Proposed International Level Cricket Stadium cum Sports Complex

At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

APPENDIX - I
(See par
paragra
agraph-
ph-6)
FORM 1
I. Basic Inform
Information
rmation

S. No. Item Details


1. Name of the project Proposed International Level Cricket Stadium cum
Sports Complex
2. S. No. in the Schedule Building and Construction Project, Category ‘B’ [(As
per 14.09.2006 Notification, Project or Activity-8 (a)]
3. Proposed 141860.66 sq. m.
Total Project Site Plot Area
capacity/area/length/tonnage to be (14.186 ha.)
handled/command area/lease Permissible Ground 42558.19 sq. m.
area/number of wells to be drilled Coverage (30%)
Proposed Ground Coverage 13777.60 sqm
Permissible FAR 37500 sq. m.
Proposed FAR 23274.18 sq. m.
Built up (sq. m) 29272.70 sq. m.

4. New/Expansion/Modernization New Project


5. Existing Capacity/Area etc. Not Applicable as this is new Building construction Project.
6. Category of Project i.e. 'A' or 'B' As per EIA Notification dated 14.09.2006 and as
amended time to time, the project falls in Category ‘B’,
Project activity S. No. - 8 (a)]
7. Does it attract the general No, it does not attract the general condition, as
condition? If yes, Please specify. General Conditions are not applicable on S. No. – 8
projects of EIA Notification dated 14.09.2006.
8. Does it attract the specific No, it does not attract the specific condition, as Specific
condition? If 'yes, please specify. Conditions are not applicable on S. No. – 8 projects of
EIA Notification dated 14.09.2006.
9. Location: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam
Budh Nagar, State: U.P.
Plot/Survey/Khasra. No. Land document is enclosed as Annexure I
Plot No. SC-01/CS
Tehsil Noida
District Gautam Budh Nagar
State U.P.
10. Nearest Railway Station/ Airport Nearest Railway Station: Okhla Railway Station 24.0
along with distance in kms. km in NW direction from the Project Site (approx).

M/s. ATS Infratech Pvt. Ltd. 1 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

Nearest Airport: Indira Gandhi International Airport,


Delhi approx. 39.0 km in WNW direction from the
Project Site.
11. Nearest Town, city, District The Project site fall within Noida Development
Authority limits. District Headquarter, Noida.
Headquarters along with distance in
kms.
12. Village Panchayats, Zilla Parishad, Noida Development Authority
Municipal Corporation, Local body
Sector 6, Noida – 201301, District. Gautam Budh
(complete postal addresses with
Nagar, Uttar Pradesh, India
telephone nos. to be given)
Fax: 91- 120- 2422210-317
Help Line No. 2425025
E-Mail: noida@noidaauthorityonline.com
13. Name of the applicant M/s. ATS Infratech Pvt. Ltd.
14. Registered address 711/92, Deepali, Nehru Place, New Delhi-110019
15. Address for correspondence (1) : ATS Tower, Plot No. 16, Sector-135, Noida
Name Mr. S.J. Raza
Designation (Owner/ Partner/CEO) Authorized signatory

(Authorization Letter is enclosed as Annexure I)


Address Flat No. G-25 , Ground floor, Block –C, Gaur global
village, Crossing Republic , Ghaziabad, U.P

Pin Code 201016


E-mail sjraza@atsgreens.com
Telephone No. 09711098902
Fax No. -
Address for correspondence (2): Environment Consultant
Mr. Sunil Dixit
(Associate Director)
J. M. EnviroNet (P) Ltd.
1st & 2nd Floor, S.C.O. 16,
Sector 10 – A, Gurgaon (Haryana)
Tel. 0124 – 3206559
Mobile No. 09971699906
Email: jmgurgaon@hotmail.com
Disclosure of the consultant has been enclosed as

M/s. ATS Infratech Pvt. Ltd. 2 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

Annexure II
III

16. Details of Alternative Sites Not Applicable, as It is a construction project which is


examined, if any. always on a pre-determined site for which the license /
Location of these sites should be CLU issued by the development authority /
shown on a topo sheet. department. Keeping in view the above narrated facts,
no alternative site can be given here.
17. Interlinked Projects Not Any, as this is independent Proposed International
Level Cricket Stadium cum Sports Complex Building
development construction project
18. Whether separate application of Not Applicable, as this is a case of independent
interlinked project has been “International Level Cricket Stadium cum Sports
submitted Complex” Building development construction project
19. If yes, date of submission Not Applicable, as this is a case of independent
“International Level Cricket Stadium cum Sports
Complex” Building development construction project
20. If no, reason Not Applicable, as this is a case of independent
“International Level Cricket Stadium cum Sports
Complex” development Building construction project
21. Whether the proposal involves Not Applicable, as no approval / Clearance involves
approval/ clearance under: if yes, under any Notification and under any Act, as It is
details of the same and their status “International Level Cricket Stadium cum Sports
to be given. Complex” Sports Complex Building development
(a) The Forest (Conservation) Act, construction project at Plot No. SC-01/CS, Sector 152,
1980? Noida, District: Gautam Budh Nagar, State: U.P.

