Boq Cme: 1 Pole Foundation Soil Work
Boq Cme: 1 Pole Foundation Soil Work
Civil, Mechanical, Electrical
Vendor name : PT. Cakra Hexa Swadaya
PO No :
PO Subject :
Site : MONOPOLE 12m - Greenfield
BOQ CME BOQ Plan BOQ Actual QTY Amount Dibayarkan Sesuai PO Amount Additional
NO PEKERJAAN UoM Unit Price (IDR) Qty Unit Amount (IDR) Sisa PO Qty Amount (IDR) Qty Amount (IDR) Qty Amount (IDR)
1 pole Foundation
Soil work
a. Excavation of soil for foundation ‐ m3
b. Sand layer under the foundation t=5cm ‐ m3
Concrete work
d. Concrete work floor (lean concrete 5cm) ‐ m3
e. Concrete K‐225
‐ Weight of steel (WoS) with SNI 07.2052 1990/JIS G‐3112 Standard 175.34 kg
‐ Concrete K‐225 with SK SNI 03.2002 Standard 1.83 m3
Borepile
f. Bored Pile Ø 60cm (supply and installation) logitudinal bar 30 pcs ‐ m
2 Outdoor Foundation
Soil work
a. Excavation of soil for Outdoor Foundation ‐ m3
b. Aanstamping under the Outdoor Foundation t=15cm ‐ m3
c. Sand layer under the Outdoor Foundation t=5cm ‐ m3
Concrete work
d. Concrete work floor (lean concrete 5cm) ‐ m3
e. Concrete K‐225
‐ Weight of steel (WoS) with SNI 07.2052 1990/JIS G‐3112 Standard 19.58 kg
‐ Concrete K‐225 with SK SNI 03.2002 Standard 0.20 m3
Prepared by: Approve By :
PT. CAKRA HEXA SWADAYA