Professional Documents
Culture Documents
01 - 6040 BH MDG Sil - 01 - 01
01 - 6040 BH MDG Sil - 01 - 01
01 - 6040 BH MDG Sil - 01 - 01
83
25/B1 -2Y1/1 BUCKET CYLINDER OUT K6 2/1 -3B8 CONTAMINATION SWITCH / PUMP TRANSFER GEARBOX 1 K16 FILTER BLOCK 4 bar 4 bar B MB
high pressure supply lines 25/B2 -2Y2/1 BUCKET CYLINDER IN K5 2/2 -4B8 CONTAMINATION SWITCH / PUMP TRANSFER GEARBOX 2 E16 40µm 40µm
medium pressure supply lines 25/B3 -2Y3/1 BOOM CYLINDER IN K5 2/1 -3B11 PRESSURE SENSOR / PUMP TRANSFER GEARBOX 1 K16 16/2 CUMMINS
Vg max Vg min n=1490 U/min
low pressure lines 25/B4 -2Y4/1 BOOM CYLINDER IN-FLOAT K5 2/2 -4B11 PRESSURE SENSOR / PUMP TRANSFER GEARBOX 2 E11 CHARGE PUMP n=1448 U/min
25/B5 -2Y5/1 BOOM CYLINDER OUT K5 KP3/100 CAT
pilot lines 25/B6 -2Y6/1 STICK CYLINDER IN-PRESSURE K5 3/1 -3B2 CONTAMINATION SWITCH / MAIN PUMP 1 K15
Q=145 l/min
M1 R T K K1 M S
25/B7 -2Y16/1 SWING RIGHT K4 3/2 -3B3 CONTAMINATION SWITCH / MAIN PUMP 2 H15
main lines 25/B8 -2Y15/1 SWING LEFT K4 3/3 -4B2 CONTAMINATION SWITCH / MAIN PUMP 3 B15 C -4B2 192/2
drain/return/suction lines 3/4 -4B3 CONTAMINATION SWITCH / MAIN PUMP 4 F15 6 bar
B 25/intern -2Y18/1 SOLENOID VALVE PILOT ON/OFF J6
B
component lines 25/intern -2Y20/1 SOLENOID VALVE TRACK TENSIONING K6 146 -2B1 PRESSURE SWITCH / SERVICE ARM K10
73/1 -2B8 PRESSURE SENSOR / HYDRAULIC TANK E9 X2 X1 194/2
jump connection: 26/A1 -2Y22/1 SECOND SPEED (TRAVEL) J8 36 -5B5 CONTAMINATION SWITCH / FILTER G11
191/2
[page_coordinates_component] 26/A3 -2Y23/1 SWING BREAK J8 103/4 1 bar Ø3 mm
A1
26/A4 -2Y24/1 DRIVE PRESSURE INCREASE J8 25 -2B31 PRESSURE SENSOR / SWING BALANCE VALVE LEFT L5 A B 193/2
110/1 -2Y25/1 CONTROL VALVE SWING LEFT K6 25 -2B32 PRESSURE SENSOR / SWING BALANCE VALVE RIGHT L5 Z 8/2
CONTROL OF THE LOGIC ELEMENTS 110/2 -2Y26/1 CONTROL VALVE SWING RIGHT K6 33/1 -2B33 PRESSURE SENSOR / VALVE BLOCK E11 400 bar FAN PUMPS 400 bar U
1.) TWO ENGINES OPERATION: 105 -2B34 PRESSURE SENSOR / SWING BALANCE VALVE E11 LA10VO71 ED72/31R P
Q=124 l/min -4B16
A+B = OPEN 23/1 -3Y1 PROPORTIONAL VALVE PUMPS LEFT G12 26 -2B36 PRESSURE SENSOR / SLEW PARK BRAKE E9 B2 B1 0-5 bar
C+D = CLOSED 23/2 -4Y1 PROPORTIONAL VALVE PUMPS RIGHT G10 105 -2B39 PRESSURE SENSOR / SIL VALVE LEFT E11 R
53 -2Y19 SOLENOID-VALVE EMERGENCY DROP J3 105 -2B41 PRESSURE SENSOR / SIL VALVE RIGHT E11 RH SWING CIRCUIT
2.) ONE ENGINE OPERATION: 46 -2Y21 LOGIC-VALVE F11 103/3 BLOCKING VALVES CUMMINS