(b) The Wildlife (Protection) Act,


1972?
(c) The C.R.Z. Notification, 1991?
22. Whether there is any Government The project was under bid for planning, designing,
Order/ Policy relevant/ relating to financing, construction, marketing operations and
the site? maintenance of proposed “International Level Cricket
Stadium cum Sports Complex”. The lease documents
are enclosed as Annexure I.
23. Forest land involved (hectares) No Forest land involved in “International Level Cricket
Stadium cum Sports Complex” Sports Complex
Building development construction project
24. Whether there is any litigation No litigation is pending against the project and/or land
pending against the project and/or in which the project is proposed to be set up.
land in which the project is
proposed to be set up?
(a)Name of the Court

M/s. ATS Infratech Pvt. Ltd. 3 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

(b)Case No.
(c) Orders/directions of the Court if
any and its relevance with the
proposed project
II. Acti
Activity

1. Construction, operation or decom


decommissioning of the Project inv
involving actions, which will
cause ph
physical changes in the localit
ocality (topograph
(topography, land use, change
changes in w ater bo
bodies, etc.)

S. Information / Checklist Yes/ Details there


thereof
reof (with appr
approximate qua
quantities/
uantities/ ra
rates
tes,
No confirma
confirmation No where
herev
rever possible) with source of information da
data
1.1 Permanent or temporary change No The proposed project “International Level Cricket
in land use, land cover or Stadium cum Sports Complex” Sports Complex building
topography including increase in development on vacant land. (Lease documents are
intensity of landuse (with respect enclosed as Annexure II).
to local landuse plan) There will be green-area development on 75768.21 sq.
m (53.41% of the plot area) to provide beautiful and
natural environment to the site.
1.2 Clearance of existing land, No The proposed site is an open land, with scanty
vegetation and buildings? vegetations mainly herbs and low lying shrubs &
possesses existing no structure. Hence no clearance of
structure and vegetation will be required.
Site photographs showing the present condition of the
site has been enclosed as Annexure IV.
1.3 Creation of new land uses? No As the project site is earmarked for Sports Complex
building development; hence no change in land use is
envisaged.
1.4 Pre-construction investigations Yes Soil investigation was carried out and the results were
e.g. bore houses, soil testing? found satisfactory. Geotechnical investigation report is
enclosed herewith as Annexure VII.
1.5 Construction works? Yes This is a building construction for “International Level
Cricket Stadium cum Sports Complex” project. The
construction activities will be confined within the
project site; there will be no physical changes due to
project development activities outside the project
boundary.
1.6 Demolition works? No The proposed site is an open land, possesses no
existing structure. Hence no demolition is required.
1.7 Temporary sites used for No No temporary residential facilities will be required for
construction works or housing of the workers, as all the workers will be coming from

M/s. ATS Infratech Pvt. Ltd. 4 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

construction workers? nearby area. The construction work will be done only
in the daytime.
There will be provision of facilities such as rest shelter,
drinking water, toilet etc. for workers at the project site
& will be arranged by contractor.
1.8 Above ground buildings, Yes Excavation will be carried out for foundation and
structures or earthworks construction of basements. The total excavated quantity
including linear structures, cut of earth material will be used at the site itself for the
and fill or excavations purpose of development of project site and
horticultural development.
1.9 Underground works including No No underground works including mining / tunneling
mining or tunneling? is required except excavation of earth only for the
foundation and construction of basement.
1.10 Reclamation works? No As, this is a new construction project hence; no
reclamation work required.
1.11 Dredging? No No dredging required, as case of “International Level
Cricket Stadium cum Sports Complex” building
development project.
1.12 Offshore structures? No There are not any offshore structures, as case of
“International Level Cricket Stadium cum Sports
Complex” building development project.
1.13 Production and manufacturing No Since, it is a construction Project, hence, no production
processes? / manufacturing process is involved.
1.14 Facilities for storage of goods or Yes Separate raw material storage yard will be made
materials? during construction phase:
• Cement will be separately stored under cover in
bales.
• Sand will be stacked neatly under tarpaulin
cover.
• Bricks and steel will be laid in open
• The raw material handling yard will be located
within the project site and separated by enclosures.
1.15 Facilities for treatment or Yes Solid Waste
disposal of solid waste or liquid Solid waste generated will be comprising of domestic
effluents? waste (inorganic and organic waste) and e-waste
(generate after a latency period of 4 -5 years).
Domestic wastes:
wastes:
Approximately, 13469.25 kg/day domestic solid waste
M/s. ATS Infratech Pvt. Ltd. 5 JM EnviroNet Pvt. Ltd.
Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

