 25 THK CLOSURE PLT
OD 685.8 @ 4 NOS
A1-2055-S-0382
PIPE 355.6X19.05
FLARE BRIDGE 4 - ELEVATIONS
EL(+)121.125 EL(+)121.713 (TYP)
A1-2055-S-0383 FLARE BRIDGE 4 - PLANS
(PIN)
PIPE 610 (REF) PIPE 610 (REF)
(TYP)
(TYP)
625
215
813
A1-2055-S-0312 FLARE BRIDGE SUPPORT 3 MSF - BRIDGE LANDING
EL(+)120.500
PIPE 762X31.75
588 DETAILS
A0-2055-M-0003 PLOT PLAN CENTRAL ISLAND - EPC-1 FLARE
(TYP)
C
300
(TYP)
(TYP)
1875
(TYP)
1250
PB
EL(+)121.125 T.O.S.
(TYP)
PJ
PIPE 762 (REF) B PIPE 356 (REF) C 27/11/2013 ISSUED FOR APPROVAL MMC
PB
VS NB
PIPE 762 (REF) PJ
400
450
PB
(TYP) B 05/09/2013 RE-ISSUED FOR REVIEW MMC VS NB
PJ
PIPE 762X31.75 PB
A 28/07/2013 ISSUED FOR REVIEW MMC VS NB
C SECTION PJ
PIPE 762 (REF)
(TYP)
PI
2.7
PE
X1
27
3.1
200
3.1
27
X1
PI
0
CONSULTANT/CONTRACTOR/VENDOR
cti
r ol o
et
n
P
Co
al
m
Nat io n
TECHNIP & NATIONAL PETROLEUM
pan y
1 DETAIL
CONSTRUCTION COMPANY (NPCC)
- SCALE 1:20
SmartSketch in A12055S0311_001.sha
(TYP) DWG.No. 9800C-100-DW-3641-746
PIPE 762 (REF) PROJECT: UPPER ZAKUM 750K PROJECT P-7511
EL(+)114.500 PIPE 762 (REF) SUB-SEA PIPELINES, CABLES, OFFSHORE STRUCTURES
& BROWNFIELD [EPC-1]
TITLE:
SECTION WORK PACKAGE - 4B
B
- SCALE 1:20 CENTRAL ISLAND FLARE BRIDGE SUPPORT 3 MSF
A SECTION PLANS
-
SCALE EDMS DWG No.
1:50
PROJECT No. DWG No. A1-2055-S-0311 SHT.No. REV.
P-7511 001 D
D.O.P EDITION No.
D