A+B = CLOSED A1 n=1800 U/min
A B
C+D = OPEN NOTE:
n=1750 U/min
CAT
C NOTE: Z C
ABBREVIATIONS VALUES ON HYDRAULIC SCHEMATICS ARE ONLY TO BE USED AS A QUICK REFERENCE. FOR DETAILED INFORMATION REGARDING ELECTRICAL SIGNALS, SEE THE
SCHEMATICS REFLECT COMPONENT PRESSURE LEVELS AND DO NOT TAKE INTO ACCOUNT ELECTRICAL SCHEMATIC OF THE SPECIFIC MACHINE. -4B28 -4B29
ps = piston side L3 L4 S2 L1 L2 S1 100 bar
DOWNSTREAM LINE RESTRICTION, RETURN CHECK VALVES OR BOOSTED DRAIN PRESSURE. U U
rs = rod side P T
140/2
R
RH = RIGHT HAND
ACTUAL VALUES ARE LISTED IN THE TECHNICAL PUBLICATIONS. OIL TEMPERATURE, ENGINE 1/2 KM3/10
LH = LEFT HAND ENGINE 0
SPEED AND CONTROL SETTINGS CAUSE VARIATIONS IN PRESSURE READINGS AND FLOW RH TRACK TENSION
RATES AND MUST BE CONTROLLED TO PROVIDE CONSISTENT READINGS. CYLINDER 34/4 34/3 M2 143/2
746 kW CUM (C1200)
131/2 40µm 40µm
n=1800 U/min
RH ENGINE
COOLING
130/2 120/2 4/2 758 kW C32 CAT
n=1750 U/min
50 bar
TRACK TENSION RELIEF 132/2 RH TRAVEL GEARBOX -4B7 -4B15
U
-4B12 SWING PUMPS -4B14
P 100 bar 2xA4VG125 DGD 1/32L -4B6
133 CONTROL MANIFOLD C T Q=321 l/min C T
P1 T1 T1 Fa
T1 Fa
121/4 RH TRAVEL MOTORS 121/3 DRAIN 72/1
LA-A4VSE250 72/2 COLLECTORS
70 bar A1 HZ/10WX RH LH
(2X) (2X)
400 bar 400 bar
D
B1
134/1 RH ATTACHMENT Ø1mm Ø1mm
D
330 bar CONTROL MANIFOLD 161 T1 T1
CUMMINS
T T n=2645 U/min
LOGIC VALVE
SPEED T2 SPEED T2 n=2571 U/min
CONTROL PARK CONTROL PARK A C
BLOCK CAT
BRAKE BRAKE -4B22 U
43/4
A2
B4 rs 47/2 0-400 bar P
134/2 350 bar A C
-4B23 U 400 bar 400 bar
B2
330 bar A4 ps 350 bar
0-400 bar P
43/3 25 bar 25 bar
ST ST X2 X1 X2 X1
A3
B3
BUCKET
P2 T2
G B4 rs PRESSURE 64/4
100 bar 100 bar A M G T1
G
172/1 350 bar 97/1 36 B MB
ps 350 bar
FILTERS LH 61
A4
97/2
T T 44/2 β(5.5)=200 C -5B5 44/1
LH TRAVEL
4xØ10mm 189/1 T CUMMINS
173/2 34/2 Vg min Vg max Vg max Vg min n=1490 U/min
350 bar n=1448 U/min
BOOM 39/2 CAT
P2
350 bar
121/2 121/1 43/2
STICK STICK U 194/1
-3B22 191/1
CYLINDER 182/1 B B
400 bar
P
43/1 34/2 34/1 40µm 40µm 1 bar
40µm Ø3 mm
B2 rs
-3B23
U U -3B12 4/1 193/1
H 350 bar
400 bar
P P 100 bar H
BOOM A2 ps 350 bar MB MB -3B15 SWING PUMPS -3B14
-3B7 2xA4VG125 DGD 1/32L -3B6
CYLINDER B D 47/1 C T Q=321 l/min C T
U
P
C -5B10 T1 Fa T1 Fa
103/2 -3B16
ST 100/2 0-5 bar
A1
SPARE ST -2B19 -5B11
U 102/2 A B
(2X) (2X)
T C Z
400 bar 400 bar
Ø1mm Ø1mm
B1 rs LOGIC VALVE
350 bar BLOCK 102/3 CUMMINS