(Permanent Population: 202.50 kg/day & Floating


Population: 13266.75 kg/day) is estimated to be
generated during Peak days & Approximately, 876.75
kg/day domestic solid waste (Permanent Population:
202.50 kg/day & Floating Population: 674.25 kg/day)
is estimated to be generated during Non-Peak days
from the project activity. Base of calculation @
450gms/person/day for residential and 250
gm/person/day for floating population.

Commercial Waste (E-


(E-wastes):
wastes : E-waste will start being
generated after a latency period of 4-5 years. Since
most of these components are recyclable in nature,
efforts will be made to recycle it to the maximum
extent, hence actual waste generated as E-waste should
be minimal. It is estimated that from the project about
0.05-0.10 MT/yr E-waste will be generated.

Management of E-
E-waste

The principle idea of E-waste management is to recycle


the E-waste generated. Authorized vendors of
electronic goods will take back their old
equipment/cartridge/toner rolls etc. and pay some
concessions on the new equipment. On the other hand,
reusable material like cartridges/toners will be refilled
and reused. Outdated computers/ fax/ phones etc. will
be value added and sold to downstream uses through
resellers. These arrangements will be made with existing
CPCB authorized vendors to simultaneously &
effectively reduce the quantity of E-waste generated
and also to generate substantial revenue for running the
management system. Whatever E-waste left, will be
collected separately in HDPE drums and will be stored
in special containments, onto puckka platforms and
under lock and key. The collected e –waste will be
handed over to the CPCB authorized vendors.

Liquid Effluent:
Effluent :
During construction phase, sewage will be treated and
disposed through septic tanks with soak pits. During
operation phase, 137.18 KLD waste water will be
generated which will be treated in the Sewage
Treatment Plant (STP) having capacity of 170 KLD up to
M/s. ATS Infratech Pvt. Ltd. 6 JM EnviroNet Pvt. Ltd.
Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

tertiary level.
Dewatered/ dried sludge from STP will be used as
manure in horticulture.
Hazardous Wastes:
Wastes :
No hazardous wastes will be produced from project
activities except some Spent Oil (Category 5.1)
generated from D.G. sets; it will be sold to recyclers
authorized by State Pollution Control Board.
1.16 Facilities for long term housing of No No facilities for long term housing of operational
operational worker worker are proposed.
1.17 New road, rail or sea traffic No The project site is well connected by wide service road,
during construction or So no new road will be laid during construction or
operation? operation of the project activities except for internal
roads.
1.18 New road, rail, air waterborne No The area is already developed. It is well connected by
or other transport infrastructure roads to whole of the city, so there will be no
including new or altered routes alteration of routes or lying down of new routes done
and stations, ports, airports etc? due to project activity. Internal roads within t h e
project site will be constructed for smooth movement
of traffic.
1.19 Closure or diversion of existing No There will not be any closure or diversion of existing
transport routes or infrastructure transport routes, as the “International Level Cricket
leading to changes in traffic Stadium cum Sports Complex” Sports Complex building
movements? is proposed within site premises. Thus there will not be
any change in traffic movement.
1.20 New or diverted transmission No There will not be any provision for new or diverted
lines or pipelines? transmission lines or pipelines for the proposed project.
1.21 Impoundment, damming, No No river is present near the project or crossing the
culverting, realignment or other project site; hence no impoundment, damming,
changes to the hydrology of culverting, realignment, or other changes to the
watercourses or aquifers. hydrology of surface watercourses are applicable here.
1.22 Stream crossings? No As such no river or drain is passing by the project site.
Hence not applicable in case.
1.23 Abstraction or transfers of water Yes The total water requirement of the project will be
form ground or surface waters? 927.10 KLD during peak days (which will be included
the fresh water requirement of 314.50 KLD.
Recycled treated water requirement of 612.60 KLD for
flushing) & 171.50 KLD during non-peak days (which

