Evaluation Report Construction of Additional Block at PEC HQ ISLAMABAD

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
EVALUATION REPORT (As Per Rule 35 of PP Rules, 2004) 1 Name of Procuring Agency: Pakistan Engineering Counci 2 Method of Procurement Single Stage Two Envelope nal Block (New Block) at PEC HQ Islamabad 3 Title of Procurement Construction of Addi 4 Tender Inquiry No. 5 PPRA Ref. No, (TSE) 754394316 6 Date & Time of Bid Closing 2ist December 2020 at 14:30 hours Technical Bid : 21st December 2020 at 15:00 hours 7 Date & Time of Bid Opening Financial Bid : 20th January 2021 at 11:00 h 8 No. of Bids Received Four (04) \dard Bidding De 9 Criteria for Bid Evaluation [As per evaluation criteria prescribed in 10 Details of Bid(s) Evaluation Marks Evaluated Cost | Rule/Regulation/SBD/Policy/Basis for Name of Bidder (PkR) Rejection/Acceptance as per Rule 35 of PP| Technical Rules, 2004 [Shahid Builders (Pvt.) Ltd (SBL)- National PP Rule 36 (b) (ix) Logistic Cell Engineers (NLC) JV 84.00 1,310,789,491_| __ Most Advantagous Bid (Highest rank) [a.m & Company- Ismail Construction ; |Company (Pvt.) Ltd JV Non-Responsive | __Un-Opened ce ISARHAD ENGINEERING & ELECTRIC COMPANY Non-Responsive | __Un-Opened non, Responsive be) Hi-Tech Constructors Non-Responsive bid Non-Responsive | _Un-Opened Cn the basis of Report submitted by the Project Consultant endorsed by Project Director, Head PMU and recommendation by PEC Bid Evaluation Committee, the Competent Authority approved to issue Letter of Acceptance (LOA) to the Most Advantagous Bidder i.e M/S Shahid Builders (Pvt.) Ltd (SBL)- National Logistic Cell Engineers (NLC) JV - fuser) _ Signature: in PROJECT DIRECTOR Official stamp ——Patictan Engineering Counci Islamabad Scanned with CamScanner

You might also like