1. This document outlines the safe work procedures for a flooring installation job. It details 8 steps of the job and potential hazards at each step such as back injuries, electric shock, and fumes.
2. Controls are provided for each step to mitigate hazards, including proper lifting techniques, using dollies, protective equipment like gloves and masks, checking tools, and following WHMIS procedures.
3. The final steps include cleaning up debris and securing equipment safely before leaving the job site.
1. This document outlines the safe work procedures for a flooring installation job. It details 8 steps of the job and potential hazards at each step such as back injuries, electric shock, and fumes.
2. Controls are provided for each step to mitigate hazards, including proper lifting techniques, using dollies, protective equipment like gloves and masks, checking tools, and following WHMIS procedures.
3. The final steps include cleaning up debris and securing equipment safely before leaving the job site.
1. This document outlines the safe work procedures for a flooring installation job. It details 8 steps of the job and potential hazards at each step such as back injuries, electric shock, and fumes.
2. Controls are provided for each step to mitigate hazards, including proper lifting techniques, using dollies, protective equipment like gloves and masks, checking tools, and following WHMIS procedures.
3. The final steps include cleaning up debris and securing equipment safely before leaving the job site.
1. This document outlines the safe work procedures for a flooring installation job. It details 8 steps of the job and potential hazards at each step such as back injuries, electric shock, and fumes.
2. Controls are provided for each step to mitigate hazards, including proper lifting techniques, using dollies, protective equipment like gloves and masks, checking tools, and following WHMIS procedures.
3. The final steps include cleaning up debris and securing equipment safely before leaving the job site.
GENERAL NOTES: CSA Approved means Green Triangle Footwear
JOB SAFETY ANALYSIS:
Step Description Hazard Controls
1 Clean work area, move furniture Back injuries. Pulled and strained Use 2 wheel dollies, flat dollies. Lifting properly using legs, not back. muscles. 2 Prepare work area by removing Cuts, burns, pulled-strained muscles. Removal of materials in small enough amount or weights not to inflict existing floor i.e. tile, sheet Dust, nails, screws. or cause injury. Use of proper tools, knives, scrapers, etc. Use of goods, carpet proper personal safety wear i.e. dust masks, gloves, knee pads. 3 Leveling of sub floor Slivers from plywood underlay Wear gloves, knee pads 4 Tile installation Injury from lifting. Burns from torch and Boxes of tiles 65 lbs. Proper lifting procedures. Use of gloves, knee material, headaches, fumes, shock from pads, face masks, fans. Check all tools and electrical tools. WHMIS electrical hazards. Fire hazards. data and fire extinguisher available. 5 Installation of sheet goods Injuries from lifting, headaches, odor and Roll of sheet goods weight 300-400 lbs. Proper lifting procedures. fumes. Electric shock. Use of dollies. Use gloves, knee pads, fans and ensure proper ventilation. Check electrical tools. WHMIS data available. 6 Carpet Injuries from lifting, headaches, odor and Proper lifting procedures. Use dollies, gloves, knee pads and fans. fumes. Electric shock. Check all tools WHMIS data. 7 Installation of base (cove). Cuts, back injuries, strains Container of cove base approximately 40 lbs. Proper lifting and carrying procedures. WHMIS data available. 8 Clean-up of job site Surplus material, cuts, strains. Turn tank off. Disassemble torch and hose from propane tank. Plug tank. Tank to be left in secure area for pick-up.