M/s. ATS Infratech Pvt. Ltd. 7 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

will be included the fresh water requirement of 113 KLD


and recycled treated water requirement of 58.50 KLD
for flushing).
The water will be sourced from Municipal Water
supply & proposed bore-wells for which permission will
be taken from the concerned authority.
1.24 Changes in water bodies or the No There will be no effect on Surface Drainage / Runoff as
land surface affecting drainage or the land area involved in the project is flat land. Apart
runoff? from this for collecting storm water, storm water
drainage network has been provided during the design
as per the guidelines. Adequate measures will be taken
to collect run off and suitable garlanding drain as per
the contours of the plot will be developed. Thus
Surface drainage will not be affected.
1.25 Transport of personnel or Yes Transport of personnel/ material during construction
materials for construction, and operation phase are envisaged. Road network for
operation or decommissioning? smooth flow of traffic and adequate parking space will
be provided for operational phase. During operational
phase, parking space will be provided as per Local
building by laws.
1.26 Long-term dismantling or No No long term dismantling/ decommissioning is
decommissioning or restoration Proposed.
works?
1.27 Ongoing activity during No No decommissioning activity is involved, Thus no
decommiss - ioning which could impact on the environment by the proposed project.
have an impact on the
environment?
1.28 Influx of people to an area in Yes The worker / employed will be hired from nearby
either temporarily or areas. Hence, there will be minor influx of people in
permanently? the area. Temporarily local labours will visit the site
during the construction phase and during operation
phase approx 1500 Persons will be involved in the
entire project
1.29 Introduction of alien species? No All the plant / tree species grown in the project
premises are indigenous to the area; same will be
continued so introduction of alien species is not
envisaged.
1.30 Loss of native species or genetic No No loss of native species or genetic diversity has been
diversity? reported so far.

M/s. ATS Infratech Pvt. Ltd. 8 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

1.31 Any other actions? None No other action will be undertaken except the above
mentioned for the Sports Complex building
construction project.
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-
non-renewable or in short supply):

S. Information / Checklist Yes/ Details


Details there
thereof
reof (w ith appr
approximate qua
quantities/
uantities/ ra
rates
tes,
No. confirma
confirmation No where
herev
rever possible) with source of information da
data

2.1 Land especially undeveloped or No The Proposed ‘‘International Level Cricket Stadium
agricultural land (ha) cum Sports Complex’’ development of Sports
Complex building Project on 141860.66 sq. m. (14.186
ha.) (Effective plot area) vacant land.

2.2 Water (expected source & Yes The total water requirement of the project will be
competing users) unit: KLD 927.10 KLD during peak days (which will be included
the fresh water requirement of 314.50 KLD.

Recycled treated water requirement of 612.60 KLD for


flushing) & 171.50 KLD during non-peak days (which
will be included the fresh water requirement of 113
KLD and recycled treated water requirement of 58.50
KLD for flushing).

Fresh water for domestic purpose, supply


from Municipal water supply & treated water supply
from near municipal STP for HVAC cooling.

2.3 Minerals (MT) No Not applicable

2.4 Construction material-stone, Yes Usual construction materials will be utilized like
aggregates, sand/ soil (expected Cements, Bricks, Sand, Iron rods, Fly ash based products,
source-MT) etc.
Source: Steel and cement will be procured from
authorized vendors. Sand & aggregate will be
procured from local material suppliers.

2.5 Forests and timber (source–MT) No Timber required will be taken from nearby markets.

2.6 Energy including electricity and Power requirement for the project will be 2229 KW.
fuels (source, competing users) Peak Days power requirement will be same as non-peak days
Unit: fuel (MT), energy (MW) as the facilities will be on D.G. backup and additional D.G. Sets
will be rented during peak days.sourced from Local grid
supply of Noida For emergency situation during power
failure, 4 D.G. sets of total capacity of 2500 KVA (2x750
KVA + 2x500KVA) will be used for back-up.

M/s. ATS Infratech Pvt. Ltd. 9 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

2.7 Any other natural resources (use None No other natural resource will be involved in the
appropriate standard units) project except the mentioned above.

3. Use, stor
storage,
orage, transpo
ansport,
port, handling or produ
productio
ction of subs
substances or materials, which could
be harmful to human health or the env
environment or raise concer
oncerns
erns about actual or
perc
perceiv
eived risks to human health
health.

S. Information / Checklist Yes/ Details there


thereof
reof (w ith appr
approximate qua
quantities/r
uantities/ra
ntities/rates,
No. confirma
confirmation No where
herev
rever possible) w ith source of information da
data

3.1 Use of substances or materials, No The proposed project is an “International Level


which are hazardous (as per Cricket Stadium cum Sports Complex” Sports Complex
MSIHC rules) to human health or building development Project, hence, no storage
the environment (flora, fauna, of hazardous chemicals (as per MSIHC rules) will be
and water supplies) done, except HSD required to run standby D.G. sets,
for which the quantity stored will be below the
threshold limit specified in the MSIHC rules.
Necessary permission will be obtained from the
Explosives Dept.