n=2645 U/min
A1 ps 350 bar 100/3
T1 T1 n=2571 U/min
PARK PARK SWING MOTORS CAT
BRAKE T2 BRAKE T2
-5B9 R
SPEED SPEED
CONTROL CONTROL C LH SWING CIRCUIT
100/1 103/1 BLOCKING VALVES 25 bar 400 bar 25 bar 400 bar
BUCKET -2B17 U -3B28 -3B29
U -2B18 A1 100 bar
132/1 P P 102/1 A B
U U
P1
LA-A4VSE250
400 bar
400 bar P T 140/1
Z
LA-A4VSE250 HZ/10WX
KM3/10
HZ/10WX 1/1 ENGINE
131/1 130/1 0
I 50 bar LH TRAVEL MOTORS I
M1 143/1
X2 X1 746 kW CUM (C1200)
n=1800 U/min LH ENGINE
LH TRACK TENSION LH TRAVEL GEARBOX -2B36
U R COOLING
P 758 kW C32 CAT
CYLINDER 120/1 100 bar n=1750 U/min
SPEED CONTROL
STICK CYLINDER OUT 26 AUXILIARY MANIFOLD 8/1
FAN PUMPS
38 400 bar
LA10VO71 ED72/31R
400 bar
50 bar -2Y22 50 bar -2Y24 50 bar -2Y23 50 bar 40 bar Q=124 l/min
authority. Offenders are liable to the payment of damages. All rights
communication of contents thereof, are forbidden whithout express
B2 B1
Copying of this document, and giving it to others and the use or
ENGINE OFF
LOWERING T
TRAVEL LEFT REVERSE
P1 P2 CUMMINS
52 -2Y19 53 TRAVEL LEFT FORWARD A1 A4 A3 A2 NOT USED n=1800 U/min
22 bar
TRAVEL RIGHT FORWARD TRAVEL RIGHT REVERSE SWING BRAKE n=1750 U/min
CAT
ON/OFF 35 bar
19 145
-2Y18 80 bar LUBE PUMP STATION XD X1 X2
3/1
Ø0.5 mm Ø0.5 mm
FAST FILL MAIN PUMP
60 bar
ACCESS LADDER 150 CONTROL VALE 300/350 APA4VSO500-HD
bar 1B/30L
A
-2Y15 -2Y16 -2Y6 -2Y5 -2Y4 -2Y3 -2Y2 -2Y1 -2Y20
152 C SERVICE ARM -5Y6.1 UP Q=723 l/min
B
MB8 B8 MB7 B7 MB6 B6 MB5 B5 MB4 B4 MB3 B3 MB2 B2 MB1 B1
151
STICK CYL K
IN-PRESSURE 65 bar
153 M2
146
U U
BOOM CYLINDER OUT P P C
A 148 P
BOOM CYLINDER IN FLOAT A B A B B
K BOOM CYLINDER IN 147
48 bar
B MB
BUCKET CYLINDER IN A P C -3B8
-2B1 -5Y6.2 DOWN
BUCKET CYLINDER OUT
"Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung
20 bar P
B T
R P 16/1 CUMMINS U
Vg max Vg min n=1490 U/min -3B11
CHARGE PUMP T
und Mitteilung ihres Inhalts nicht gestattet, soweit nicht aus-
BOOM BOOM
BUCKET
P P
SWING
T T
LEFT CRAWLERS
STICK
L STICK
Datum Name Benennung/Description Format/
LUBE BARREL Format:
Bearb./Prepared 04-09-2014 GeHa
Hydraulic Schematic 6040 BH
FORWARD REVERSE SWING
SWING RIGHT
U
Gepr./Checked
Norm/St. Check
MDG+SIL AS
-2B32
P 100 bar Berab.Abt./Prep.by dept. 21183
SWING LEFT
296 00 1 B4372 Aug.11-2014 GeHa
0 Blatt
U
Sach-Nr Sheet 1
-2B31
P 100 bar Typ BG UBG 0 B4158
Änderungs-Nr
04-14-2014 GeHa
Datum
Part No 3758556 F.K.
Size 1 Blätter
Sheets