BILL OF MATERIAL
BILL OF MATERIAL
BILL OF MATERIAL
BILL OF MATERIAL
BILL OF MATERIAL
BAUT + MUR
1 Baut+Nut+Ring B-01 M10 - 25 178 14.81
2 Baut+Nut+Ring B-02 M10 - 30 33 2.99
3 Baut+Nut+Ring B-03 M12 - 30 476 57.12
4 Baut+Nut+Ring B-04 M12 - 35 1350 171.86
5 Baut+Nut+Ring B-05 M12 - 40 192 25.17
6 Baut+Nut+Ring B-06 M12 - 45 104 14.14
7 Baut+Nut+Ring B-07 M16 - 50 88 23.65
8 Baut+Nut+Ring B-08 M16 - 55 304 85.36
395.10
SUB TOTAL MUR BAUT 395.10
GRAND TOTAL TOWER SIKU & MUR 6,106.42