3.2 Changes in occurrence of disease No Suitable drainage and waste management measures will
be adopted in both construction and operational
or affect disease vectors (e.g.
phase, which will restrict the stagnation of water or
insect or water borne diseases)
accumulation of waste. This will effectively restrict the
reproduction and growth of disease vectors.

3.3 Affect the welfare of people e.g. No No use, storage, transport, handling or production of
by changing living conditions? any harmful product is envisaged from the proposed
project activities. Thus, no major adverse impacts on
the human health / environment are envisaged.

Moreover, this project will provide employment to


local labours in the construction phase and workers
during operation phase. The proposed project will
have beneficial impacts.

3.4 Vulnerable groups of people who No No effect is envisaged due to this project.
could be affected by the project
e.g. hospital patients, children,
the elderly etc.,

3.5 Any other cause None No, other causes are involved except the mentioned
above.

M/s. ATS Infratech Pvt. Ltd. 10 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

4. Production of solid wastes during construction or operation or decommissioning


(MT/month)

S. Information / Checklist Yes/ Details there


thereof
reof (with appr
approximate qua
quantities/
uantities/ rates,
No. confirma
confirmation No where
herev
rever possible) w ith source of information da
data

4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine wastes will be
generated.

4.2 Municipal waste (domestic and Yes Solid wastes likely to be generated in project are of
or commercial wastes) domestic & commercial nature.
Approximately, 13469.25 kg/day domestic solid waste
(Permanent Population: 202.50 kg/day & Floating
Population: 13266.75 kg/day) is estimated to be
generated during Peak days & Approximately, 876.75
kg/day domestic solid waste (Permanent Population:
202.50 kg/day & Floating Population: 674.25 kg/day) is
estimated to be generated during Non-Peak days from
the project activity. Base of calculation @
450gms/person/day for residential and 250
gm/person/day for floating population.

Commercial Waste (E-wastes : E-waste will start being


(E-wastes):
generated after a latency period of 4-5 years. Since
most of these components are recyclable in nature,
efforts will be made to recycle it to the maximum
extent, hence actual waste generated as E-waste should
be minimal. It is estimated that from the project about
0.05-0.10 MT/yr E-waste will be generated.
Management of E-
E-waste
The principle idea of E-waste management is to recycle
the E-waste generated. Authorized vendors of
electronic goods will take back their old
equipment/cartridge/toner rolls etc. and pay some
concessions on the new equipment. On the other
hand, reusable material like cartridges/toners will be
refilled and reused. Outdated computers/ fax/ phones
etc. will be value added and sold to downstream uses
through resellers. These arrangements will be made
with existing CPCB authorized vendors to
simultaneously & effectively reduce the quantity of E-
waste generated and also to generate substantial
revenue for running the management system.

M/s. ATS Infratech Pvt. Ltd. 11 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

Whatever E-waste left, will be collected separately in


HDPE drums and will be stored in special
containments, onto puckka platforms and under lock
and key. The collected e –waste will be handed over
to the CPCB authorized vendors.

4.3 Hazardous wastes (as per Yes Spent Oil from D.G. sets will be carefully stored in
Hazardous Waste Management High Density Polythene (HDPE) drums in isolated
Rules) covered facility. This spent oil will be sold to vendors
authorized by HSPCB/ MoEF for the treatment of
same. Suitable care will be taken so that spills / leaks
of spent oil from storage could be avoided.

4.4 Other industrial process wastes No Not applicable, as this is a Sports Complex building
development of “International Level Cricket Stadium
cum Sports Complex” project

4.5 Surplus product No Not applicable, as this is a building development of


“International Level Cricket Stadium cum Sports
Complex” project

4.6 Sewage sludge or other sludge Yes The mechanism of sludge drying will be centrifugation
from effluent treatment and the dewatered/ dried sludge from STP will be
converted to cakes and will be used as manures in
horticulture and also disposed to designated municipal
area.

4.7 Construction or demolition Yes Construction waste generation will be limited to the
wastes construction phase only and will be limited to project
site only. These will be reused for backfilling after
manual segregation. Unusable and excess construction
debris will be disposed at designated places in tune
with the local norms. These wastes will be used for
road development activities.

4.8 Redundant machinery or No No Redundant machinery or equipment is involved.


equipment

4.9 Contaminated soils or other No No Contaminated soils or other materials are involved.
materials

4.10 Agricultural wastes No No agricultural waste will be generated.

4.11 Other solid waste No Not applicable, as this is a Sports Complex building
development of “International Level Cricket Stadium
cum Sports Complex” project

M/s. ATS Infratech Pvt. Ltd. 12 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. Information / Checklist Yes/ Details there


thereof
reof (with appr
approximate qua
quantities/r
uantities/ra
ntities/rates,
No. confirma
confirmation No where
herev
rever possible) with source of information da
data

5.1 Emissions from combustion of Yes The operation of proposed project does not envisage
fossil fuels from stationary or any major air pollutant generating sources except D.G.
mobile sources sets and vehicular movement. The emissions from
stationary sources (D.G. sets) have been predicted.

5.2 Emissions from production No Not applicable, as this is an “International Level Cricket
processes Stadium cum Sports Complex” Sports Complex building
development project.

5.3 Emissions from materials Yes Dust emissions may arise due to the materials handling
handling including storage or during construction phase; These will be restricted to the
transport construction phase and to the construction site only.
Regular water sprinkling & tarpaulin covers will be
provided to prevent dust emissions.

5.4 Emissions from construction Yes This will be restricted to the construction phase and to
activities including plant and the construction site only. Though these will be
equipment negligible in amount as they will occur from the
equipments movement involved in the construction.
Still suitable preventive measure will be taken.

5.5 Dust or odours from handling of Yes Dust is likely to be generated during construction, this
materials including construction will be water sprinkled and tarpaulin covers will
materials, sewage and waste be provided over stored raw material to reduce
dust emission.

On site sanitation facilities will be provided for


construction workers during construction phase so no
odor generation is envisaged.

5.6 Emissions from incineration of No Not applicable, as this is an “International Level Cricket
wastes Stadium cum Sports Complex” Sports Complex building
development project and there will be not any
incineration waste involved in this project.

5.7 Emissions from burning of waste No Not applicable, as this is an “International Level Cricket
in open air (e.g. slash materials, Stadium cum Sports Complex” Sports Complex building
construction debris) development project within the premises. So, Open
burning of biomass / other material will be prohibited.

5.8 Emissions from any other sources No No other Emissions from any other sources, except
mentioned above.

M/s. ATS Infratech Pvt. Ltd. 13 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. Information / Checklist Yes/ Details there


thereof
reof (with appr
approximate qua
quantities/r
uantities/ra
ntities/rates,
No. confirma
confirmation No where
herev
rever possible) with source of information da
data

6.1 From operation of equipment Yes The machinery which will be used for construction will
e.g. engines, ventilation plant, be of high standard and of reputed make and
crushers will adhere to international standard. These
standards itself take care of noise pollution control /
vibration control and air emission control. Hence
insignificant impacts due to construction machinery are
envisaged. Apart from this, the construction
activities will be restricted to daytime only.

Sources of noise in the operational phase will be D.G.


sets and from vehicular movement only. The D.G. sets
will be in operation during power failure only and will
generate noise level below 75 dB (A) each.

6.2 From industrial or similar No No major noise and vibration generating activities are
processes involved in the project, except due to running of
various construction equipments/ machinery & D.G.
Sets during renovation & expansion phase of the
project. Proper maintenance of machineries will reduce
the generation of noise and vibration. All the workers
will be equipped with PPE’s during construction phase
and the D.G. Sets will be installed in acoustic enclosures
with proper padding system to reduce vibration impact.

6.3 From construction or demolition Yes Due to the various construction activities, there will be
short-term noise impacts in the immediate vicinity of
the project site. The construction activities will include
the following noise generating activities:

• Excavation activities etc.

• Concreting and mixing

• Construction plant

• Heavy vehicle movement and

• Operation of D.G. sets

6.4 From blasting or piling No No blasting or mechanized piling will be done in


construction phase, this is a case of “International Level
Cricket Stadium cum Sports Complex” project.

6.5 From construction or Yes Some noise will be generated from vehicular movement

M/s. ATS Infratech Pvt. Ltd. 14 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

operational traffic in the construction and operational phase.

Local native plants will be use in tree plantation all


around the project site and road side to reduce the
impact of the air and Noise pollution.

6.6 From lighting or cooling systems Yes Cooling system will be efficient & of latest technology.

6.7 From any other sources No There will be no other sources for noise & vibration
generation except the mentioned above.

7. Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea:

S. Information/ Checklist Yes/ Details there


thereof
reof (w ith appr
approximate qua
quant
uantities/r
ntities/ra
ities/rates,
No. confirma
confirmation No where
herev
rever possible) with source of information da
data

7.1 From handling, storage, use or No Used oil from D.G. sets will be handled with care, it
spillage of hazardous materials will be stored in HDPE drums and provided to
authorized vendor. Hence, no risk of contamination is
envisaged.

7.2 From discharge of sewage or No The total water requirement of the project will be
other effluents to water or the 927.10 KLD during peak days (which will be included
land(expected mode and place the fresh water requirement of 314.50 KLD and
of discharge) recycled treated water requirement of 612.60 KLD for
flushing) & 171.50 KLD during non-peak days (which
will be included the fresh water requirement of 113
KLD and recycled treated water requirement of 58.50
KLD for flushing). The waste water generated from the
project site will be treated in STP of Capacity 170 KLD,
treated water will be reuse for green area, flushing,
HVAC/D.G. Cooling & Road Washing etc.

7.3 By deposition of pollutants No Minor Air emissions will be generated due to increased
emitted to air into the land or vehicular movement and occasional use of D.G. sets for
into water which effective measures will be taken like adequate
greenbelt development and use of low sulphur diesel in
D.G. sets etc. So there would not be any deposition of
pollutants emitted to air, land or water.

7.4 From any other sources No No any other sources are involved except the
mentioned above.

7.5 Is there a risk of long term build No Likelihood of such an event is not foreseen till now in
up of pollutants in the the area and suitable measures will be adopt to control
environment from these sources? and reduce emission, so that there will be no such risk

M/s. ATS Infratech Pvt. Ltd. 15 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

in the coming future.

8. Risk of accidents during construction or


or operation of the Project, which could affect human
health or the environment

S. Information / Checklist Yes/ Details there


thereof
reof (w ith appr
approximate qua
quantities/r
uantities/ra
ntities/rates,
No. confirma
confirmation No where
herev
rever possible) with source of information da
data

8.1 From explosions, spillages, fires No This is an “International Level Cricket Stadium cum
etc from storage, Sports Complex” Sports Complex building
handling, use or development project, does not involve major
production of hazardous hazardous construction activity. Hence chances of
substances explosions, spillages, fires are minimal.

During construction all construction workers will be


provided with suitable personal protective equipment
as required under the health & safety norms.
Awareness & Training about safety norms will be
provided to all the supervisors of construction
workers involved in construction activities

No major hazardous waste will be stored within


project site. No industrial or process activity is
involved in this project hence chances of chemical
hazards and accidents are minimal. However, suitable
fire fighting measures will be provided to reduce
chances of fire-accidents.

8.2 From any other causes No No any other causes are involved except the
mentioned above.

8.3 Could the project be affected by Yes The area under study falls in Zone-II, according to
natural disasters causing the Indian Standard Seismic Zoning Map. Suitable
environmental damage (e.g. seismic coefficients in horizontal and vertical
floods, earthquakes, landslides, directions respectively, have to be a d o p t e d w h i l e
cloudburst etc)? designing the structures.

There are no possibilities of the proposed project site


getting flooded as per records available.

9. Factors which should be considered (such as consequential development) which


which could lead
to environmental effects or the potential for cumulative impacts with other existing or
planned activities in the locality

M/s. ATS Infratech Pvt. Ltd. 16 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

S. Information / Checklist Yes/ Details there


thereof
reof (w ith appr
approximate qua
quantities/r
uantities/ra
ntities/rates,
No. confirma
confirmation No where
herev
rever possible)
possible) w ith source of information da
data

9.1 Lead to development of Yes The proposed “International Level Cricket Stadium cum
supporting utilities, ancillary Sports Complex” project is for Sports Complex building
development or development development; it may lead to development of supporting
stimulated by the project services and infrastructure in and around the area.
which could have impact on
the environment e.g.:

• Supporting infrastructure Yes The project will have positive impact on the ancillary
(roads, power supply, waste infrastructure like roads, markets, public health, amenities,
or waste water treatment, conveyance facilities etc. in the area.
etc.)

• housing development No Not applicable, as this is an “International Level Cricket


Stadium cum Sports Complex” Sports Complex building
development project.

• extractive industries No Not applicable, as this is an “International Level Cricket


Stadium cum Sports Complex” Sports Complex building
development project.

• supply industries No Not applicable, as this is an “International Level Cricket


Stadium cum Sports Complex” Sports Complex building
development project.

• other No Not applicable, not other action will be required except


mentioned above.

9.2 Lead to after-use of the site, No Negligible impact is envisaged on air, noise and aesthetic
which could have an impact on parameters due to the proposed Sports Complex building
the environment development project.

9.3 Set a precedent for later No Not applicable


developments

9.4 Have cumulative effects due to No The proposed project is an “International Level Cricket
proximity to other existing or Stadium cum Sports Complex” Sports Complex building
planned projects with similar project. A better-planned and executed project has to
effects yield better result individually.

M/s. ATS Infratech Pvt. Ltd. 17 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

III. Environmental Sensitivity

S. Areas Name/ Identity Aerial distance (within 15 km.)


No. Proposed project location boundary
1 Areas protected under international Tillpat Forest Approx. 12.0 km in WNW direction
conventions, national or local Range from the Project Site.
legislation for their ecological,
landscape, cultural or other related
value
2 Areas which are important or Hinden River Approx. 2.0 km in SE direction from
sensitive for ecological reasons - the Project Site.
Wetlands, watercourses or other Yamuna River Approx. 3.0 km in SW direction from
water bodies, coastal zone, the Project Site.
biospheres, mountains, forests
3 Areas used by protected, important None Not located within 15 km of the
or sensitive species of flora or fauna project location.
for breeding, nesting, foraging,
resting, over wintering, migration
4 Inland, coastal, marine or None Not located within 15 km of the
underground waters project location.
5 State, National boundaries Delhi State Approx. 16.0 km in NW direction from
border project site.
6 Routes or facilities used by the public Noida Approx. at 3.0 km in North direction
for access to recreation or other Expressway from project site.
tourist, pilgrim areas Yamuna Approx. 2.0 km in West direction from
Expressway) the Project Site.
7 Defence installations None Not located within 15.0 km of the
proposed project location.
8 Densely populated or built-up area Noida city Located at a distance of approx. 11.0
K.M in NNW direction from the
project site.
9 Areas occupied by sensitive man- Yes There are number of major hospitals,
made land uses (hospitals, schools, schools etc. There are numerous places
places of worship, community of worship and community within the
facilities) project influenced area.
10 Areas containing important, high Yes Ground-water resources in the study
quality or scarce resources (Ground area are depleting at very fast rate and
water resources, surface resources, are declared as scarce resource.
forestry, agriculture, fisheries,
tourism, minerals)
11 Areas already subjected to pollution No No Environmental damage reported
or environmental damage. (Those from the area so far. All parameters of
M/s. ATS Infratech Pvt. Ltd. 18 JM EnviroNet Pvt. Ltd.
Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

where existing legal environmental Air, Water, and Noise etc. will be
standards are exceeded) maintained within permissible limits
specified by SPCB / CPCB with proper
mitigation measures.
12 Areas susceptible to natural hazard None The area under study falls in Zone-IV,
which could cause the project to according to the Indian Standard
present Environmental problems Seismic Zoning Map. Suitable seismic
(Earthquakes, subsidence, landslides, coefficients in horizontal and
erosion, flooding or extreme or vertical directions respectively, will be
adverse climatic conditions) adopted while designing the structures
to mitigate the seismic impacts.
There are no possibilities of the
proposed project site getting flooded
as per records available.

M/s. ATS Infratech Pvt. Ltd. 19 JM EnviroNet Pvt. Ltd.


Proposed International Level Cricket Stadium cum Sports Complex
At: Plot No. SC-01/CS, Sector 152, Noida, District: Gautam Budh Nagar, State: U.P. (Form -1)

IV. Proposed Terms of Referenc


Reference: Not Applicabl
Applicable.
“I hereby given undertaking that the data and information given in the application and enclosures
are true to the best of my knowledge and belief and I am aware that if any part of the data and
information submitted is found to be false or misleading at any stage, the project will be rejected
and clearance give, if any to the project will be revoked at our risk and cost.”

Date: Signature of the applicant

Place:
Mr. S. J. Raza

Authorized Signatory
M/s ATS Homes Pvt. Ltd.
711/92, Deepali, Nehru Place, New Delhi-110019

NOTE:

1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit
with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing
the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State
Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be
taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for
the activities to be located in the CRZ.
2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves,
Migratory Corridors of Wild Animals, the project proponent shall submit the map duly
authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location
and the recommendations or comments of the Chief Wildlife Warden "thereon (at the stage of
EC)."
3. All correspondence with the Ministry of Environment & Forests including submission "of
application for TOR/Environmental Clearance, subsequent clarifications, as may be required
from time to time, participation in the EAC Meeting on behalf of the project proponent shall
be made by the authorized signatory only. The authorized signatory should also submit a
document in support of his claim of being an authorized signatory for the specific project".

M/s. ATS Infratech Pvt. Ltd. 20 JM EnviroNet Pvt. Ltd.